Strategic Growth Options

Search representations

Results for National Grid UK search

New search New search

Comment

Strategic Growth Options

038B Land East of Thorndon Avenue, West Horndon

Representation ID: 5405

Received: 11/02/2015

Respondent: National Grid UK

Representation Summary:

The site is crossed by a high pressure line from Mardyke Station to Stock Station. Construction traffic should only cross the pipeline at locations agreed with National Grid. For all assets the contractor/developer will need to consider the clearance and necessary protection measures. No piling should take place within 15m of gas distribution assets without prior agreement. National Grid will need to ensure that access to the piplines is maintained during and after construction. (see full rep for further details)

Full text:

see attached

Attachments:

Comment

Strategic Growth Options

126 Land East of West Horndon, South of Station Road

Representation ID: 5407

Received: 11/02/2015

Respondent: National Grid UK

Representation Summary:

The site is crossed by a high pressure line from Mardyke Station to Stock Station. Construction traffic should only cross the pipeline at locations agreed with National Grid. For all assets the contractor/developer will need to consider the clearance and necessary protection measures. No piling should take place within 15m of gas distribution assets without prior agreement. National Grid will need to ensure that access to the piplines is maintained during and after construction. (see full rep for further details)

Full text:

see attached

Attachments:

Comment

Strategic Growth Options

175C Land at M25 J28, Brook Street, Brentwood (including existing buildings), and surrounding land

Representation ID: 5408

Received: 11/02/2015

Respondent: National Grid UK

Representation Summary:

The site is crossed by a high pressure line from Horndon to Abridge. Construction traffic should only cross the pipeline at locations agreed with National Grid. For all assets the contractor/developer will need to consider the clearance and necessary protection measures. No piling should take place within 15m of gas distribution assets without prior agreement. National Grid will need to ensure that access to the piplines is maintained during and after construction. (see full rep for further details)

Full text:

see attached

Attachments:

Comment

Strategic Growth Options

128 Ingatestone Garden Centre, Roman Road, Ingatestone

Representation ID: 5410

Received: 11/02/2015

Respondent: National Grid UK

Representation Summary:

The site is crossed by a high pressure line from Hainault to Ashingdon. Construction traffic should only cross the pipeline at locations agreed with National Grid. For all assets the contractor/developer will need to consider the clearance and necessary protection measures. No piling should take place within 15m of gas distribution assets without prior agreement. National Grid will need to ensure that access to the piplines is maintained during and after construction. (see full rep for further details)

Full text:

see attached

Attachments:

Comment

Strategic Growth Options

028C Land east of Running Waters, Brentwood

Representation ID: 5412

Received: 11/02/2015

Respondent: National Grid UK

Representation Summary:

The site is crossed by a high pressure line from Mardyke Station to Stock Station. Construction traffic should only cross the pipeline at locations agreed with National Grid. For all assets the contractor/developer will need to consider the clearance and necessary protection measures. No piling should take place within 15m of gas distribution assets without prior agreement. National Grid will need to ensure that access to the piplines is maintained during and after construction. (see full rep for further details)

Full text:

see attached

Attachments:

Comment

Strategic Growth Options

192 Heron Hall, Herongate, Brentwood

Representation ID: 5413

Received: 11/02/2015

Respondent: National Grid UK

Representation Summary:

The site is crossed by a high pressure line from Mardyke Station to Stock Station. Construction traffic should only cross the pipeline at locations agreed with National Grid. For all assets the contractor/developer will need to consider the clearance and necessary protection measures. No piling should take place within 15m of gas distribution assets without prior agreement. National Grid will need to ensure that access to the piplines is maintained during and after construction. (see full rep for further details)

Full text:

see attached

Attachments:

Comment

Strategic Growth Options

Question 12

Representation ID: 5414

Received: 11/02/2015

Respondent: National Grid UK

Representation Summary:

In addition to sites specified with high or intermediate pressure gas distribution apparatus low and medium pressure distribution pipes are likely to exist within the sites proposed.

Full text:

see attached

Attachments:

For instructions on how to use the system and make comments, please see our help guide.