POLICY NE02: RECREATIONAL DISTURBANCE AVOIDANCE AND MITIGATION STRATEGY (RAMS)

Representation ID: 23210

Received: 19/03/2019

Respondent: Thames Water

Representation Summary:

Thames Water support the content of Policy NE2 parts D and E and encourage developers proposing developments to engage with them at an early stage to discuss the wastewater infrastructure requirements for development. The proposed policy ensures that the Local Plan is consistent with Paragraphs 20 and 41 of the NPPF. Alongside the proposed amended text for Policy SP04, the policy will help ensure the effective delivery of any sewerage network reinforcement works necessary to support development.

Attachments:

Support

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

POLICY SP01: SUSTAINABLE DEVELOPMENT

Representation ID: 23211

Received: 19/03/2019

Respondent: Thames Water

Representation Summary:

Support the aim of Policy SP01(D). However, as worded the policy would only be effective in ensuring that development itself has no unacceptable impact on amenity. Consideration is also required to be given to whether the location of proposed development is appropriate taking into account existing sources of noise, odour and vibration to ensure that future occupiers will not be adversely affected by such issues. Where development would be affected by an existing source of pollution, development should only be allowed where it is demonstrated that suitable mitigation measures can be put in place and how these will be delivered.

Attachments:

Support

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

POLICY SP04: DEVELOPER CONTRIBUTIONS

Representation ID: 23212

Received: 19/03/2019

Respondent: Thames Water

Representation Summary:

Support the policy in principle. However, it is not possible for any necessary upgrades to be secured through CIL or S106 contributions. In order to ensure that any necessary sewerage infrastructure reinforcement works required to support a development are delivered ahead of the occupation of development it may be necessary for planning conditions to be used to ensure that a development or phase of development is not occupied until the required upgrade has been delivered. To help ensure this Policy SP04 should make reference to the use of planning conditions as a mechanism alongside S106 and CIL.

Attachments:

Support

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

POLICY R04 AND R05: FORD HEADQUARTERS AND COUNCIL DEPOT

Representation ID: 23213

Received: 19/03/2019

Respondent: Thames Water

Representation Summary:

The wastewater network capacity in this area may be unable to support the demand anticipated from this development. Local upgrades to the existing drainage infrastructure may be required to ensure sufficient capacity is brought forward ahead of the development. Where there is a potential wastewater network capacity constraint, the developer should liaise with Thames Water to determine whether a detailed drainage strategy informing what infrastructure is required, where, when and how it will be delivered is required. The detailed drainage strategy should be submitted with the planning application.

Attachments:

Support

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

POLICY R06: LAND OFF NAGS HEAD LANE

Representation ID: 23214

Received: 19/03/2019

Respondent: Thames Water

Representation Summary:

The wastewater network capacity in this area may be unable to support the demand anticipated from this development. Local upgrades to the existing drainage infrastructure may be required to ensure sufficient capacity is brought forward ahead of the development. Where there is a potential wastewater network capacity constraint, the developer should liaise with Thames Water to determine whether a detailed drainage strategy informing what infrastructure is required, where, when and how it will be delivered is required. The detailed drainage strategy should be submitted with the planning application.

Attachments:

Support

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

POLICY R07: SOW AND GROW NURSERY

Representation ID: 23215

Received: 19/03/2019

Respondent: Thames Water

Representation Summary:

On the information available to date we do not envisage infrastructure concern regarding wastewater network or wastewater treatment infrastructure capability in relation to this site/s. It is recommended that the Developer and the Local Planning Authority liaise with Thames Water at the earliest opportunity to advise of the developments phasing.

Attachments:

Support

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

POLICY R08: LAND AT MASCALLS LANE

Representation ID: 23216

Received: 19/03/2019

Respondent: Thames Water

Representation Summary:

On the information available to date we do not envisage infrastructure concern regarding wastewater network or wastewater treatment infrastructure capability in relation to this site/s. It is recommended that the Developer and the Local Planning Authority liaise with Thames Water at the earliest opportunity to advise of the developments phasing. We do not envisage network infrastructure concerns regarding wastewater infrastructure capability in relation to this site on a basis that it wont be any surface water connection into a public foul sewer system.

Attachments:

Support

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

POLICY R09: LAND OFF WARLEY HILL

Representation ID: 23217

Received: 19/03/2019

Respondent: Thames Water

Representation Summary:

On the information available to date we do not envisage infrastructure concern regarding wastewater network or wastewater treatment infrastructure capability in relation to this site/s. It is recommended that the Developer and the Local Planning Authority liaise with Thames Water at the earliest opportunity to advise of the developments phasing. Drainage hierarchy to be followed in addressing surface water. As this is a brown field site, we expect significant reduction in surface water runoff.

Attachments:

Support

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

POLICY R10: BRENTWOOD RAILWAY STATION CAR PARK

Representation ID: 23219

Received: 19/03/2019

Respondent: Thames Water

Representation Summary:

The wastewater network capacity in this area may be unable to support the demand anticipated from this development. Local upgrades to the existing drainage infrastructure may be required to ensure sufficient capacity is brought forward ahead of the development. Where there is a potential wastewater network capacity constraint, the developer should liaise with Thames Water to determine whether a detailed drainage strategy informing what infrastructure is required, where, when and how it will be delivered is required. The detailed drainage strategy should be submitted with the planning application.

Attachments:

Support

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

POLICY R11: WESTBURY ROAD CAR PARK

Representation ID: 23220

Received: 19/03/2019

Respondent: Thames Water

Representation Summary:

On the information available to date we do not envisage infrastructure concern regarding wastewater network or wastewater treatment infrastructure capability in relation to this site/s. It is recommended that the Developer and the Local Planning Authority liaise with Thames Water at the earliest opportunity to advise of the developments phasing. Drainage hierarchy to be followed in addressing surface water. As this is a brown field site, we expect significant reduction in surface water runoff.