POLICY R03: LAND NORTH OF SHENFIELD

Showing comments and forms 1 to 15 of 15

Object

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

Representation ID: 22209

Received: 05/03/2019

Respondent: D Westfall

Legally compliant? No

Sound? No

Duty to co-operate? No

Representation Summary:

Little or no extra local transport infrastructure with regards to main road or rail links. The existing nearby road and rail links are near bursting point already, esp at rush hour(s).

Change suggested by respondent:

Fewer houses to be built, the total is far too many in too short a period of time.
OR provide the required supporting service first, i.e. extra local hospitals, more local doctors/dentists, much better rail links, much better bus links etc, and then build your new town.

Full text:

Far too many houses with no apparent provision for extra supporting services i.e. school places, Doctors/Dentists surgeries, local shops to serve the new estate etc.

Little or no extra local transport infrastructure with regards to main road or rail links. The existing nearby road and rail links are near bursting point already, esp at rush hour(s).

The plan seems to not take into account the quality of life for the people already living in the area, and just crams more people in.

Object

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

Representation ID: 22392

Received: 18/03/2019

Respondent: Sport England

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

Sport England objects to part of the allocation of Land north of Shenfield, for residential development in the local plan as it would potentially result in the loss of operational playing field sites at Shenfield High School and Alexander Park that are used extensively by the community and Shenfield High School without any proposals for mitigation in the site allocation policy. This would be contrary to Government policy in the NPPF, policy BE23 of the emerging local plan and Sport England's playing fields policy that is used as a statutory consultee.

Change suggested by respondent:

The removal of the Shenfield High School and Alexander Park playing fields from the R03 from the local plan would be the preferred solution to addressing this objection. However, as an alternative, potential may exist for this objection to be addressed in accordance with paragraph 97 of the NPPF, policy BE23 of the local plan and Sport England's playing fields policy if the playing fields were acceptably replaced as a requirement of the site allocation policy. To address this, the development principles in the site allocation policy would need to set out that the playing fields and supporting facilities at Shenfield High School and Alexander Park would either need to be retained unless replacement playing field provision (including ancillary facilities such as the pavilion and car parking) was made which was equivalent or better provision in terms of quantity and quality on the wider site allocation prior to any development commencing. Any replacement provision would need to avoid prejudicing Shenfield High School or the community from meeting their needs.

The authority will be aware that Sport England would be a statutory consultee on any future planning application for development on this site which affects the playing fields. As the principle of development on this site will be considered through the local plan rather than a planning application, it will be important that the Council engages Sport England with a view to reaching a mutually agreeable solution through the local plan process. We would wish to avoid a potential scenario where we would have no option but to object to a future planning application due to the matters set out above not being satisfactorily addressed through the local plan. This scenario is likely to result in uncertainties and delays with respect to the delivery of development on this site.

To take this matter forward with a view to reaching a mutually agreeable solution in advance of the matter being considered at the local plan examination, the Council are urged to engage with Sport England to explore a potential solution.

Full text:

Sport England objects to part of the allocation of Land North of Shenfield for residential development in the local plan. While acknowledging that only 28.2 of the 58.2 hectare site is proposed for development, a substantial area of the southern part of the allocation includes Shenfield High School's playing fields and the adjoining Alexander Park to the east of the school's playing fields.

Shenfield High School's playing fields, which are located on both sides of Alexander Lane, are a strategically important site for meeting community playing field needs in Brentwood Borough and contains six junior and mini football pitches of different sizes plus a non-turf cricket wicket. The playing fields to the south of Alexander Lane adjoining the school buildings also contain a full size floodlit artificial grass pitch (3G surface) and a pavilion containing six team changing rooms and social facilities. As demonstrated by the Council's recent playing pitch strategy, the playing pitches and supporting pavilion are used extensively by the community as well as the school and demand for the use of the artificial grass pitch exceeds capacity at peak times. The Essex County FA have advised that the artificial grass pitch provides Hutton Football Club (who run around 60 teams) with a training and match play venue and that the school's main and detached playing fields are also used by the club who are one of the Borough's largest community youth football clubs. Alexander Park is a small public playing field containing two mini soccer pitches and is in active community use and is currently used by Hutton FC's mini football teams. The loss of any of these facilities would have a huge impact on community grassroots football in Brentwood Borough and would add extra pressure to an already stretched grass pitch stock.

The Council's new Playing Pitch Strategy (November 2018), which forms the local plan's current evidence base for sports facilities, has assessed community playing pitch needs in detail and has identified deficiencies in provision especially for youth and mini football pitches and 3G artificial grass pitches. The sites were assessed as part of the strategy and identified that the pitches were being fully used by the community and that some pitches were being overplayed (i.e. level of use was exceeding their carrying capacity). The strategy has confirmed that both the Shenfield High School and Alexander Park sites should be protected through the local plan. The study has not identified that any playing fields be disposed of because they are surplus to requirements.

In addition to meet community needs, the Shenfield High School playing fields are needed for meeting the school's PE and sports needs and the site allocation would potentially prejudice the school from meeting their needs. Even if the playing fields were replaced elsewhere on the R03 allocation site, it is difficult to see how they could be replaced without the playing fields being divorced from the school site and the consequent implication for meeting the school's PE curriculum.

A further constraint that will need to be considered is that the artificial grass pitch and pavilion on the site was substantially funded through a grant (around £500,000) made by the Football Foundation to the school. If the site is to be developed without an acceptable replacement solution, the school would be at risk of Football Foundation seeking reimbursement of the grant awards which may affect deliverability of any development on the site.

The site allocation policy does not make reference to the playing fields and there are no development requirements for retaining or replacing the playing fields in accordance with Government policy or the Council's evidence base. As there is no supporting information to explain the Council's position on the allocation of the playing field area of the site or any specific policy requirements set out in the allocation relating to playing field mitigation, it has been interpreted that it is proposed that the site will be allocated for development without any provision being made to retain or replace the playing fields. This would not be justified by the Council's evidence base on playing pitch provision or by policy BE23 of local plan which contains a presumption against development which would result in the loss of open space or sports facilities unless it can be demonstrated that alternative facilities will be provided.

The allocation in its current from would not accord with Government policy in the NPPF especially paragraph 97 which specifically applies to proposals for developing playing fields. None of the three criteria in the policy would be applicable for the following reasons:

* It has not been demonstrated that the site is surplus to requirements as set out above;
* No replacement playing field provision is specifically proposed as part of the site allocation;
* The allocation is for residential development and therefore would not represent alternative sport and recreation provision.

The allocation would also be contrary to Sport England's playing fields policy www.sportengland.org/playingfieldspolicy which is used by Sport England for assessing planning applications affecting playing fields where Sport England is a statutory consultee. This policy mirrors paragraph 97 of the NPPF and is given weight in the development management process due to Sport England's statutory consultee role.

Object

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

Representation ID: 22424

Received: 19/03/2019

Respondent: Essex Wildlife Trust

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

g. provision for new multi-functional green infrastructure including public
open space;

The above statement should be amended to include a commitment to deliver a measurable net gain in biodiversity.

i. protect and where appropriate enhance the Local Wildlife Site (Arnold's
Wood).

The caveat "where appropriate" in the above statement should be deleted. It is unnecessary and potentially creates ambiguity which could provide a loophole for developers to do nothing. There should be a clear policy commitment to ensure no net loss in habitat quality of the local wildlife site and preferably a measurable net gain.

Change suggested by respondent:

g. provision for new multi-functional green infrastructure including public
open space "to deliver a measurable net gain in biodiversity";

i. protect and enhance the Local Wildlife Site (Arnold's
Wood) to deliver a measurable net gain in habitat quality and biodiversity.

Full text:

g. provision for new multi-functional green infrastructure including public
open space;

The above statement should be amended to include a commitment to deliver a measurable net gain in biodiversity.

i. protect and where appropriate enhance the Local Wildlife Site (Arnold's
Wood).

The caveat "where appropriate" in the above statement should be deleted. It is unnecessary and potentially creates ambiguity which could provide a loophole for developers to do nothing. There should be a clear policy commitment to ensure no net loss in habitat quality of the local wildlife site and preferably a measurable net gain.

Object

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

Representation ID: 22446

Received: 18/03/2019

Respondent: Essex County Council

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

3. Effective.

Criterion B. d. of Policy R03 seeks a potential diversion of Alexander Lane to create a quiet lane for pedestrians and cyclists. This would appear to be contradictory to criterion B. c. which proposes vehicular from Chelmsford Road and Alexander Lane. A development of this scale requires more than one access, and whilst Chelmsford Road would be the main access, Alexander road would need to provide vehicular access.

Clarification is sought on how this conflict can be resolved, and that the site is provide with the required and appropriate accesses.

Change suggested by respondent:

Clarity is sought on how to resolve any conflict between criteria B. c and B. d. in order to ensure the site can provide the required and appropriate accesses.

Full text:

3. Effective.

Criterion B. d. of Policy R03 seeks a potential diversion of Alexander Lane to create a quiet lane for pedestrians and cyclists. This would appear to be contradictory to criterion B. c. which proposes vehicular from Chelmsford Road and Alexander Lane. A development of this scale requires more than one access, and whilst Chelmsford Road would be the main access, Alexander road would need to provide vehicular access.

Clarification is sought on how this conflict can be resolved, and that the site is provide with the required and appropriate accesses.

Object

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

Representation ID: 22447

Received: 18/03/2019

Respondent: Essex County Council

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

3. Effective.
4. Consistent with National Policy.

Criterion B. f. of Policy R03 should include reference to passenger transport (see comments to Policy R02 - Land at West Horndon Industrial Estate).

Change suggested by respondent:

Amend Policy R03 B. f. as follows -

provide well-connected internal road layouts which allow for good accessibility including for passenger transport;

Full text:

3. Effective.
4. Consistent with National Policy.

Criterion B. f. of Policy R03 should include reference to passenger transport (see comments to Policy R02 - Land at West Horndon Industrial Estate).

Object

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

Representation ID: 22954

Received: 05/03/2019

Respondent: D Westfall

Legally compliant? No

Sound? No

Duty to co-operate? No

Representation Summary:

Far too many houses with no apparent provision for extra supporting services i.e. school places, Doctors/Dentists surgeries, local shops to serve the new estate etc.

Change suggested by respondent:

Fewer houses to be built, the total is far too many in too short a period of time.
OR provide the required supporting service first, i.e. extra local hospitals, more local doctors/dentists, much better rail links, much better bus links etc, and then build your new town.

Full text:

Far too many houses with no apparent provision for extra supporting services i.e. school places, Doctors/Dentists surgeries, local shops to serve the new estate etc.

Little or no extra local transport infrastructure with regards to main road or rail links. The existing nearby road and rail links are near bursting point already, esp at rush hour(s).

The plan seems to not take into account the quality of life for the people already living in the area, and just crams more people in.

Object

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

Representation ID: 22955

Received: 05/03/2019

Respondent: D Westfall

Legally compliant? No

Sound? No

Duty to co-operate? No

Representation Summary:

Little or no extra local transport infrastructure with regards to main road or rail links. The existing nearby road and rail links are near bursting point already, esp at rush hour(s).

Change suggested by respondent:

Fewer houses to be built, the total is far too many in too short a period of time.
OR provide the required supporting service first, i.e. extra local hospitals, more local doctors/dentists, much better rail links, much better bus links etc, and then build your new town.

Full text:

Far too many houses with no apparent provision for extra supporting services i.e. school places, Doctors/Dentists surgeries, local shops to serve the new estate etc.

Little or no extra local transport infrastructure with regards to main road or rail links. The existing nearby road and rail links are near bursting point already, esp at rush hour(s).

The plan seems to not take into account the quality of life for the people already living in the area, and just crams more people in.

Support

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

Representation ID: 23253

Received: 21/03/2019

Respondent: Mid and South Essex STP

Representation Summary:

Anticipated mitigation as a result of development on sites R03 and R20 should include contribution towards increasing capacity by means of extension, reconfiguration, possible relocation of an existing service/s or/and recruitment costs. Collaboration agreement, secure Wi-Fi and clinical system installation and maintenance will be required as part of mitigation within Care Homes.

Full text:

1.0 Introduction
1.0.1 Thank you for consulting the Basildon & Brentwood Clinical Commissioning Group (CCG) and the Mid and South Essex Sustainability and Transformation Partnership (STP) on the above emerging Local Development Plan (LP) Document.
1.1 In reviewing the context, content and recommendations of the LP Document and its current phase of progression, the following comments are with regard to the Healthcare provision on behalf of the STP
2.0 Existing Healthcare Position in the Emerging Plan Area
2.1 The LP Document covers the administrative area of Brentwood.
2.2 Currently, within the administrative area, healthcare provision incorporates a total of 9 GP Practices, 13 pharmacists, 9 dental surgeries, 10 Opticians, 2 community clinics and 2 community hospitals.
2.3 These are the healthcare services available that this Local Plan must take into account in formulating future strategies.

