Object

Draft Local Plan

Representation ID: 15107

Received: 26/04/2016

Respondent: Ursuline Sisters

Agent: JTS Partnership LLP

Representation Summary:

The phasing of such allocations should not be constrained by an arbitrary 5 year phasing timetable. The delivery of new housing is often driven by economics and the general health of the economy, and where new development is being sought it should not be denied by the indicative phasing applied within Appendix 2 of the Local Plan. It is considered that the only relevant matter restricting the phasing of development is that set out at (c) of Policy 7.4, which requires infrastructure requirements of the development can be fully met and satisfactorily addressed.
Recommended Change: Delete (a) and (b) of Policy 7.4.

Full text:

See attached

Attachments: