Comment

Draft Local Plan

Representation ID: 15565

Received: 05/05/2016

Respondent: Croudace Strategic Ltd

Agent: Barton Willmore

Representation Summary:

Site 034 is dentified to deliver housing in the first 5 years: 40 dwellings to be delivered in 2018, and 80 dpa thereafter, up to 2025 (Appendix 3)

There is a possibility that the residential development of the Site could immediately follow the permitted Crossrail works. This would assist in reducing the level of construction necessary on the Site, and therefore reduce the associated impacts to the surroundings. It will assist BBC in realising its Strategic Objective no. 7 to optimise the social and economic benefits arising from Crossrail.

To meet development needs, we would seek the submission of an early planning application in respect of the Site. Although it is recognised that, in the context of National Green Belt policy, permission may not be granted until after the adoption of the Local Plan.

Full text:

See attached.

Attachments: