Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

Search representations

Results for Basildon Borough Council search

New search New search

Object

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

9.36

Representation ID: 23169

Received: 19/03/2019

Respondent: Basildon Borough Council

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

Although the Plan includes specific references that the joint borough boundary needs a degree of landscape and Green Belt treatment to maintain a visual separation, it does not elaborate as to how this will be achieved. It is disappointing that the joint study in 2017, Dunton Area Landscape Corridor Design Options Study, does not form part of the referenced and published evidence base for the Plan, nor do the outcomes from this work appear to have informed Policy R01(II) as sought through the earlier Duty to Cooperate engagement. The Council therefore objects to Policy R01(II) and Paragraph 9.36.

Attachments:

Object

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

POLICY R01 (I): DUNTON HILLS GARDEN VILLAGE STRATEGIC ALLOCATION

Representation ID: 23170

Received: 19/03/2019

Respondent: Basildon Borough Council

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

Delivery of DHGV will commence in 2022/23 at a rate of 100 homes per annum, climbing to 300 homes per annum by 2026/27. This seems overly optimistic given that the allocation is currently within Green Belt, requires masterplanning and will need to go through a planning application and elements of the condition discharge process before development can commence. No evidence is provided as to how the housing trajectory has been developed. No evidence or any form of a development framework / masterplan for DHGV explains how the proposed accelerated rate of delivery will be possible.

Attachments:

Object

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

Appendix 1: Local Development Plan Housing Trajectory

Representation ID: 23171

Received: 19/03/2019

Respondent: Basildon Borough Council

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

Delivery of DHGV will commence in 2022/23 at a rate of 100 homes per annum, climbing to 300 homes per annum by 2026/27. This seems overly optimistic given that the allocation is currently within Green Belt, requires masterplanning and will need to go through a planning application and elements of the condition discharge process before development can commence. No evidence is provided as to how the housing trajectory has been developed. No evidence or any form of a development framework/ masterplan for DHGV explains how the proposed accelerated rate of delivery will be possible.

Attachments:

Object

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

POLICY R01 (II): SPATIAL DESIGN OF DUNTON HILLS GARDEN VILLAGE

Representation ID: 23172

Received: 19/03/2019

Respondent: Basildon Borough Council

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

Basildon Council would like to seek assurances written into Policy R01(II) that it will be invited by Brentwood Council to become more involved in the detailed design and delivery of the new village. This will ensure that the strategic and cross-boundary impacts covered by the Duty to Cooperate and raised during the Council's response to the Plan at Regulation 18 and 19 stages are managed effectively during the development's implementation stages (assuming it is considered sound), alongside the Basildon Borough Local Plan's own implementation.

Attachments:

For instructions on how to use the system and make comments, please see our help guide.