Attachments:

Object

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

Representation ID: 23765

Received: 19/03/2019

Respondent: Strutt & Parker LLP

Agent: Strutt & Parker LLP

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

The proposed provision of employment uses on this site has not been justified and is not effective. The provision of 2ha on this site is not required to meet the Borough's identified employment need and conflicts with the deliverability of new homes on the site to meet the Council's housing need.

Change suggested by respondent:

The provision of 2ha of land for employment purposes should be removed from the policy. In order to make Policy R03 effective, it is proposed that the wording in part (e) of the Policy is removed in its entirety, and for part A of Policy R03 to read: a) Amount and type of development; b) Provision for at least 825 new homes of mixed size and type, including affordable housing; c) Provision of land (circa 2.1 hectares) for a co-located primary school and early years and childcare nursery (Use Class D1); d) Provision for a residential care home (around 60 bed scheme as part of the overall allocation); and e) Provision for 5% self-build and custom build across the entire allocation area. The Policy wording should also be changed to state that "at least..." rather than "around 825 homes".

Full text:

These representations are submitted by Strutt & Parker on behalf of Countryside Properties (UK) Ltd in relation to the Brentwood Borough Council Proposed Submission Local Plan (Regulation 19) (PSLP), and in particular with regards to our clients land north of the A1023 (Chelmsford Road), Shenfield, which has been allocated as part of a wider allocation area under Policy R03 of the PSLP. A plan showing the site is provided as Appendix A to this representation. Countryside was founded in Essex 60 years ago by Alan Cherry and has since established a reputation for delivering high quality developments. With the ethos 'creating places people love', Countryside's achievements are exemplified through having won more Housing Design Awards than any other house builder. Countryside is a major development and place-maker, having secured planning permission and building out developments in varying scales: from smaller 30 dwelling schemes on the edge of village's through to large urban extensions of 3,500 new homes plus associated community facilities. Countryside has a proven track record of delivery. The company is headquartered in Brentwood and has a proud legacy of local sites such as Clements Park and the Square on Hart Street. The representations set out Countryside Properties position in relation to the allocation of the site as part of a wider strategic allocation 'R03' Land north of Shenfield and is an important contribution towards BBC's land supply for Brentwood's Draft Local Plan. The representations provide comments on the relevant policies relating to those interests in the Draft Plan. As the Council will be aware, representations have previously been made on behalf of the original landowner of the site, on the Preferred Options Consultation in October 2013 and the Strategic Growth Options Consultation February 2015, and the Regulation 18 Local Plan in March 2018. As a result of these representations and the discussions that have been held with officers at Brentwood Borough Council alongside the Local Plan process, the site has been allocated as part of a wider allocation proposed for strategic mixed-use development on land north and south of Chelmsford Road in Shenfield, between the A12 to the north west and the railway line to the south west. Previous representation have included supporting information relating to landscape visual and Green Belt impacts have demonstrated the low value of the site in this respect, which have respectively support its proposed allocation. This representation therefore builds on this and should be read in conjunction with this information provided previously. Countryside Properties overall position is one of firm support for the PSLP and this is expressed where relevant in these representations, albeit with some overarching concerns, notably in relation to the elements of the Housing, Employment and Development Management Policies and the housing trajectory relating to the delivery of Policy R03 during the plan period. Where concerns are raised, specific changes to the relevant policies are sought and these are indicated in the following representations in order to assist the Council to make the Plan more robust and improving its soundness in terms of being positively prepared, effective, justified and consistent with national policy. The site extends to a total area of 4.4ha, albeit the Council have previously defined the net developable area as 3.44ha. The site is located to the north of Chelmsford Road (A1023) and immediately south of the A12, directly south west of the A12/A1023/B1102 gyratory and westbound A12 slip road. The linear residential development of Chelmsford Road lies to the south of the site. The PSLP has recognised the sustainability of the site and enclosed character, as has been evidence through previous representations of the site, and have therefore proposed it for removal from the Green Belt and for its allocation to provide housing. We support this allocation but do however have some concerns over other policies in the PSLP that may have implications for the efficient and timely delivery of this site. Housing Needs: Paragraph 4.13 of the PSLP states that the Borough's housing requirement is 350 dwellings per annum. Paragraph 4.12 confirms that this figure is calculated using the Standard Method (as per the NPPF and respective Planning Practice Guidance(PPG)). We note that the PPG now confirms that the 2014-based subnational household projection should be used to calculate housing requirements using the Standard Method (Paragraph: 004 Reference ID: 2a-004-20190220). On this basis, the relevant subnational population projections indicate an average annual increase of 293.2 households in the Borough between 2019 and 2029. The latest (2017) ratio of median house price to median gross annual workplace-based earnings for the Borough published by the ONS is 11.23. Once the Standard Method is applied using these figures this results in a requirement of 452 dwellings per annum. The NPPF requires Local Plans to meet this need as a minimum, whilst also allowing sufficient flexibility to be able to respond to rapid change. At paragraph 4.16 the PSLP considers it appropriate to apply a 20% uplift to the identified housing target of 350 dwellings per annum, resulting in a proposed target of 456 dwellings per annum. The rationale for this buffer is unclear with separate references to the buffer advising that it allows for an additional housing land supply to maintained, but also that it serves to safeguard against any potential uplift to the standard methodology for calculating housing need, pending the outcome of the Government's 'Technical consultation on updates to national planning policy and guidance'. Despite the outcome of the technical consultation now having been confirmed, the proposed annual housing target of the PSLP only fractionally exceeds the minimum housing requirement derived from the Standard Method, and therefore does not provide any flexibility or Green Belt protection. Moreover, the figure does not allow provision for unmet need from neighbouring authorities in addition to the minimum requirement. At 4.18 the PSLP confirms the Council have not been able to identify a five-year housing land supply to deliver the annualised requirement. Further to this, at 4.19 the PSLP confirms that there is a high proportion of designated Green Belt within the Borough, making it extremely difficult to achieve a five-year supply due to the fact that sites on the edge of settlements, currently within the Green Belt are not available for development purposes until the adoption of the Plan. The Borough has a limited amount of previously developed land within its authority to provide for short term delivery, as such Green Belt release is required in order to meet the Authorities housing need and deliver within the short, medium and long term, as stated at paragraph 2.54 of the PSLP. The approach to amend the Green Belt boundaries is therefore supported. Despite the outcome of the technical consultation now having been confirmed, the proposed annual housing target of the PSLP only fractionally exceeds the minimum housing requirement derived from the Standard Method, and therefore does not provide any flexibility, Green Belt protection or unmet need from neighbouring authorities in addition to the minimum requirement. In respect of the above, whilst the current PSLP and associated housing allocations seek to go some way in delivering housing that will support the recognised needs of the Borough over the next 15 years, there is clearly a need to increase this provision. Whilst this could be helped through the identification of additional sites, ensuring the delivery and efficient use of the sites that are allocated for housing will also provide a degree of buffer. Further commentary and recommendations in this regard are provided later within this representation. Five-year Housing Land Supply and Housing Trajectory: The Council is required to demonstrate a five-year housing land supply at any point in the plan period (Paragraph: 038 Reference ID: 3-038-20180913). The NPPF (Paragraph 73) confirms that a 20% buffer should be applied to the initial calculation for a five-year housing land supply requirement, in the event that the results of the Housing Delivery Test show that there has been significant under delivery of housing over the previous three years, to improve the prospect of achieving the planned supply. From November 2018 significant under delivery indicates that delivery was below 85% of the requirement for the Borough. The PPG (Paragraph: 037 Reference ID: 3-037-20180913) also confirms that the requirement for a 20% buffer also applies where a Local Planning Authority are seeking to confirm their five-year housing land supply through a recently adopted Local Plan. The results of the 2018 Housing Delivery Test confirmed that Brentwood have delivered just 50% of the housing requirement over the last three years and this is therefore well below the threshold for the 20% buffer requirement. The Borough's most recent reported five-year housing land supply (Five Year Housing Land Supply Statement as at 31 March 2018 (November 2018) ('HLSS') is 4.1 years. This is predicated on a requirement which, when considered in relation to the latest guidance, understates need; and a supply which, again when considered in relation to latest guidance, overstates supply. As such, the actual housing land supply is noticeably less. Looking at this in detail, the HLSS considers an annual need of 343 dwellings, resulting in a total requirement once the 20% has been applied of 2,058 dwellings. However, applying the latest guidance and the Standard Method, the Borough's housing requirement is 452 dwellings per annum. Applying the 20% buffer, this results in a five-year requirement of 2,712 dwellings. In terms of supply, the HLSS includes sites without detailed planning permission and without evidence such sites will be delivered within five years. As per the Glossary contained within Annex 2 of the NPPF, such sites cannot be considerable deliverable for the purposes of the five-year housing land supply. Table 1 of the HLSS suggests that at least 1,042 dwellings in the reported supply did not have planning permission. Once these are removed from the supply calculation, the five-year supply comprises 653 dwellings. It is unclear if and how many of the dwellings categorised as having extant planning permission are on major sites which only benefit from outline permission. Such sites would also have to be discounted. As such, the figure of 653 dwellings may overstate housing supply. A five-year supply of 653 dwellings compared to a requirement of 2,712 represents a 1.2-year housing land supply. This acute housing land supply shortage demonstrates the importance of allocating sites through the Local Plan which can delivery early in the plan period, and support the existing supply of housing. It also emphasises the need to avoid over-reliance on large strategic sites which inevitably take longer to deliver. The housing trajectory provided as Appendix 1 to the PSLP projects that it will enable completion of 2,305 dwellings between 2019/20 and 2023/24. Having regard to the Standard Method and the need to apply a 20% buffer to the housing requirement, the total five-year requirement for the Borough is 2,712 dwellings. Therefore, even before critical review of the supply, the PSLP will not provide a five-year supply of housing. Policy R03 - Land North of Shenfield: Policy R03 deals with land to the north of Shenfield, known as Officer's Meadow and surrounding land. The entire allocation area comprises an area of 58.2ha and it is intended that the area will provide around 825 new homes; land for a co-located primary school, early years and childcare nursery; residential care home; 5% self-build and custom build; and 2ha of land for employment purposes across a net developable area of 28.2ha. We are of the understanding that the majority of these primary facilities will be provided within the main portion of the allocated area, to the south/ south west of Chelmsford Road, which immediately adjoins the existing settlement boundary and will therefore be directly accessible and central to the strategic development as a whole. Countryside Properties land is also known as site 158, as assessed by the Council within Brentwood Borough Council's Housing and Economic Land Availability Assessment (2018). The site measures 4.4ha (gross area) and was considered by the Council to comprise a net area of 3.44ha and capable of delivering 100 dwellings. The site forms one of a number of sites that together form the Strategic Allocation under Policy R03, Land north of Shenfield. Employment Land Provision: Policy R03 refers to the provision of 2ha of employment land across the site allocation as a whole. However, it is noted that Figure 7.6 of the PSLP identifies a new employment land allocation of 2ha at land north of A1023 - the site the subject of this representation, and a more specific reference than that contained within the PSLP policy wording. We note the combined requirement for employment land set out in Figure 7.5 of the PSLP, which confirms that the maximum level of employment land expected to be required over the plan period is 45.96ha. This is a maximum, with the lower expectation falling to 33.76ha, dependent on the forecasting scenario use. Respectively, Figure 7.6 recognises a predicted total of 47.39ha of employment land to be delivered through the new Local Plan and this provision therefore currently exceeds even the highest level of forecasted need. We are aware that previous representations and the submission to the Regulation 18 Consultation in particular did consider the potential for the delivery of up to 2ha of employment uses on the site. Since this time however, Countryside Properties have now taken on the promotion of the site. This has been supported by an additional level of due diligence which, alongside further discussions with Brentwood Borough Council officers, have identified a need to discount an employment-led development on this site. Discussions with Brentwood Borough Council have confirmed that the site presents an opportunity to provide a key gateway into Shenfield and onto Brentwood in this location, our client is confident of the ability to deliver this either through exemplary residential and landscape-led design at the entrance to the site, or through a smaller provision of employment land which is respective of the current market and likely demand in this location, and not necessarily accommodating 2ha of land. Considering the employment uses referred to in Policy PC02, it has been agreed during discussions that an entirely B1 office frontage for the site would not be suited to this role, given that such a use would be unlikely to generate a visually prolific building or a flagship/feature. It would also generally be expected for offices to be located in a more urban and/or town centre location as opposed to this edge of settlement siting, and therefore doubt exists as to the likely interest in B1 premises in this location. B2 industrial or B8 storage uses would not be consistent with the desire for this location to act as a gateway to the area also, and also the implications that such a use could have on the A12 gyratory through the associated movements of HGVs and other vehicles. We are aware that there has been interest in the use of the site for other employment generating and commercial uses which would not fall under B-class uses and may be able to play a better role in the formation of a key gateway in this location. It is recognized however that the spatial requirements of such uses are again unlikely to meet a full 2ha of land. The proposed provision of employment uses on this site has not been justified and is not effective. The provision of 2ha on this site is not required to meet the Borough's identified employment need and conflicts with the deliverability of new homes on the site to meet the Council's housing need. As such, the provision of 2ha of land for employment purposes should be removed from the policy. In the interests of ensuring effective delivery, the Council should also consider the benefits of extending the provision of existing or larger proposed employment sites to account for flexibility that may be required on smaller allocations in response to market fluctuations and the viability of mixed use schemes. Countryside Properties are supportive of the land north of Chelmsford Road, Shenfield (ref.158) being identified as an opportunity to deliver a key gateway to Brentwood from the southbound A12. However, Countryside Properties consider the objective of a key gateway needs to be achieved through careful design in consultation with key stakeholders. In order to make Policy R03 effective, it is proposed that the wording in part (e) of the Policy is removed in its entirety, and for part A of Policy R03 to read: a) Amount and type of development; b) Provision for at least 825 new homes of mixed size and type, including affordable housing; c) Provision of land (circa 2.1 hectares) for a co-located primary school and early years and childcare nursery (Use Class D1); d) Provision for a residential care home (around 60 bed scheme as part of the overall allocation); e) Provision for 5% self-build and custom build across the entire allocation area. Whilst the site may have the potential to provide employment generating uses, a large scale provision of B-use class uses as required under Policies PC02 and PC03 is unlikely to be suitable for the site and the respective restrictive nature of this current wording. Countryside would however support the reintroduction of the wording presented to members which included: e) consideration for provision of appropriate new employment development on land north of Chelmsford Road. Figure 7.6 of the PSLP should be amended to reflect the proposed changes detailed above. The table included as this figure should therefore remove reference to Part of R03 - Land north of A1023 as a new employment allocation for 2ha. Unit Numbers: The wording of allocation policies such as Policy R03 should take the requirement for housing delivery flexibility into account, and therefore be worded to provide "at least 825 new homes", as opposed to "around 825 new homes". We consider that this would provide greater certainty on the number of homes to be delivered as part of each allocation for Brentwood Borough Council, and also allows for the delivery of additional units where appropriate opportunities may arise. For land north of A1023, a significant amount of feasibility work has been undertaken to establish any site constraints, and as a result of this, Countryside are confident in the ability for the site to provide at least 150 homes. We have concerns that the respective policy's current format may be interpreted to confirm the optimum use of the site, rather than a lower limit. In fact, the 100-unit figure has been produced by Brentwood Borough Council with far less rationale and technical justification than has been undertaken by Countryside Properties and may lessen the ability of this site and other policies with similar wording to support Brentwood's need for a buffer and flexibility in their housing land supply. Policy SP03 Health Impact Assessments: The Policy requires planning applications for developments of 50 or more to be dwellings, non-residential development of 1,000sqm or more or schemes for C2 class developments to be supported by HIAs. The HBF response to this policy is unsupportive and they consider the policy to be unsound as it is not consistent with national policy and is ineffective. We are in agreement with the HBF's response, dated 17th March 2019, in relation to the requirement for HIAs to be provided for 50 or more dwellings and consider the requirement to be unnecessary and an additional burden on applicants. Referring to the PPG we note that HIAs may be useful tools, however the PPG also expresses the importance of the local plan needing to consider the wider health issues in an area and ensuring the policies respond to these concerns. The guidance is provided below for completeness. Paragraph: 002 Reference ID: 53-002-20140306 confirms that provision of the required health infrastructure should be supported and taken into account at local and neighbourhood plan making, and when determining planning applications. Referring to National policy, paragraph 20 states that Strategic Policies should set out an overall strategy for the pattern, scale and quality of development, this includes infrastructure and community facilities. In order for the local plan to be consistent with national policy, the Local Plan should already consider the impact of development on the health and wellbeing of the communities and any identified infrastructure should be addressed in policy. Therefore, whilst Countryside support the important consideration of health and wellbeing of communities where development is in line with the policies contained within the development plan a HIA should not be necessary. The requirement for a HIA should only be triggered where there is a departure from the plan, enabling the Council to assess any impacts on the health and wellbeing of the community as a result of said proposals. Policy SP05 Construction Management: The Policy expects all major development schemes/developers to sign up to the Considerate Constructors Scheme, or equivalent. The scheme is a non-profit making, independent organisation which monitors construction sites signed up to the scheme, with the aim of managing and mitigating impacts arising from construction. This requirement is considered unjustified and inconsistent with national policy. Whilst we recognise the importance of managing the potential impacts on construction sites, we consider this policy to be unsound because it is unjustified and not consistent with national policy. We would suggest that consideration for the scheme is best dealt with through planning applications and development management without it being written into formal planning policy. We are not aware of any other adopted or emerging Local Plan which requires applicants and developers of major sites to enter into a specified construction management scheme and therefore question the reasonableness of this policy. The matter of construction management should be assessed on a case by case basis and should not be a matter for a strategic policy to prescribe. How a construction scheme is managed and mitigated should be an item for consideration by the decision taker and assessed on a case by case basis. The imposition of Policy SP05 requires all major developments to be signed up to the Considerate Constructors Scheme regardless of the site or proposal details. It is recommended that this policy is removed. Policy BE02 Sustainable Construction and Resource Efficiency: We consider the policy to be unsound as it is inconsistent with national policy. Part (f) of Policy BE02 requires the inclusion of renewable and decentralised energy as part of a new development, this is not consistent with national policy. Whilst Countryside recognise the importance of sustainable construction, a policy approach to such requirements does not allow for the appropriate flexibility in this regard, as recognised in the NPPF. Paragraph 153 of the NPPF states that local plans can expect development to meet such provisions, however the NPPF also states that they are only required to comply with such policies where it is either feasible or viable. To ensure consistency with national policy part (f) of Policy BE02 should be amended to reflect this position. Policy BE03 Carbon Reduction, Renewable Energy and Water Efficiency: It is Government policy to seek to deliver improvements to emissions from buildings through the building regulations regime. As such we do not consider it necessary to include the table at part (a) of this policy. Should a national zero carbon policy be introduced it will be achieved and applied through building regulations. We therefore echo those comments of the HBF's consultation response, dated 17th March 2019, and suggest that if the building regulations are updated then the Council should revisit the policy through a local plan review at that stage, but that such matters are dealt with through building regulations in the meantime to prevent unnecessary duplicate consideration of such matters through both planning and construction stages. Policy BE04 Establishing Low Carbon and Renewable Energy Infrastructure Network: It is acknowledged that the Government support the transition to a low carbon future in a changing climate, including support towards renewable and low carbon energy and associated infrastructure. Countryside support these intentions. Part (b) of Policy BE04 expects sites of over 500 dwellings, including where there are clusters of neighbouring sites that total over 500 units, shall incorporate decentralized energy infrastructure in line with a hierarchy however. We raise concerns in relation to the deliverability of part (b) of the policy in relation to sites within a cluster of 500 or more dwellings given that neighbouring sites will not necessary come forward by multiple landowners and developers at similar times. The coordinating and implementation of a heat network to serve smaller scale sites as separate applications but adjacent to other similar sized sites in the locality, is unreasonable and unjustified and could result in a delay in delivery of new homes, resulting in an ineffective local plan. It is recommended that the requirement for new development located where 'clusters' of neighbouring sites totals over 500 units should be removed from the policy in order to make the policy effective. Policy BE10 Connecting New Developments to Digital Infrastructure: It is Government policy to support the expansion of electronic communications networks. However, we would draw the Council's attention to the Written Ministerial Statement, 25th March 2015, which announced that local planning authorities preparing Local Plans, "should not set any additional standards or requirements relating to the construction, internal layout or performance of new dwellings." The Local Planning Authority are only allowed to adopt the three optional technical standards, in relation to construction, internal layout and performance, subject to evidenced need and viability. As such, the Council should not seek higher standards than Building Regulations, as already referred to in our response to Policy BE03. Therefore, Policy BE10 is considered unsound because it is unjustified and contrary to national policy. We are also unaware of National Policy requiring benches and bins to be connected to mobile digital infrastructure. As such the policy is unjustified and contrary to national policy. Countryside are committed to ensuring that all developments go as far as is practical to meet national intentions to ensure the quality, practicality and future-proofing of new housing developments. We have concerns however that by introducing a wealth of additional planning policies in these areas, there will be unnecessary duplication to building regulations, and potentially delays to planning applications which will in turn impact on the timely delivery of new homes. Summary: Countryside Properties generally support the plan, however alterations to the PSLP can enforce the soundness of the Plan, ensuring it has been positively prepared, justified and effective and consistent with national policy. The proposed allocation of land north of A1023 as part of the wider R03 strategic allocation within the PSLP is supported. Countryside do however raise concerns about the soundness of the Plan in relation to the approach taken to development management policies and timing of delivery of the site proposed for allocation. Policies mentioned above, appear to be based on an idealistic approach which does not account for different site constraints and flexibility in development management which would in turn help to protect the Council's supply of housing and robustness of the PSLP. The proposed amendments to the employment provision within Policy R03 will make the approach taken justified and effective. The proposed alterations will help to ensure that this policy is positively prepared and a justified approach for the site has taken into account the recognised constraints and the site is delivered in accordance with the expected delivery timescales, and that Brentwood can therefore meet housing needs as planned. The proposed amendments will also allow for flexibility over unit numbers in the event that the site can support the recognised need for a greater buffer and flexibility towards housing delivery over the Plan period. (Figure included in attached document).

