Strategic Growth Options
Search representations
Results for National Grid UK search
New searchComment
Strategic Growth Options
038B Land East of Thorndon Avenue, West Horndon
Representation ID: 5405
Received: 11/02/2015
Respondent: National Grid UK
The site is crossed by a high pressure line from Mardyke Station to Stock Station. Construction traffic should only cross the pipeline at locations agreed with National Grid. For all assets the contractor/developer will need to consider the clearance and necessary protection measures. No piling should take place within 15m of gas distribution assets without prior agreement. National Grid will need to ensure that access to the piplines is maintained during and after construction. (see full rep for further details)
see attached
Comment
Strategic Growth Options
126 Land East of West Horndon, South of Station Road
Representation ID: 5407
Received: 11/02/2015
Respondent: National Grid UK
The site is crossed by a high pressure line from Mardyke Station to Stock Station. Construction traffic should only cross the pipeline at locations agreed with National Grid. For all assets the contractor/developer will need to consider the clearance and necessary protection measures. No piling should take place within 15m of gas distribution assets without prior agreement. National Grid will need to ensure that access to the piplines is maintained during and after construction. (see full rep for further details)
see attached
Comment
Strategic Growth Options
175C Land at M25 J28, Brook Street, Brentwood (including existing buildings), and surrounding land
Representation ID: 5408
Received: 11/02/2015
Respondent: National Grid UK
The site is crossed by a high pressure line from Horndon to Abridge. Construction traffic should only cross the pipeline at locations agreed with National Grid. For all assets the contractor/developer will need to consider the clearance and necessary protection measures. No piling should take place within 15m of gas distribution assets without prior agreement. National Grid will need to ensure that access to the piplines is maintained during and after construction. (see full rep for further details)
see attached
Comment
Strategic Growth Options
128 Ingatestone Garden Centre, Roman Road, Ingatestone
Representation ID: 5410
Received: 11/02/2015
Respondent: National Grid UK
The site is crossed by a high pressure line from Hainault to Ashingdon. Construction traffic should only cross the pipeline at locations agreed with National Grid. For all assets the contractor/developer will need to consider the clearance and necessary protection measures. No piling should take place within 15m of gas distribution assets without prior agreement. National Grid will need to ensure that access to the piplines is maintained during and after construction. (see full rep for further details)
see attached
Comment
Strategic Growth Options
028C Land east of Running Waters, Brentwood
Representation ID: 5412
Received: 11/02/2015
Respondent: National Grid UK
The site is crossed by a high pressure line from Mardyke Station to Stock Station. Construction traffic should only cross the pipeline at locations agreed with National Grid. For all assets the contractor/developer will need to consider the clearance and necessary protection measures. No piling should take place within 15m of gas distribution assets without prior agreement. National Grid will need to ensure that access to the piplines is maintained during and after construction. (see full rep for further details)
see attached
Comment
Strategic Growth Options
192 Heron Hall, Herongate, Brentwood
Representation ID: 5413
Received: 11/02/2015
Respondent: National Grid UK
The site is crossed by a high pressure line from Mardyke Station to Stock Station. Construction traffic should only cross the pipeline at locations agreed with National Grid. For all assets the contractor/developer will need to consider the clearance and necessary protection measures. No piling should take place within 15m of gas distribution assets without prior agreement. National Grid will need to ensure that access to the piplines is maintained during and after construction. (see full rep for further details)
see attached
Comment
Strategic Growth Options
Question 12
Representation ID: 5414
Received: 11/02/2015
Respondent: National Grid UK
In addition to sites specified with high or intermediate pressure gas distribution apparatus low and medium pressure distribution pipes are likely to exist within the sites proposed.
see attached