Funding of infrastructure, foul wastewater infrastructure requirements would be dependent on development location, size and phasing. All sites will require local connection to the existing network (may include upgrades). Local connections and sewer reinforcements would be funded by developers through provisions of the Water Industry Act (1991). The statutory undertaker is responsible for any necessary upgrades to Sewage Treatment Works.

Infrastructure funding will be managed within the Act and will not be required to form part of CIL. Surface water management is managed in accordance with Building Regs part H and NPPF Technical Guidance (may require CIL or s106 contributions).