Support

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

Representation ID: 23947

Received: 14/05/2019

Respondent: Shenfield High School

Agent: Shenfield High School

Representation Summary:

Support. Have been working with Croudace and Hutton FC to provide solutions to the need for an increase in education provision and to provide a football ground, and to identify locations for shared spaces (green space and/or community opportunities).

Full text:

I am writing to offer our support for the residential led development proposals at land North of Shenfield (R03). The proposals for approximately 825 new homes over a number of land parcels and associated community facilities and infrastructure has come to our attention through the close working relationship we have with Croudace Homes. We have been engaging with Croudace for a number of years discussing prospects for the area and we are keen to assist and play our part in meeting the needs of the community in any way we can. As a key stakeholder in the area, Shenfield High School felt it was pertinent at this stage of the Local Plan process to submit a representation to the Regulation 19 Plan.
We are already in partnership with Hutton Football Club who are also looking to develop sports facilities int eh area. HFC are proposing a football ground which could provide excellent opportunities and extend facility use for Shenfield High School students and the community as a whole.
We have been working with Croudace for some time and discussing the education needs for the area especially in light of the potential development. We have recently become aware that the Local Plan site allocation (R03) includes land that is not promoted by Croudace. This extends the allocation to around 825 dwellings, rather than circa 510 dwellings, which was originally proposed. AS such, this will have a significant impact on the education provision and requirement in the area.
The latest published ten-year plan from Essex Schools Organisation team shows that in the next few years, there is already a small deficit in primary school places forecast, and this is not taking into account any of the proposed developments.
Two years ago there was a large deficit in Primary place numbers forecast, and we were working with Essex schools Organisation team to explore possible solution, At the time, we commissioned a full feasibility study into the possibility of extending our buildings, facilities and age range to offer all through education from Primary through to sixth form, and possibly even early years education. The plan was strongly supported and we almost got to the point of full agreement before a revision in Essex forecast data showed the deficit position to have reduced. On that basis the project did not go ahead, but it was highlighted as a good option for the future where demand was still predicted.
The nw development proposals would obviously have a significant impact on the requirement for Primay places in the area and we feel our previously explored solution is still a very good one. Croudace have included tour feasibility study in their proposals as we agreed that working together to deliver a great education solution as part of the overall development plan was the best way forward.
The proposed development will also have a significant impact on the demand for Secondary Places which is something else we have been considering with Croudace as part of our discussions. Shenfield High School is an extremely popular secondary school and sixth form and we are very open to working with Croudace and other developers to address the education needs at both Primary and Secondary levels. We have some excellent potential solutions which are very flexible and cab be adapted to meet emerging needs as the project progresses.
In addition to demand for school places we have been discussing with Croudace the possibility of identifying shared spaces that could be used by both the school and local community. This is of particularly relevant to open green spaces but we have also discussed some possible community opportunities. The school has strong links with several organisations that could benefit the community. As an example, we are currently working closely with a local community radio station and a charity who provide respite day care for dementia sufferers.
We have an excellent working relationship with Croudace and have discussed various options for the capacity and condition of the school other education provisions in the area and for community facilities beyond the basic school requirements.

Attachments:

Support

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

Representation ID: 24014

Received: 19/03/2019

Respondent: Croudace Strategic Ltd

Agent: Barton Willmore LLP

Representation Summary:

Largely supportive, however there are some aspects we do not consider to be "sound". In particular:
*Criterion b under Amount and Type of Development: Earlier/recent work undertaken by the High School (and others) considered the anticipated need for a new 1FE Primary School. The proposed policy wording should clarify that it is now proposing a 2FE Primary School.
*Criterion d, under Amount and Type of Development: the evidence base and local need should be fully assessed before any commitment is made to the provision of Custom and Self Build in this location.Suggest policy is amended to "up to" 5%

Change suggested by respondent:

Amend criteria b and d under Amount and Type of Development as followed:
b. Provision of land (circa 2.1 hectares) for a co-located 2FE primary school and early years and childcare nursery (Use Class D1). To be located adjacent to Alexander Lane.
d. Provision for up to 5% self-build and custom build across the entire allocation area.

Full text:

1.0 INTRODUCTION
1.1 These Representations on the Brentwood Borough Council Reg 19 draft Local Plan have been prepared on behalf of Croudace Homes who are promoting their site (Officers Meadows - site number 034), which falls within the broader allocation of "Land North of Shenfield". The allocation encompasses several land ownerships, including Sites 158, 235, 087, 263 and 276, as well as the "Officer's Meadow" site (034), all of which make up the allocation Policy R03. It should be noted that Croudace Homes has controlling land interest in Site 034 only, therefore whilst development proposals have taken the other sites into account, this document is in respect of the "Officer's Meadow" site.
1.2 "Land North of Shenfield" was previously promoted through the Reg 18 Local Plan process (see Site Allocations Map Jan 2016 which supported the Draft Local Plan) historically as one of three separate strategic sites, now shown in the Reg 19 draft Local Plan site allocation as one site, "Officer's Meadow and surrounding land" (ref. Policy R03) allocated for residential development. The "Officer's Meadow" site is the focus of these Representations to the Reg 19 draft Local Plan and is hereby referred to as "the Site".
1.3 These representations are submitted to the Local Plan consultation document and set out our support for the Brentwood Borough Council (BBC) Local Plan in terms of the proposed spatial strategy and the identification of the Site as an allocation for growth.
1.4 These representations are focused on the Site allocation and demonstrate that the allocation is "sound" and deliverable having regard to National policy and a number of technical matters for the Site. It also reviews the Local Plan in terms of soundness of the Duty to Co-operate, the proposed spatial strategy (inc. Sustainability Appraisal) and other policies in the Plan including for Development Management purposes.
1.5 These representations are supported by technical reports included as appendices, which, on behalf of Croudace Homes, provide the background evidence to support the allocation and demonstrates it is "suitable", "available", "achievable" and therefore "deliverable". This will be referred to in these representations and it has regard to BBC's Evidence Base. The technical reports prepared by the consultant team, detail matters concerning:
* Transport;
* Landscape/Green Belt;
* Drainage;
* Noise
* Ecology;
* Archaeology; and
* Masterplanning.
* Shenfield High School "All through" education provision proposals.
1.6 The following sections of these representations are set out as follows:
* Section 2.0 - National Policy;
* Section 3.0 - Duty to Co-operate;
* Section 4.0 - Local Plan Strategy;
* Section 5.0 - Policy LP R03 -Land North of Shenfield (Officer's Meadow);
* Section 6.0 - Delivery of Land North of Shenfield (Officer's Meadow);
* Section 7.0 - Soundness of other policies in the Local Plan; and
* Section 8.0 - Conclusion.
2.0 NATIONAL POLICY
2.1 This section provides an overview of the NPPF with particular regard to plan-making. Other policies in the NPPF will also be referred to later in these representations.
i) National Planning Policy Framework
2.2 On 24 July 2018, the revised National Planning Policy Framework (2018 NPPF) was published by National Government, setting out the planning policies for England and how these are expected to be applied in both plan-making and decision-taking. Post 24 January 2019 any plans submitted after this date must refer to the revised NPPF. This document therefore focusses on the revised 2018 NPPF.
2.3 The revised NPPF introduces the Government's standardised methodology for assessing housing needs. For those LPAs which do not submit plans within the NPPF's transitional period, the standard method will apply as a starting point for assessing housing needs.
a) Plan-Making
2.4 The NPPF 2018 (Para 35) sets out the requirement for Local Plans to be examined by an independent Inspector whose role is to assess whether the Plan has been prepared in accordance with legal and procedural requirements, and whether it is "sound". An LPA should submit a Plan for Examination which it considers is "sound" - namely that it is:
* Positively prepared (as a minimum seeking to meet the area's objectively assessed needs);
* Justified;
* Effective; and
* Consistent with national policy.
2.5 These representations will assess the Pre-Submission Local Plan against the tests of soundness, as above. The next section details the Duty to Co-operate in this regard.
3.0 DUTY TO CO-OPERATE
3.1 This section considers the legal compliance and procedural matters associated with the Local Plan with regard to the "Duty to Co-operate".
i) Policy Framework
3.2 The "Duty to Co-operate" as provided for in Section 110 of the Localism Act 2011 came into effect on 15 Nov 2011. The "duty" was introduced under the 2011 Act to address the impact of the loss of the "top-down" effect from the Regional Strategy and to offer a transparent way in which LPAs should relate to one another on cross boundary issues. The "duty" is now shared between LPAs requiring them to collaborate on cross-boundary matters and issues of sub-regional and regional importance, especially housing provision and infrastructure issues.
3.3 The NPPF 2018 (Paras 24-27) is clear in directing LPAs as to the importance of the "Duty to Co-Operate" and the pro-active approach necessary to ensure a collaborative approach to reflect individual local plans.
ii) BBC's 'Duty to Co-Operate' (DtC)
3.4 The NPPF recommends that where a Housing Market Area (HMA) extends across more than one local authority plan makers should assess need for housing for the whole HMA, rather than just the individual authority. The SHMA (Oct 2018) sets out that Brentwood District is a self-contained Housing Market Area (HMA). On this basis, no further joint evidence base documents were commissioned, but strategic work continues with South Essex Councils.
3.5 The Objectively Assessed Need (OAN) for BBC amounts to 380 dwellings per annum (dpa) as the SHMA advises that the Council plans on the previous OAN evidence (despite referring to 350 dwellings per annum (dpa) following the current guidance, for the period 2019-2029). In addition, the Council propose additional land allocations over and above "need" (20% above 380 dpa). This approach is welcomed in the SHMA guidance, as overprovision should provide additional flexibility in the supply and delivery of sites.
3.6 Since the draft Brentwood Borough Council Reg 19 Local Plan has been published, the PPG HENA details the standard method for assessing housing need and now clarifies that the 2014-based household projections published by the Office for National Statistics should be used to set the 'baseline' for the standard method calculation. The standard method number for Brentwood is 452 dpa.
3.7 The OAN is 7,752 dwellings during the Plan period (2016 - 2033) and it is welcomed that the Local Plan is seeking to meet this need in full (and potentially overprovide). This is addressed further in the housing strategy section to follow. The Plan also provides an equitable distribution of new homes across the HMA and this will be addressed under the Sustainability Appraisal.
3.8 It is evident that BBC has engaged with neighbouring authorities regarding cross-boundary matters as well as meeting housing need, as set out in the Duty to Co-operate Brentwood Position Statement (February 2019).
3.9 As part of the DtC the Borough would normally need to consider whether it is a sustainable location for unmet cross boundary need. However, as Brentwood is a Green Belt authority (89% is Green Belt), it is unlikely that Brentwood will be in a position to accept any unmet housing need from the South Essex housing market area. The Essex neighbours (Chelmsford and Epping Forest) both have plans submitted for examination that are not reliant on Brentwood accepting any of their housing growth.
3.10 Ongoing Duty to Cooperate work continues with South Essex as part of a strategic growth study and participation in a Joint Strategic Plan.
3.11 The Association of South Essex Local Authorities (ASELA) memorandum of understanding was recently signed by Basildon Borough Council, Brentwood Borough Council, Castle Point Borough Council, Essex County Council, Rochford District Council, Southend on Sea Brough Council and Thurrock Borough Council (Jan 2018). This highlights the constraints and challenges facing other local authorities in terms of meeting their housing needs, and emphasises the importance upon BBC in terms of meeting its own needs in full. We therefore welcome BBC's aspirations in seeking to meet its own needs and indeed in seeking to provide to some flexibility too.
3.12 Duty to Co-operate discussions have confirmed that immediate neighbouring authorities are aiming to meet OAHN within their boundaries, but some will have difficulties in this regard. However, as Brentwood is a Green Belt authority, it is unlikely that Brentwood will be in a position to accept any unmet housing need from the South Essex housing market area.
3.13 To ensure the Local Plan is justified and effective (NPPF, para 35), it is considered that the above issues should continue to be updated in the evolving DtC Statement (February 2019).
3.14 The Council needs to continue to have regard to neighbouring authority plans and adequately co-operate with neighbouring authorities, rather than awaiting the future joint strategic plan, as well as Essex County Council plans, and strategies of other relevant bodies.
3.15 This working can be further supported by the Duty to Cooperate meetings dealing with the strategic planning issues relating to the South East Essex 2050 Programme. Also, the Association of South Essex Local Authorities (ASELA) Statement of Common Ground which includes a commitment to joint working through the preparation of a Joint Strategic Plan for South Essex.
3.16 It is recommended that BBC continues to embrace opportunities to work with the other members of ASELA, as well as producing statements of common ground with its neighbouring authorities, which is a key element of plan preparation, in order to secure a "sound" Local Plan which meets the requirements of the Duty to Co-operate.
4.0 LOCAL PLAN STRATEGY
4.1 This section examines and provides commentary on the proposed spatial strategy in the Local Plan, insofar that it relates to the housing and employment provision, and the allocation of strategic sites for growth including within the Green Belt.
4.2 First, we set out our representations on the Sustainability Appraisal for the Local Plan.
a) Sustainability Appraisal
4.3 The BBC Sustainability Appraisal (incorporating Strategic Environmental Assessment) provides an assessment as to how the spatial strategy for the Local Plan was arrived (identifying, describing and evaluating the likely significant effects of implementing the plan).
4.4 The strategy has evolved from the early 'Pathway to a Sustainable Brentwood' Issues and Options document (2009), which set out a series of strategic objectives. The overarching priorities set out in the Interim SA (Jan 2018) are:
* Environment and Housing Management;
* Community and Health;
* Economic Development;
* Planning & Licensing; and
* Transformation.
4.5 In order to achieve these priorities the following plan themes have been set out (with associated objectives as set out in the SA):
* Managing Growth;
* Sustainable communities;
* Economic prosperity;
* Environmental protection and enhancement;
* Quality of Life and community infrastructure; and
* Transport and Movement.
4.6 Having regard to these themes and objectives, 10 No. reasonable spatial strategy alternatives were drawn up in the SA. The desire to deliver at least one large-scale, strategic site (likely for a mix of uses, to include both housing and employment) is quite well established, recognising: A) limited opportunities within settlements; B) no potential to export 'unmet needs' (as discussed); and C) the alternative of piecemeal Green Belt development dispersed widely has significant draw-backs (this option was appraised within the 2013 Interim SA Report).
4.7 A number of strategic site options have been examined over recent years, including through consultation and SA work, such that there is now a refined understanding of those sites that are genuine contenders for allocation through the Local Plan - There is specific mention of North of Brentwood and ....' the potential for expansion to impact 'in-combination' with other potential extensions to the urban Brentwood/Shenfield area, most notably the potential 825 homes on land at Officers Meadow (directly to the east)'.
4.8 The SA goes on to note that there is a need to give careful consideration to growth opportunities at Brentwood/Shenfield urban area.......Brownfield opportunities are limited; hence there is a need to examine Green Belt urban extension options. All land around the urban area is given brief consideration, with reference to the site options and the designated constraints that exist. Specifically:
North of Shenfield
A large area of land is bounded by the railway line to the east, and the A1023 to the west; plus there is a parcel of land to the north of the A1023, bounded by the A12. There are relatively few designated constraints, although considerations include a spur of Arnolds Wood Local Wildlife Site (LWS), and proximity to the railway and main roads. This land parcel comprises three HELAA sites, all of which are preferred allocations at the current time (Officer's Meadow; Land east of A1023; and Land north of A1023).
[SA of Brentwood Local Plan, January 2019 - page 113]
4.9 Of the options considered, the SA concluded that "Option 3" Dunton Hills Garden Village only, in addition to the sites that are a 'constant' across the reasonable alternatives, was the preferred option for growth as it performs well in terms of the majority of sustainability objectives. Furthermore, the option of identifying the delivery of 'constant' sites was also preferred with the objective of meeting both short and long-term needs.
4.10 We fully support and consider the approach of the Sustainability Appraisal to be "sound" in terms of alternative strategies assessed for the Local Plan and consider that the most sustainable option has been arrived at.
