Support
Draft Local Plan
Representation ID: 15862
Received: 11/05/2016
Respondent: Sammi Developments Ltd
Agent: Phase 2 Planning and Development Ltd
Representation Summary:
This policy, which recognises the important role gateways providing an opportunity to provide a positive impression of the Borough, is supported. The Brook Street Roundabout (M25/A12/A1023 interchange) is recognised as being a key gateway and the representation site can make a positive contribution towards enhancement of this gateway. It is a suitable size for large Head Quarter Operations and users that require a large footprint of building, which cannot typically be accommodated within town centres, due to the more limited size of available sites.
Full text:
See attached.