Draft Local Plan

Policy 5.3: Job Growth and Employment Land

Representation ID: 15772

Received: 11/05/2016

Respondent: Essex County Council

Representation Summary:

ECC supports the proposed strategy of providing a range of employment and business development, through new employment (B use) land and existing employment sites, and their redevelopment where appropriate.

Full text:

See attached

Attachments:

Comment

Draft Local Plan

Policy 8.2: Brentwood Enterprise Park

Representation ID: 15775

Received: 11/05/2016

Respondent: Essex County Council

Representation Summary:

ECC and Highways England would seek additional evidence regarding any impact of the Brentwood Enterprise Park on the strategic junction, local road network and any necessary mitigation requirements. The potential impact on the above would also depend on the mix of B1, B2 and B8 uses proposed on the site.
The location is not favourable to sustainable transport measures and additional clarification will be required on this.

Criterion di) - reference is made to the need for a `Green Travel Plan'. Amend to read `Travel Plan', and to be consistent with Policy 8.3, criterion f.

Full text:

See attached

Attachments:

Support

Draft Local Plan

Policy 8.6: Brentwood Town Centre

Representation ID: 15777

Received: 11/05/2016

Respondent: Essex County Council

Representation Summary:

Brentwood Economic Futures Study 2015-2030 welcomed.
Welcome the commitment to progress a Brentwood Town Centre Masterplan, which will consider options to boost the Town Centre offer and improve the linkages across the wider area.

Full text:

See attached

Attachments:

Comment

Draft Local Plan

Policy 8.1: Strong and Competitive Economy

Representation ID: 15778

Received: 11/05/2016

Respondent: Essex County Council

Representation Summary:

The importance of telecommunications and broadband as an infrastructure requirement and its links to economic growth is welcomed. However, Policy 8.1 should be strengthened by making reference to the need for collaborative working with ECC, communication operators and providers for high quality communications infrastructure in all new and existing development.
It is recommended that this is done through support of measures such as requiring high-speed Broadband for key areas, such as Warley Business Park, the proposed Brentwood Enterprise Park or Brentwood Town Centre.
Suggested wording could be:
`High quality communications infrastructure will be provided by working collaboratively with Essex County Council, communications operators and providers, and supporting initiatives, technologies and developments which increase and improve coverage and quality throughout the Borough.'

Full text:

See attached

Attachments:

Comment

Draft Local Plan

Policy 5.1: Spatial Strategy

Representation ID: 15780

Received: 11/05/2016

Respondent: Essex County Council

Representation Summary:

Brentwood Council will need to be satisfied that it has identified its preferred spatial strategy, which includes significant Green Belt release, based on a range of proportionate evidence. In so doing, BBC will need to be able to demonstrate that it has considered all reasonable locations for future growth against the criteria outlined in Policy 9.8 Green Belt, and demonstrate the most appropriate sites have been identified for allocation.

Full text:

See attached

Attachments:

Comment

Draft Local Plan

Chapter 4. Strategic Objectives

Representation ID: 15781

Received: 11/05/2016

Respondent: Essex County Council

Representation Summary:

In acknowledgment of Strategic Objectives S01, S02 & S013;
ECC, as highway authority is reviewing the draft highway modelling report. In progressing the report, joint working will be established between relevant partners to identify necessary mitigation at relevant junctions; consider the cumulative impact of growth within the Borough; and consider the impact of wider planned growth (i.e. A127 Corridor authorities) on the local and strategic route network. Regular meetings are to be established between ECC, HE, BBC, and Peter Brett Associates (its highway consultants) to ensure this work is progressed to inform the Pre Submission Local Plan and inform the Infrastructure Delivery Plan (IDP). The IDP will need to identify the mitigation required, their costings, priorities and timescales for delivery, and phasing in relation to housing delivery.

Full text:

See attached

Attachments:

Support

Draft Local Plan

Policy 10.1: Sustainable Transport

Representation ID: 15784

Received: 11/05/2016

Respondent: Essex County Council

Representation Summary:

ECC supports proposals promoting sustainable transport. ECC would support the consideration for passenger transport in large scale developments at the earliest opportunity, which should be considered to be the responsibility of the developer.

Full text:

See attached

Attachments:

Comment

Draft Local Plan

Policy 10.2: Parking

Representation ID: 15785

Received: 11/05/2016

Respondent: Essex County Council

Representation Summary:

Policy 10.2 refers to the adopted Essex Planning Officers Association (EPOA) Vehicle Parking Standards. These are currently being reviewed, and will be subject to public consultation in March 2016 for a period of 6 weeks.

Full text:

See attached

Attachments:

Comment

Draft Local Plan

Sustainable Transport

Representation ID: 15786

Received: 11/05/2016

Respondent: Essex County Council

Representation Summary:

For all stations (not just Brentwood and Shenfield), park and walk, or park and ride sites, are potential tools that could form part of an overall parking and access strategy.

Full text:

See attached

Attachments:

Support

Draft Local Plan

Sustainable Transport

Representation ID: 15787

Received: 11/05/2016

Respondent: Essex County Council

Representation Summary:

Para 10.9: ECC supports the aspiration to improve the public realm and circulation arrangements around Brentwood and Shenfield. In addition similar improvements may be necessary at Ingatestone and West Horndon stations.

Full text:

See attached

Attachments: