Comment
Preferred Site Allocations 2018
Representation ID: 20051
Received: 05/03/2018
Respondent: National Highways
Representation Summary:
Current methodology prepared by PBA is broadly reasonable. If, however, the local highway authority plans to deter drivers from making use of certain routes or congestion hotspots cause a significant change in route choice, the total development trips on the strategic road network could alter from that presented within the Highway Modelling Report. The assessment undertaken to date suggests very high impacts to the SRN.
Full text:
See attached.