4.11 The SA reviewed site options that could deliver the proposed spatial strategy. This includes "suitable" sites as derived from the SHLAA against a series of 12No SA criteria including Housing, Landscape, Community and well-being and other sustainability considerations. This included a "red, amber, green" assessment of sites as against the selected 12No criteria. We support this approach and consider it to meet the requirements of the SEA in terms of the assessment of environmental impacts - this includes BBC's assessment of the Site at North of Shenfield for which we also fully support and consider to be "sound".
4.12 The process allowed for two strategic site options to be discounted (considered 'unreasonable') given planning/sustainability considerations and deliverability considerations. The extent of reasonable sites has been restricted to balance the need to meet housing needs as well as ensuring that pressure will not be put on infrastructure nor pose a serious risk to air quality, local amenity, natural and heritage assets and biodiversity.
4.13 Our Client's considerations of the Council's Sustainability Appraisal have been informed by the accompanying "Review of Sustainability Appraisal" (Barton Willmore EIA, March 2019), which is attached to these representations. (See Appendix 01).
4.14 The preferred approach is Option 3, which involves allocating Dunton Hills Garden Village only, in addition to the sites that are a 'constant' across the reasonable alternatives (including Officers Meadows), and thereby putting in place an overall land supply sufficient to provide the required housing target dpa (assuming no delayed delivery).
4.15 We support the overall approach to the Sustainability Appraisal, insofar as:
* It follows a robust process in evaluating alternative options for growth as well as specific site options;
* The approach to individual site options is considered to be sound; and
* It is considered to be "sound" in that it arrives at the most reasonable option for growth - Dunton Hills Garden Village in addition to the sites that are 'constant' across the reasonable alternatives- as encompassing the allocation at Land North of Shenfield (034).
b) Housing Strategy
4.16 On 19 February 2019, MHCLG published the long-awaited outcome of the 'Technical consultation on updates to national planning policy and guidance', which clarifies the methodology for assessing housing need incorporated in the updated Housing and Economic Needs Assessment (HENA) Published on 20 Feb 2019. The standard method for assessing housing need is detailed in the PPG HENA and now clarifies that the 2014-based household projections published by the Office for National Statistics should be used to set the 'baseline' for the standard method calculation. The standard method number for Brentwood is 452 dpa.
4.17 In order to provide flexibility in the supply of housing sites, help boost delivery and to aim towards the standard method figure, the Council has proposed a further 20% supply buffer when allocating development sites in the Local Plan above the established annual housing figure of 380 dwellings per year, as set out in the SHMA. The buffer allows for an additional housing supply in the borough to be maintained throughout the Local Plan period and is supported in national planning guidance. The Reg 19 Draft Local Plan refers to 456 dpa based on the 20% SHMA uplift on 380 dpa.
4.18 The Local Plan sets out (Policy SP02) the OAN for housing in the Borough as being 7,752 dwellings during the Plan period (2016 - 2033); which when projected across the 17-year plan period gives an annualised housing delivery target of 456 new homes per year. The Council has not been able to identify a 5-yr HLS that delivers this current annualised requirement. When calculating HLS for our representations we have based our assumptions on 452 dpa which is the most up to date guidance (February 2019).
4.19 As a result of 89% of the Borough being designated Green Belt, the Council advises it is difficult to achieve a five-year supply, as many allocated sites within the Green Belt will not be available until the adoption of the Plan. On this basis a larger proportion of sites will not be delivered until after 2023, when they begin to benefit from detailed planning consent.
4.20 Therefore, a stepped trajectory is proposed, with an initial housing delivery target of 310 dpa to 2023 has been set, followed by a higher target of 584 dpa thereafter, which totals 7,752 homes overall in accordance with Policy SP02.
4.21 The Local Plan (Chapter 4, Policy SP02: Managing Growth) indicates that the residual requirement will be sought largely through new development being directed towards the site allocations set out in Chapter 8; and highly accessible locations along transit/growth corridors. These are as follows and seek to deliver circa. 4,500 units up to 2033:
Table 4: Strategic Sites [see attachment]
4.22 In terms of the allocation at Land North of Shenfield ("Officers Meadow"), this includes an overall requirement across the whole site allocation at Policy R03 for 825 units to be delivered in the Plan period. This delivery schedule is supported and is addressed further in the next section.
4.23 We support the housing strategy for the Local Plan and welcome that BBC is seeking to meet its housing needs in full. This is particularly important having regard to the likely inability of adjacent authorities (referred to on page 5) to meet their own needs. We therefore consider the housing strategy in the Plan to be "sound" in accordance with the NPPF (Para 35).
c) Employment Strategy
4.24 Policy PC02: Job Growth and Employment Land identifies that provision is made for at least 47.39ha of new employment land (B-use) to address the needs of the Borough up to 2033. To ensure that the Plan is more effective, it is recommended that this is followed by supporting text setting out the extent of need as derived from the Brentwood Economic Futures report (2018) and Strategic Housing Market Assessment (2018).
4.25 This need is proposed to be met through allocations set out at Policy PC03: Employment Land Allocations. This includes provision of appropriate new employment development on North of A1023 (part of the Land North of Shenfield R03 land use allocation). We fully support this aspect of the Plan including the broad strategy underpinning both the housing and employment allocations. The employment strategy for the Local Plan is justified and "sound" in line with the NPPF (para 35).
d) Five-Year Housing Land Supply
4.26 The Local Plan is unclear in terms of being able to demonstrate a 5-yr HLS of housing land for the purposes of the Plan.
4.27 The most recent AMR (Nov 2018) demonstrates that BBC currently has a supply of 4.1 years - against requirement of 411.6dpa (2,058 units over 5-years) which encompasses a 20% buffer as required by the NPPF and Housing Delivery Test. This is as a result of persistent under delivery, as delivery is currently calculated as 50.83% for BBC, below the 85% requirement.
4.28 The AMR 5-yr supply relates to the period 2018/19 - 2023 and concerns, inter-alia, sites with planning permission, existing commitments and strategic sites at Dunton Hills Garden Village, West Hordon Industrial Estate, Ford Headquarters, etc. The Plan's trajectory details the delivery at proposed allocated sites (2016/17 - 2032/33) amounting to 6,088 units.
4.29 The 2018 AMR suggests the delivery of 819 units (Allocations, Reg 19 Local Plan) within the same timeframe (2018-2023). The figure is derived from existing permissions, developments, allocations and commitments, as well as the 20% buffer, is 1,694.7 units, and concludes the supply is 4.1 years (as set out below):
Table 6: Five Year Supply Position (2018-2023) [see attachment]
4.30 The AMR 2018 refers to the PPPG: HELAA, which sets out how a 5-yr HLS is measured where LPAs have a "stepped" rather than annual average requirements; it states:
Five-year land supply is measured across the plan period against the specific stepped requirements for the particular 5-year period. Stepped trajectories will need to ensure that planned housing requirements are met fully within the plan period.
[Paragraph 017, Reference ID: 2a-017-20180913]
4.31 The AMR 2018 sets out (Table 4: Comparison of annualised housing delivery target and projected completions) a housing delivery target of 7,752 homes (456 dpa over the 17-year Plan period), together with annualised projected housing completions. The report states that from a comparison of this data an initial stepped requirement of 310dpa to 2023, followed by a higher stepped up requirement of 584dpa for the remainder of the Plan period, is a logical approach to reach 7,752 homes by 2033.
4.32 As a result of the high proportion of Green Belt in the Borough, it is extremely difficult to achieve the annualised 5-yr HLS requirement. This is because, as set out in the AMR 2018, sites on the edge of settlements currently within the Green Belt are not available for development purposes until the emerging Local Plan is adopted. Therefore, the potential for a stepped trajectory has been proposed, which delivers a greater proportion of the required homes beyond 2023.
4.33 The above demonstrates that BBC is not fully able to demonstrate a 5-yr HLS for Local Plan purposes. This position could be expedited by allowing allocated sites, such as "Officers Meadow" to come forward 1-2 years sooner, within the present 5-year period, to help meet the required 5-yr HLS position.
5.0 LAND NORTH OF SHENFIELD - POLICY R03
5.1 Land North of Shenfield (Policy R03: Strategic Site - Land North of Shenfield) is allocated in the Pre-submission Reg 19 Local Plan and the extent of the allocation is shown below:
Figure 1: Land North of Shenfield- Allocation Area [see attachment]
5.2 This shows the Site area as allocated as a whole; despite Land North of Shenfield having 6 land parcels within it, namely Site parcels 034, 158, 235, 087,263 and 276, as identified at Appendix 1: Housing Trajectory in the Reg 19 Local Plan and previously set out in earlier iterations of the Reg 18 Local Plan suite of documentation.
5.3 We set out below our comments on Policy RO3 and Appendix 1- Housing Trajectory in regard to the proposed delivery rates. This is largely supportive, however there are some aspects we do not consider to be "sound".
i) Amount and Type of Development:
a. Provision for around 825 new homes of mixed size and type, including affordable housing.
5.4 This criterion is supported/considered to be sound and "effective" in accordance with the objectives of the NPPF (para 61) relating to creating mixed and balance communities. The proposals for the Site will therefore be able to be delivered in accordance with this policy objective.
b. Provision of land (circa 2.1 hectares) for a co-located 2FE [additional text] primary school and early years and childcare nursery (Use Class D1). To be located adjacent to Alexander Lane. [additional text]
5.5 We largely support this criterion, albeit consider it should be amended (as above) to provide for greater clarity. Therefore as presently worded, we object to this criterion.
5.6 Forecasted figures contained in 'Commissioning School Places in Essex 2016-2021' indicate that there will be a deficit in pupil places by 2020/21 when accounting for demographic factors and the proposed uplift in residential development.
5.7 Earlier/recent work undertaken by the High School (and others) considered the anticipated need for a new 1FE Primary School. The proposed policy wording should clarify that it is now proposing a 2FE Primary School. We have prepared an accompanying note (Appendix 02) that reflects are discussions in this regard.
5.8 Consideration should be given to the location of the Primary School. Again, the recent work undertaken by the High School has examined this, inc the early years facility and nursery element, and that it should ideally be located on the existing school playing fields, just north of Alexander Lane. This would enable the Shenfield High School to deliver an 'all through' school provision, comprehensively expanding the educational offer available on-site.
5.9 The NPPF (para 94) seeks that LPAs take a proactive, positive and collaborative approach to meeting school place requirement and to development that will widen choice in education. The principles of this element of Policy R03 is therefore "consistent" with the NPPF, but the wording should be clarified further. We would be happy to continue discussions with Shenfield High School, BBC & ECC Officers in respect of seeking to agree the most suitable location for the primary school provision.
5.10 In terms of its own generated education requirements, the allocation would give rise to a need for a 1FE Primary School and financial contributions towards secondary school provision. Through positive discussions with Shenfield High School, we have been working closely towards its objective of becoming a "through-school" (by encompassing Primary provision) and contributing towards secondary provision (at the High School) on a pro-rata basis.
c. Provision for a residential care home (around 60 bed scheme as part of the overall allocation).
5.11 The principle of this criterion is supported/ considered to be sound and a care home could be accommodated on the 'Officer's Meadow' site, however this should be subject to the balanced and reasonable distribution of other infrastructure across the Site allocation as a whole. The NPPF (section 5) on "Delivering a Sufficient Supply of Homes" requires that housing need for different groups in the community should be assessed and reflected in planning policies. The provision of a residential care home in Policy R03 would contribute towards the offer of care for older people in Shenfield and is therefore "consistent" with the NPPF, in accordance with national policy and is deemed sound.
d. Provision for up to [additional text] 5% self-build and custom build across the entire allocation area.
5.12 The principle of this criterion is supported, but not as presently worded. We therefore object to this criterion in its present form.
5.13 Section 1 of the Self-Build and Custom Housebuilding Act 2015 (as amended by the Housing and Planning Act 2016) requires each relevant authority to keep a register of individuals and associations seeking to acquire serviced plots for their own self-build and custom housebuilding. Whilst the provision of self-build and custom build should be considered, the evidence base for a 5% need across the entire allocation should be addressed against the local "needs register" and demand for such provision at the prevailing time.
5.14 In order to align with National policy, the evidence base and local need should be fully assessed before any commitment is made to the provision of this house type in this location. It is therefore considered that this element of Policy R03 is unsound.
5.15 It is recommended that this aspect of the policy is amended to "up to" 5% as shown above, to reflect prevailing "need" at the time.
e. Provision of 2ha of land for employment purposes.
5.16 The provision of 2ha of employment land as part of the wider allocation is agreed in principle. Employment land situated on land north of Chelmsford Road, as per the location identified in the BBC Site Analysis Overview report (Feb 2019), is supported, given its location adjacent the A12. This is the most appropriate location for such provision and is "consistent" with the NPPF (para 20). Therefore, and if situated in this location, this criterion is considered sound.
ii) Development Principles:
a. Comprehensive masterplan and phasing strategy to be prepared and considered as planning applications come forward.
