R21 - Land south of Ingatestone

Showing comments and forms 1 to 2 of 2

Object

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

Representation ID: 22176

Received: 05/02/2019

Respondent: Mrs Lisa Bryanton

Legally compliant? No

Sound? No

Duty to co-operate? No

Representation Summary:

Our home is on this land you have squared off so does that mean our house is going? The rain water goes into a stream on our land, once concrete is down then this will have to take the excess of water and our garden will be flooded.

Change suggested by respondent:

Our house is not showing on the land which is worrying and we need to know we are not going to be put in hardship by our garden flooding as well as issues with our home insurance. The field flood all the time and Redrow have been provided with evidence of this. We would ask building work is comply complete on the land that was built on with the Nursery and the land not built on the leads to the railway line is left as it always has been.

Full text:

Our home is on this land you have squared off so does that mean our house is going? The rain water goes into a stream on our land, once concrete is down then this will have to take the excess of water and our garden will be flooded.

Object

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

Representation ID: 22181

Received: 11/02/2019

Respondent: mr James Kemble

Legally compliant? No

Sound? No

Duty to co-operate? No

Representation Summary:

Site R21 includes the Council Recycling/Waste facility south of the former Garden Centre. The Recycling/Waste facility should be retained in its present location on the edge of the village but away from residences. The proposal to build houses on the field currently used as a gravel depository south of the Recycling / Waste Centre ignores the dangerous access to the A12 which would be created.

Change suggested by respondent:

Delete Site R21 (former Garden Centre, Recycling/Waste Centre and field south of Recycling/Waste Centre) from the list for building on.

Full text:

Site R21 includes the Council Recycling/Waste facility south of the former Garden Centre. The Recycling/Waste facility should be retained in its present location on the edge of the village but away from residences. The proposal to build houses on the field currently used as a gravel depository south of the Recycling / Waste Centre ignores the dangerous access to the A12 which would be created.