Representation ID: 23907

Received: 19/03/2019

Respondent: Essex Partnership University NHS Foundation Trust

Agent: Bidwells

Representation Summary:

We consider that Brentwood Urban Area's placement at the top of the Settlement Hierarchy, including Warley, is appropriate and justified. Warley as part of the Brentwood Urban Area provides a wide range of services and employment opportunities, is highly accessible and well served by public transport - this is demonstrated by being only 800m from Brentwood mainline / Crossrail station.

Attachments:

Support

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

Local Housing Need

Representation ID: 23908

Received: 19/03/2019

Respondent: Essex Partnership University NHS Foundation Trust

Agent: Bidwells

Representation Summary:

The emerging Plan states it will allocate land to exceed the identified local housing need to provide flexibility in the supply and delivery of sites. We support the approach to significantly boost the supply of new housing because it demonstrates that the Plan is positively prepared. This should mean that at the site-specific level, allocations for development, including the Land at Nags Head Lane, should seek to deliver the maximum quantum of development possible, taking account of site constraints and masterplans where applicable.

Attachments:

Support

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

Transit-orientated Growth

Representation ID: 23909

Received: 19/03/2019

Respondent: Essex Partnership University NHS Foundation Trust

Agent: Bidwells

Representation Summary:

Allocating development in the transit corridors ensures that new homes will be sustainably located, linked to existing service centres through proximity and accessibility to strategic transport infrastructure. We consider this an appropriate and justified strategy.

Attachments:

Support

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

POLICY SP01: SUSTAINABLE DEVELOPMENT

Representation ID: 23910

Received: 19/03/2019

Respondent: Essex Partnership University NHS Foundation Trust

Agent: Bidwells

Representation Summary:

This policy advocates a positive approach to considering developments that accord with the presumption in favour of sustainable development as set out in paragraph 11 of the NPPF. Clearly this is consistent with national policy and we support this approach. Paragraph C of the policy aligns with the NPPF requirement for development that accords with the emerging Local Plan to be approved without delay unless material considerations indicate otherwise.

Attachments:

Support

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

POLICY SP02: MANAGING GROWTH

Representation ID: 23911

Received: 19/03/2019

Respondent: Essex Partnership University NHS Foundation Trust

Agent: Bidwells

Representation Summary:

This policy seeks to direct development to the site allocations set out in the Local Plan and within the highly accessible locations along transit/growth corridors. Land off Warley Hill would accord with both of these principles, so we support this policy.

Attachments:

Support

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

POLICY NE13: SITE ALLOCATIONS IN THE GREEN BELT

Representation ID: 23912

Received: 19/03/2019

Respondent: Essex Partnership University NHS Foundation Trust

Agent: Bidwells

Representation Summary:

Support the release of sites from the Green Belt for development as a justified approach given the lack of alternatives in the Borough. This is consistent with national policy, namely paragraph 136 of the NPPF, which makes allowance for the alteration of Green Belt boundaries through the preparation or updating of Plans where exceptional circumstances are fully evidenced and justified.

Attachments:

Support

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

POLICY R09: LAND OFF WARLEY HILL

Representation ID: 23913

Received: 19/03/2019

Respondent: Essex Partnership University NHS Foundation Trust

Agent: Bidwells

Representation Summary:

Fully support the allocation of Site R09 for residential development and EPUT is committed to the delivery of the site in accordance with policy R09. The site is sustainably located, previously developed, surplus to its former public sector requirements and is currently vacant, representing an excellent opportunity to deliver homes on brownfield land. The site's removal from the Green Belt is fully justified. Development of the site would contribute towards sustainable patterns of development and contribute towards the 5-year housing land supply. Site can deliver a high-quality development scheme incorporating substantial areas of landscaping and open space.