5.17 We support this criterion and it is confirmed that development can come forward and be delivered within the timescale as shown in the housing trajectory. We also support a comprehensive masterplan and phasing strategy to set out effective phasing of the requisite infrastructure, as identified in the Infrastructure Delivery Plan (IDP) is "consistent" with the NPPF and is considered sound.
5.18 The overall needs of development must have regard to potential considerations in terms of viability in order to be fully "justified", something not yet addressed in the IDP, which should be rectified in the next iteration of the IDP.
b. Site is identified as a key gateway location and development should reflect this in terms of design quality particularly on land near to Junction 12, A12.
5.19 We broadly support these provisions and the concept masterplan sets out conceptually the land take for development in this location, including the key gateway employment location and residential, however this land is not within our Client's control and as such will be the subject of a separate planning application and detailed framework masterplan. In principle, and from an overall design perspective, this key gateway location is consistent with Section 12 of the NPPF and is "justified" and therefore considered sound.
c. Vehicular access via Chelmsford Road (A1023) and Alexander Lane.
5.20 It is recognised that the delivery of vehicular access via Chelmsford road and Alexander Lane is a necessity as part of these proposals. Our Client's accompanying Transport Strategy (Vectos, March 2019) provides evidence to support the development of the Officer's Meadow Site in terms of reducing the need to travel and providing opportunities for non-car travel. This is "consistent" with the NPPF, in particular Section 9 on "Promoting Sustainable Transport". The provision of access via both Chelmsford Road (A1023) and Alexander Lane allows for flexibility in terms of phasing and means that development can take place simultaneously in more than one location on the Site. It is therefore considered that this criteria is sound.
d. Potential for diversion of Alexander Lane, creating a quiet lane for pedestrians and cyclists, with the provision for new and improved route through the development site linking to Chelmsford Road.
5.21 The potential diversion of Alexander Lane is welcomed in terms of pedestrian safety and improved access. This is because a quieter Alexander Lane will improve access to local schools, pedestrian and cycle infrastructure and the existing PRoW, encouraging active mobility. This policy is therefore considered "justified" in light of the NPPF (para 102).
e. Enhancing sustainable links with Shenfield station and local services and facilities in the wider area.
5.22 The accompanying (Vectos) Transport Strategy confirms that the travel opportunities afforded by the service at Shenfield Railway Station and local bus routes will ensure that travel by public transport is a realistic option for future residents. The NPPF (para 102) states that opportunities to promote public transport use should be identified and pursued by Local Plans. This policy is therefore considered to be "consistent" with the objectives of the NPPF and is sound.
f. Provide well-connected internal road layouts which allow for good accessibility.
5.23 The development of Officer's Meadow would provide opportunities to encourage walking and cycling through new and improved routes and crossing facilities. Improving the accessibility within an already sustainable setting will also help to minimise vehicular traffic, in accordance with National policy. This is "consistent" with the NPPF objectives set out in both Section 8 "Promoting Healthy and Safe Communities" and Section 9 "Promoting Sustainable Transport" .
g. Provision for new multi-functional green infrastructure including public open space.
5.24 The provision of green infrastructure and open space throughout the Site is supported. The development of Officer's Meadow introduces the opportunity to introduce ecological corridors, open space and green infrastructure linkages, as well as enhancing the recreational resource and connectivity value of the Site. The NPPF (para 181) states that planning policies should maximise opportunities for green infrastructure provision and enhancement. This policy is therefore considered "effective" in terms of meeting the requirements set out in the NPPF.
h. Maintain and enhance Public Right of Way within the site and to the wider area.
5.25 Our Client's accompanying Landscape Assessment (Barton Willmore, March 2019) provides information to support the maintenance and enhancement of the existing PRoW on site. Although limiting development, this PRoW allows for the opportunity to introduce ecological corridors, open space and green infrastructure linkages. The NPPF (para 98) states that policies should protect and enhance the PRoW, including taking opportunities to provide better facilities for users. It is therefore considered that this policy is "consistent" and sound in accordance with the NPPF.
i. Protect and where appropriate enhance the Local Wildlife Site (Arnold's Wood).
5.26 Arnold's Wood comprises a narrow strip of Ancient Woodland to the north and the east of the Site. The accompanying Ecological Report (Aspect Ecology (March 2019) identifies this feature as a Local Wildlife Site, whereby appropriate conservation and enhancement through development is a priority. The NPPF (para 170) seeks that planning policies contribute to and enhance the natural and local environment by protecting valued landscapes and sites of biodiversity value, such as area of ancient woodland. The protection and enhancement of the Local Wildlife Site is therefore "justified" with regard to the NPPF, leading to the consideration of this policy as sound.
j. Provide for appropriate landscaping and buffers along sensitive boundaries adjoining the A12 and railway line.
5.27 Our Client's emerging proposals have been informed by a series of technical reports, including the Landscape Report, which provides for a planted buffer to be provided along the A1023 Chelmsford Road to help soften views of the proposed residential development at Officer's Meadow. This policy is therefore "effective" in terms of protecting residential amenity and enhancing the natural environment. The use of appropriate landscaping buffers is also in accordance with the NPPF (Section 15) on "Conserving and Enhancing the Natural Environment", making this criterion sound.
iii) Infrastructure Requirements:
a. Provide pedestrian and cycle crossing points across Chelmsford Road (A1023) where appropriate.
5.28 The accompanying Transport Strategy (Vectos) provides for new and enhanced pedestrian and cycle connections within the Site and to the wider area. As individual development parcels are separated by Chelmsford Road, pedestrian and cycle crossings are required where appropriate to allow safe connection between parcels (as identified in by Infrastructure Requirements). This criteria is therefore supported as the provision of crossing points across Chelmsford Road (A1023) will help to maximise opportunities for sustainable transport modes throughout the Site, to Shenfield railway station and various local services. The NPPF (para 104) states that planning policies should provide for high quality walking and cycling networks. This policy is therefore considered "consistent" with national policy.
b. Provision for improved bus service.
5.29 The provision of an improved bus service, with reference to the IDP, is supported. This criterion is sound in the light of Para 110 of the NPPF. It is therefore "justified".
c. The Site is located within a Critical Drainage Area. This development may have the potential to impact on the Critical Drainage Area in respect of surface water flooding. As a result of this, the site is likely to require an individually designed mitigation scheme to address this issue.
5.30 The majority of the Site is located within Flood Zone 1. As referred to in the accompanying Drainage Report (JNP, March 2019), the critical drainage can be dealt with by the creation of a surface water storage basin/wetland area to attenuate and release the overland surface water flows from off site at a reduced rate. An individually designed mitigation scheme can be implemented on-site via a variety of SuDS, in accordance with the provisions of the NPPF (para 163). These components will also adequately provide for surface water flows generated by the proposed development. The above criteria is therefore considered to be sound and "effective".
5.31 In addition to the above elements of physical infrastructure, and as mentioned previously in respect of other aspects of Policy RO3 allocation, we are also mindful of accompanying social infrastructure - in particular the educational needs of the resultant residents and the relationship with the adjoining Shenfield High School. It is therefore appropriate to reiterate our Client's willingness to work closely with the High School in helping to deliver its aspirations in providing for a "through school" (with Primary provision) and our off-site educational financial contributions will be directed to support this.
5.32 In overall terms, we largely support the provisions of Policy RO3 and have sought to reflect this is the accompanying illustrative concept masterplan, which demonstrates the delivery of the requisite infrastructure for the Site Allocation as a whole including:
- Social infrastructure - primary school, early years and nursery care;
- Transport infrastructure - pedestrian and cycle crossing points;
- Critical drainage mitigation; and
- Blue and Green Infrastructure.
5.33 The above demonstrates our overall support for the allocation of the Site and we can confirm that the proposed development is deliverable within the timescales established by BBC. The delivery of Land North of Shenfield ("Officer's Meadows") is addressed in the next section.
6.0 DELIVERY OF LAND NORTH OF SHENFIELD
6.1 A range of technical work and evidence has been worked up for the Site and which demonstrates the deliverability of the proposals. This technical input is set out in full in the Technical Representations accompanying these submissions.
6.2 This report therefore does not seek to repeat the technical material in full, instead it provides a summary of the main disciplines and how they relate to the delivery of the project.
6.3 This includes work in relation to the following disciplines:
i) Transport (Vectos);
ii) Landscape/Green Belt Assessment (Barton Willmore Landscape);
iii) Drainage (JNP Group)
iv) Noise (Sharps Gayler)
v) Ecology (Aspect Ecology);
vi) Archaeology (Albion Archaeology); and
vii) Masterplan (Barton Willmore Design).
6.4 Below is a brief summary of each of the update reports submitted in terms of the delivery of the scheme.
i) Transport
6.5 The accompanying Transport Strategy (Vectos) (Appendix 03) sets out the principle of a sustainable transport strategy for Officer's Meadow, reducing the need to travel and providing opportunities for non-car journeys. The proximity of the Site to local services and the proposed 'all through' school across the wider site will reduce trip generation and promote sustainable communities.
6.6 The Transport Strategy identifies the junction location i.e. A1023 Chelmsford Road/A129 Hutton Road/A1023 Shenfield Road and the appropriate mitigation measures, which include the implementation of MOVA or similar as a mitigation, in order provide adequate capacity. The access and egress via Alexander Lane will be provided in the form of simple priority junctions.
6.7 The new access points/roundabouts can be fully accommodated within the Site area and/or on highway land. Highways improvements are therefore deliverable as part of the comprehensive development for the scheme. As such, Land North of Shenfield is suitable for allocation in the Local Plan, in terms of highways and transport constraints.
ii) Landscape and Visual Appraisal/Green Belt Review
6.8 A Landscape and Visual Appraisal (BW Landscape) (Appendix 04) has been undertaken to provide a review of the landscape character and visual amenity of the Site and surrounding area. These aspects have informed the parameters of the illustrative masterplan and have demonstrated that the Site is suitable to be released through 'exceptional circumstances' for development, as addressed below. It supports BBC's removal of Land North of Shenfield from the present Green Belt designation, which presently washes over the entire Site and its surrounding environs.
6.9 Direct adverse impacts of development on the wider Green Belt setting would be minimised by locating strategic open space on prominent land, particularly in the north east the Site. Low density housing could be located in the most prominent areas, framing the retained Ancient Woodland area to the north and east of the Site. A PRoW also traverses the Site, enabling the introduction of ecological corridors, open space and green infrastructure linkages, as well as enhancing the recreational resource and connectivity of the Site.
6.10 Development of the Site would form a logical extension that is in keeping with the existing settlement, better connecting the ribbon development between Chelmsford Road and the settlement edge of Alexander Lane. In terms of visibility, glimpses of the Site can be seen from elevated views to the west. However, the landform ensures that it is largely well contained by a combination of vegetation cover and built form, restricting long-distance views. A landscape-led approach to development within the Site would seek to ensure that existing defensible boundaries continue to prevent unrestricted sprawl.
6.11 The LVA concludes that allocation of the Site would result in successful assimilation and integration of new residential development, with the potential for adverse effects on the landscape setting moderated, as required by the NPPF. The Site is considered to be of "low sensitivity" as it is of a low landscape value and the localised visual envelope of the Site, coupled with the surrounding land uses, lends itself to residential development. The Site makes a minimal contribution towards the 5No purposes of the Green Belt, making it suitable for release and able to contribute towards a suitable pattern of development for Shenfield.
iii) Drainage
6.12 A Flood Risk and Drainage Note has been prepared (JNP Group) (Appendix 05). This confirms the location of the majority of the Site within Flood Zone 1, where there is the lowest probability of flooding and where new development should be steered. A small part of the Site is located within Zones 2 and 3. Built development (housing, social infrastructure, etc.) will avoid Flood Risk areas.
6.13 All proposed buildings within "Officer's Meadows" are to be located in Flood Zone 1. Essential infrastructure which passes through a small area designated as Flood Zone 3 will be subject to the "Exception Test" and site-specific flood risk assessment to demonstrate safe access & egress from the site and that the development does not increase flood risk both on and off site. Safe access & egress will be provided off Chelmsford Road A1023 and Alexander Lane. Where affected, allowance for flood compensation storage will be provided to ensure no net loss in flood storage.
6.14 The critical drainage can be dealt with by the creation of surface water storage basins/wetland areas to attenuate and release the overland surface water flows form off site at a reduced rate. Development generated surface water flows can be dealt with via SuDS components and a storage basin/wetland attenuation area. The Site is therefore suitable and deliverable from a flood risk and drainage perspective.
