Comment
Strategic Growth Options
Representation ID: 11208
Received: 17/02/2015
Respondent: EA Strategic Land LLP
Agent: Iceni Projects Limited
Representation Summary:
With an OAN identifying a need for 5,500 homes over the 15 year plan period, with potential for an increase, it is important that all of the options are fully and soundly assessed. Paragraph 1.4 of the SGO confirms that the maximum capacity of the urban brownfield sites (including the West Horndon Industrial Estate) is 2,500 dwellings. As such, the plan needs to provide sufficient land to accommodate a minimum of 3,000 homes (potentially rising to 6,000) on greenfield sites.
Full text:
See attached documentation.