iv) Noise
6.15 An assessment of "likely noise constraints" has been undertaken (Sharps Gayler) (Appendix 06) to identify potential constraints relating to noise and vibration upon Officer's Meadow. The below conclusion is based on a desktop assessment, informed by computer modelling of transportation noise sources in the area (A12, A1023 and the mainline railway).
6.16 Whilst there is a low to medium risk on the boundaries of the Site with Chelmsford Road and the rail line, the majority of the Site presents a low risk. At low noise levels, the Site is likely to be acceptable from a noise perspective, provided that a good acoustic design process is followed at the detailed application stage, particularly for development within 50m of Chelmsford Road and the rail line.
6.17 The assessment concluded that there are no significant constraints on Site in relation to noise. Land North of Shenfield is therefore suitable and deliverable from an acoustic perspective.
v) Ecology
6.18 An Ecological Appraisal has been undertaken (Aspect Ecology) (Appendix 07). This report confirms that the Site comprises a range of habitats including arable, woodland, grassland, watercourse, hedgerows, scrub and lines of trees. The woodland at the north-east of the Site, the watercourse and the hedgerows are of elevated ecological value and are considered to be important ecological features.
6.19 Protected species such as bats, badgers, dormice and reptiles have not been identified within the vicinity of the site at this stage. Although thought to have 'good' suitability for Great Crested Newt, a DNA survey (2015) found the pond nearest to the Site unlikely to support a Great Crested Newt population. A further Great Crested Newt presence/absence survey of all relevant ponds associated with the Site is to be undertaken in 2019.
6.20 The habitats at the Site are currently unmanaged from an ecology point of view and the development proposal presents the opportunity of securing suitable management practices, appropriate mitigation and 'net gains' in terms of biodiversity. When considering ecological constraints, the Site is therefore both suitable and deliverable, subject to further survey work.
vi) Heritage Assessment
6.21 A Desk-based Heritage Assessment (Albion Archaeology) accompanies these representations, which has also been informed by a preliminary walk-over of the Site. The accompanying report (Appendix 08) reviews the potential for below ground archaeological interest and potential impact arising from development on such features; as well as an assessment of any direct impact on potential heritage assets.
6.22 No heritage assets other than the crop mark of a bomb crater, have been recorded in the proposed development area. Other heritage assets comprise former buildings, the postulated course of a Roman road, find-spots and historic settlement cores, whose setting will not be impacted by the proposed development. The adjacent railway lines, roads, buildings and vegetation suggest that the proposed new buildings are unlikely to be visible from these heritage assets. The potential impact on the setting is therefore assessed as "no change". The significance of this impact is "insignificant".
6.23 The potential for archaeological remains has been assessed covering prehistoric to modern periods. In general terms the "significance" of any remains is low to moderate. Any potential impact of the new development on potential buried archaeological remains could be mitigated by measures to investigate and record the presence/absence of potential archaeological assets. Officer's Meadows is thereby deliverable from an archaeological perspective.
vii) Masterplan
6.24 The accompanying illustrative concept masterplan (BW Design) (Appendix 09) has been developed in response to the above technical information prepared for the Site.
6.25 This demonstrates the ability of the Site itself to deliver:
* Circa 510 homes ("Officer's Meadow" site) inc. affordable provision;
* The proposed dwellings can be delivered within the timescale of the housing trajectory, with varying densities;
* Other potential linkages to Chelmsford Road (A1023) and Alexander Lane;
* A 60-bed care home;
* A Local Centre/ community facility;
* Multi-functional green and blue infrastructure; and
* Sustainable transport links.
6.26 Moreover, the illustrative concept masterplan also demonstrates the delivery of:
* Significant areas of Public Open Space encompassing:
- Natural and Semi-Natural Green Spaces;
- Outdoor Sports Facilities; and
- Children's/Young People's Play Area.
* Primary School provision on the adjoining Shenfield High School.
6.27 The above provides an overview of the technical inputs to the Land North of Shenfield (Officer's Meadow) and which confirms that the Site and proposals for it are deliverable within the Local Plan context. The proposals for the Site form part of an iterative process and further information will come to light in advance of a planning application to ascertain the detailed parameters for the Site.
6.28 These matters will be "screened" for a full Environmental Impact Assessment for a subsequent planning application, and it is envisaged the EIA Screening will be submitted later in 2019.
7.0 SOUNDNESS OF OTHER LOCAL PLAN POLICIES
7.1 This section does not seek to comment on other specific allocations/sites. Instead it focuses on policies of relevance within the Local Plan and sets out our comments and recommendations on these in terms of the tests of soundness in the NPPF.
7.2 Policy SP01: Sustainable Development takes a positive approach towards "Presumption in Favour of Sustainable Development" and seeks to apply this in terms of planning applications, in accordance with the Development Plan. The NPPF (para 11) assumes a strong "Presumption in Favour of Sustainable Development" in all planning related matters and places a responsibility on LPAs to positively seek opportunities to meet the development needs of their area and to, as a minimum, provide for objectively assessed needs for housing and other uses. This policy is "consistent" with the NPPF and is therefore sound.
7.3 Policy SP02: Managing Growth seeks to support the delivery of homes by setting out provision for 7,752 new dwellings to be built over the Plan period 2016-2033, at an annual rate of 310 dwellings up to 2022/2023, followed by 584 dwellings from 2023/24-2033. This objective is not supported, as it is considered that this stepped trajectory which delivers a greater proportion of the required homes beyond 2023, could be reviewed to allow more housing to come forward from the period 2021 onwards. This is with particular reference to NPPF (para 23) which states that "strategic policies should provide a clear strategy for bringing sufficient land forward, and at a sufficient rate, to address objectively assessed needs". This policy is therefore "not consistent" with the NPPF and not sound.
7.4 We consider that in order to address this, the Council should review its housing trajectory and at the same time, clarify the new dwelling number ahead of the Local Plan submission, to align with the February 2019 agreed position on the 'baseline' for the standard method calculation.
7.5 The Council should, in addition, work with developers to bring applications forward in advance of the adoption of the Local Plan, to meet housing need.
7.6 Policy SP03: Health Impact Assessments (HIAs) states that Brentwood Borough Council is committed to ensuring all new developments promote healthier and inclusive environments. The majority of proposals will be required to assess their impacts on health and well-being upon the capacity of existing health care and social care services and facilities, the environmental impacts, and the promotion of health improvement activities, arising from the development. Developments of 50 or more units are required to submit a Health and Well-Being Impact Assessment, as required by the EPOA HIA Guidance Note.
7.7 This policy is considered to be unsound as it is not "justified". The requirement to undertake a Health Impact Assessment (HIA) is a superfluous burden on applicants. It should be down to the Local Plan to take into account wider health concerns in the local area and focus policies upon addressing these concerns. Health and well-being should be covered within the polices of the Local Plan and where a development aligns with these, an HIA should not be required.
7.8 Policy SPO4: Developer Contributions refers to the need for all new development to be supported by, and have good access to, all necessary infrastructure. Developers and land owners must work positively with the Council, neighbouring authorities and other infrastructure providers throughout the planning process to ensure that the cumulative impact of development is considered and then mitigated.
7.9 Applicants proposing new development will be expected to make direct provision or contribute towards the delivery of relevant infrastructure, as required by the development either alone or cumulatively with other developments. The Infrastructure Delivery Plan (IDP) identifies the types of infrastructure required to support the anticipated growth in the borough and includes a summary of the current identified infrastructure projects.
7.10 Policy SPO4 should be more explicit on the exact nature of requirements that the developer may be required to meet to avoid overly onerous requirements or confusion over cumulative impact and phasing with other developments and therefore this policy is not "justified" and is unsound.
7.11 Policy SP05: Construction Management states that all major development should sign up to the Considerate Constructors Scheme, or equivalent. Major development must consider the cumulative impacts of other major development occurring in the vicinity, to reduce the cumulative impacts.
7.12 It is considered that this policy accords with the NPPF and is therefore found to be sound, with particular reference to NPPF (para 72) which refers to larger scale development supported by the necessary infrastructure and facilities.
7.13 Policy SP06: Effective Delivery of Development states that proposals for large allocation sites will be expected to be developed in partnership with the Council, infrastructure providers and other relevant organisations, through a collaborative masterplanning approach. Development proposals should submit a supporting statement setting out the sustainable long-term governance and stewardship arrangements for community assets including land, services and facilities such as village halls, community centres, libraries, parks, green spaces, and buildings for sports, leisure, healthcare, education, social, arts and cultural activities. This policy is overly onerous and therefore "unjustified". This policy is therefore considered to be unsound.
7.14 Policy BE02: Sustainable Construction and Resource Efficiency requires all development proposals to maximise the principles of energy conservation and efficiency. Whilst the NPPF (para 153) has regard to the inclusion of renewable and decentralised energy as part of a new development, it states that such features are only required where it is either feasible or viable. This policy is therefore not "consistent" with National Policy.
7.15 We therefore object to the policy in its present form. In order to ensure consistency with National policy, criteria (f) of Policy BE02 should be revised to mirror the NPPF position. Therefore, it is considered that proposed Policy BE02 is unsound.
7.16 Policy BE03: Carbon Reduction, Renewable Energy and Water Efficiency states that proposals for renewable, low carbon or decentralised energy schemes will be supported, subject to adverse cumulative and visual impacts, which cannot be satisfactorily addressed. Criteria (b) of the proposed policy sets out the minimum standards of sustainable construction and carbon reduction. It is Government policy to seek to deliver improvements to emissions from buildings through the application of building regulations. It is therefore considered that the table provided in proposed Policy BE03 is not required, and therefore this policy is "unjustified" and unsound.
7.17 Policy BE04: Establishing Low Carbon and Renewable Energy Infrastructure Network sets out that developments will be required to provide for the necessary infrastructure to meet the needs of the development, specifically stand-alone renewable energy infrastructure. The policy advises that new development of over 500 units, or where the clustering of neighbouring sites totals over 500 units, will be expected to incorporate decentralised energy infrastructure.
7.18 The supporting text refers to the need for District heating networks and the identification of Strategic allocations in the Brentwood IDP, including the Officers Meadow's masterplan area, that could provide opportunities for DH and CHP schemes as energy solutions for new development.
7.19 This policy is considered overly onerous and "unjustified" in relation to the NPPF and therefore unsound.
7.20 In order to make the policy more effective, it could set out that the delivery of renewable energy infrastructure should be required based on evidence of need and viability and a "viability assessment" (at the time planning applications are submitted/determined) - as per Policy SP04.
7.21 Policy BE08: Sustainable Drainage seeks that all developments should incorporate appropriate Sustainable Drainage Systems (SuDs) for the disposal of surface water, in order to avoid any increase in flood risk or adverse impact on water quality. Larger sites over 1 hectare in Zone 1 must be accompanied by a Flood Risk Assessment. Water runoff will comply with the requirements of this policy by provision of SuDS in the surface water drainage strategy. The NPPF (para 163) refers to the need for local planning authorities to ensure that flood risk is not increased elsewhere. Where appropriate, applications should be supported by a site-specific flood-risk assessment. This aspect of the policy is therefore considered "consistent" with the NPPF.
7.22 Given the extensive nature of the development, opportunities exist to incorporate the above the SuDs management across the site both locally and site-wide. However, the requirement for prevention if run-off for all rainfall events up to 5mm is in excess of the SuDS manual and is therefore "unjustified". Unfortunately, this therefore renders the overall Policy BE08 to be unsound.
7.23 Policy BE10: Connecting new developments to digital infrastructure seeks to support Brentwood's economic growth and productivity by improving the offer of digital infrastructure available within the Borough. Whilst planning strives to achieve the highest possible standards of construction and performance for new dwellings, Council's should not seek higher standards than Building Regulations on any other technical standards. Proposed Policy BE10 is therefore "unjustified" in light of National policy and therefore unsound.
7.24 Policy BE11: Strategic Transport Infrastructure requires that development in proximity of the railway stations demonstrate how the scheme connects the surrounding walking, cycling and public transport links to the station, linking new developments with the fast high-capacity transport links into London from Shenfield and the improved linkages from the Elizabeth line. Development close to schools and early years childcare facilities should facilitate an attractive public realm that is safe for children and encourages walking and cycling to address the impacts of school run traffic, in line with ECC's Developers' Guide to Infrastructure Contributions. This aligns with the NPPF (section 9) on "Promoting Sustainable Transport". These considerations therefore appear to be "justified", in accordance with national planning policy and therefore the policy is sound.
7.25 Policy BE13: Sustainable Means of Travel and Walkable Streets and Policy BE16: Mitigating the Transport Impacts of Development refers to sustainable modes of transport that should be facilitated through new developments, promoting accessibility and integration into the wider community and existing networks. Any development requiring a new road or road access, walking and cycling facilities and public transport, will be required to have regard to the adopted ECC's Development Management Policies or successor documents.
7.26 The policies seek to secure developments that are, inter-alia, designed to make necessary contributions to the improvement of existing infrastructure and provision of new infrastructure; be consistent and contribute to the implementation of the Essex County Council's Development Management Policies and include Transport Assessments and Travel Plans. This aligns with the NPPF (section 9) "Promoting Sustainable Transport" and is therefore considered "justified" and sound.
7.27 Policy BE17: Parking Standards refers to the vehicle parking requirement set out in the most up-to-date Essex Parking Standards. The NPPF (para 105) states that when setting local parking standards policies should take into account: a) the accessibility of development b) the type, mix and use of development c) the availability of and opportunities for public transport d) local car ownership levels and e) the need to ensure an adequate provision of spaces for charging plug-in and ultra-low emission vehicles. This aligns with the flexibility allowed for in Policy BE17, whereby the imposed parking standards are subject to the site's ability to minimise pressure on land and encourage the use of alternative modes of transport.
7.28 However, Policy BE12 also deals with "parking matters", but is not aligned with Policy BE17. This adds further inconsistency, in addition to Policy BE17 itself being "inconsistent" with the NPPF. It is therefore presently unsound.
7.29 Policy BE18: Green and Blue Infrastructure requires that Brentwood's existing ecological networks, open spaces, and green/blue features within the built environment are protected, planned, enhanced and managed as a part of the Borough's wider network of green and blue infrastructure. Points A-I of Policy BE18 identify the measures by which development proposals can maximise opportunities to protect and enhance green and blue infrastructure, aligning with the NPPF (section 15) "Conserving and Enhancing the Natural Environment".
7.30 However, it is presently unclear how any net gains/losses and any associated requirements would be measured/calculated, or the mechanism by which the Council or developer would deliver this. This is therefore both "unjustified" and "inconsistent", and therefore unsound.
7.31 Our Client largely supports the principle of Policy BE18, but it also unfortunately includes the requirement for a developer to ensure there is sufficient foul capacity within the local network before a development commences. Whilst our Client would liaise with Anglican Water, it is ultimately the Water Authority's responsibility to ensure sufficient capacity. Therefore as presently worded, the policy is "unjustified" and is unsound.
7.32 Policy BE19: Access to Nature seeks that major developers provide direct access to nature and that this provision is protected, planned, designed and managed as an integrated feature of the landscape. Developments in areas that are more than 1km walking distance from an accessible green open space should also seek opportunities to improve resident's experience and interaction with nature by means of design. The NPPF (section 8) "Promoting Healthy and Safe Communities" states that planning policies should be based on robust and up-to-date assessments of the need for open space, this policy is therefore deemed to be "consistent" with the NPPF and sound.
7.33 Policy BE22: Open Space in New Development seeks that major developments provide functional on-site open space and/or recreational amenities, in accordance with standards set out in the Council's Open Space Standards (see Figure 5.4 Open Space Standards and Fig 5.5 Fields in Trust Children's Play Space Standards in the Reg 19 Local Plan). Maintenance Plans should be submitted at planning application stage for all new facilities provided for exercise or recreation purposes.
7.34 The Council's Open Space Standards seek proposals which meet the Fields in Trust (Guidance for Outdoor Play Space: Beyond the Six Acre Standard) minimum standards. The FiT standards relate to provision on the basis of hectares per 1,000 population generated. The Council's Open Space Standards are considered to be effective as they are based on FiT standards and are therefore "justified" and the policy is sound.
7.35 Policy BE23: Open Space, Sport and Recreational Facilities states that permissions will not be granted for the development of designated Protected Urban Open Space or Local Green Space unless it can be demonstrated that alternative and improved provision can be created, existing open space enhanced or no additional displacement within the Green Belt caused. As with Policy BE22, where appropriate all proposals will be required to comply with the Council's Open Space Standards which aim to meet those set out by FiT. It is therefore considered that policy BE22 is "justified" in line with national guidance and therefore sound.
7.36 Policy HP01: Housing Mix sets out that all new development should deliver an inclusive and accessible environment throughout. On development sites of 500 or more units, the Council will require an appropriate mix of dwelling types, sizes and tenures to meet the identified housing needs in the borough as set out in the Strategic Housing Market Assessment (SHMA). Each dwelling is to be constructed to meet requirement M4(2) accessible and adaptable dwellings, unless built in line with M4(3) wheelchair adaptable dwellings. A minimum of 5% self-build homes is to be provided, which can include custom housebuilding and provision for Specialist Accommodation, taking account of local housing need in accordance with the criteria set out in Policy HP04 Specialist Accommodation. Where a development site has been divided into parts, or is being delivered in phases, the area to be used for determining whether this policy applies will be the whole original site.
7.37 The objective of securing accessible and adaptable homes is supported, however, it is unclear as to how the "each dwelling to be constructed to meet requirement M4(2) accessible and adaptable dwellings, unless it is built in line with M4(3) wheelchair adaptable dwellings" is a fair and reasonable request.
7.38 The supporting text refers to DCLG research which shows that, based on English Partnerships figures from 2011-2012, nearly 30% of households have at least one person with a long-term illness and over 3% have one or more wheelchair user. While nationally 3.3% of households have a wheelchair user, for households living in affordable housing this rises to 7.1%. The rates are also higher for older households and, given that the number of older person households in the borough is set to increase over the period to 2033, the Council seeks to ensure 5% of affordable housing development on proposals of 60 or more dwellings archives requirement M4(3) wheelchair accessible dwellings.
7.39 This need for "all developments" to meet this target is not set out in the evidence or in the NPPG (referred to in the supporting text) and is therefore "unjustified" and unsound.
7.40 Policy HP03: Residential Density sets out that residential development proposals will generally be expected to achieve a net density of at least 35 dwellings per hectare net or higher. Proposals for new residential development should take a design-led approach to density which ensures schemes are sympathetic to local character and make efficient use of land. Proposals for housing developments should "Make an Effective Use of Land" in line with NPPF (Section 11). This policy is therefore "consistent" with the NPPF and sound, but must provide for a degree of flexibility to allow for local circumstances.
7.41 Policy HPO4: Specialist Accommodation the Council encourages and supports proposals which contribute to the delivery of Specialist Accommodation, as referenced in the Land North of Shenfield Site allocation "other types of specialist housing (to be provided) in accordance with the Council's policy requirements". This form of accommodation includes, but is not limited to, housing for older people such as Independent Living schemes for the frail elderly.
7.42 The Council's SHMA indicates that, if occupation patterns of Specialist Residential Accommodation for older people remain at current levels, there will be a requirement for 494 additional specialist units to 2033, aligning with the requirement in the Land North of Shenfield site allocation for provision of a residential care home (a 60-bed scheme as part of the overall allocation). This policy is also "consistent" with the NPPF section 5 (para 64 b) and is therefore considered to be sound.
7.43 Policy HPO5: Affordable Housing seeks to provide a portion of affordable housing on residential developments of 11 dwellings or more or on those which have a combined gross floorspace of greater than 1,000 sq. m (gross internal area).
7.44 The affordable housing requirement relates to 35% provision in all areas of the Borough. The Council requires that the tenure split be made up of 86% Affordable/Social Rent and 14% as other forms of affordable housing (this includes starter homes, intermediate homes and shared ownership and all other forms of affordable housing as described by national guidance or legislation) or regard to the most up to date SHMA. The affordable housing is to be designed in such a way as to be seamlessly integrated to that of market housing elements of a scheme and distributed throughout the development, so as to avoid the over concentration in one area.
7.45 Viability is referred to, but the policy does not go far enough. We would recommend that the policy includes a clause which requires a viability assessment to be submitted and considered whereby schemes are unable to meet the full affordable provision, which is not included at present. The policy is therefore "unjustified" and unsound.
7.46 Policy HP06: Standards for New Housing requires that all major residential developments meet the Government's nationally described space standard. It is considered that the standard is an appropriate tool to use when considering the provision of good housing. However, this should not be limited to major development, but should instead extend to all emerging residential development, whilst allowing for the consideration of local circumstances and site-specific conditions, in order to accord the NPPF (Section 12, Achieving Well-Designed Places). The policy is therefore "unjustified" in relation to need and viability (our emphasis) in accordance with the NPPF. The adoption of nationally described space standards is also at the discretion of the LPA and should be decided upon in a local context. The policy is therefore considered unsound.
7.47 Policy HP12: Planning for Inclusive Communities refers to the need to plan for and build inclusive environments that support communities. Proposals should provide access to good quality community spaces, services and infrastructure, encouraging social interaction, ensuring inclusivity and promoting safety. The policy is deemed "consistent" with NPPF (section 8) "Promoting Healthy and Safe Communities" which states that planning policies should aim to achieve healthy, inclusive and safe places which promote social interaction, are safe and accessible, and support healthy lifestyles. The policy is therefore considered sound.
7.48 Policy HP13: Creating Successful Places seeks that proposals meet high design standards, in order to deliver safe, inclusive, attractive and accessible places. Elements A-M of policy HP13 identify measures considered to create successful places, in accordance with section 12 of the NPPF on "Achieving Well-Designed Places". The NPPF (para 128) states that design quality should be considered throughout the evolution and assessment of individual proposals. Policy HP13 is therefore considered to be "consistent" with the NPPF and sound.
7.49 Policy HP16: Buildings Design seeks for development to be well designed and of a high quality, having regard to Development Management criteria including scale, density, layout, siting, character and appearance. This policy is considered to be "consistent" with the NPPF having particular regard to Section 12 on "Achieving Well-Designed Places" and therefore sound.
7.50 Policy PC02: Job Growth and Employment Land seeks that provision is made for 5,000 additional jobs in the Borough over the Plan period at a rate of 250 per year. NPPF Section 6 on "Building a Strong, Competitive Economy" sets out that planning policies should support economic growth, in order to create jobs and prosperity by taking a positive approach to sustainable new development. The strategic allocation at Land North of Shenfield supports economic growth and creates new opportunities and is "consistent" with national guidance and is sound.
7.51 Policy PC03: Employment Land Allocations highlights areas allocated by the Council for general employment and office development. Para 82 of the NPPF states that planning policies should recognise and address the specific locational requirements of different employment sectors. The allocations set out in policy PC03 are informed by the wider spatial strategy, which aims to retain the Borough's character and encourage employment growth in suitable locations, in accordance with national planning policy. This policy is therefore deemed to be "consistent" with the NPPF and considered to be sound.
7.52 Policies NE01: Protecting and Enhancing the Natural Environment (inc SSSIs) and NE03: Trees, Woodland, Hedgerows (inc Local Wildlife Site, Local Nature Reserves) work to restrict development that would have a detrimental effect on, or result in the loss of, significant landscape heritage or a feature of ecological importance.
7.53 Our Client wholly supports the principles of both of these policies, albeit as presently worded, they both contain contradictory requirements: Policy NE01 (para B) states that proposals that lead to deterioration or loss of the Borough's designated and non-designated biodiversity assets will not be permitted; whereas Policy NE01 (para C) goes on to state that where adverse impacts are unavoidable they must be adequately and proportionally mitigated (ie it appears to allow for deterioration where they are unavoidable and can be suitably mitigated).
7.54 Policy NE03 (para A) contains a similar contradictory approach to the provisions of the remainder of the policy - as with Policy NE01.
7.55 In the light of this both Policy NE01 and Policy NE03 are not inconsistent with each other, they are also "inconsistent" with National policy, "unjustified" and therefore unsound.
7.56 Policy NE05: Air Quality seeks to restrict development, which would directly or indirectly, impact air quality within the Borough. Measures to offset or mitigate those impacts are introduced as part of proposals to ensure that receptors would not be subject to unacceptable risk as a result of poor air quality. This policy is "consistent" with the objectives of the NPPF (para 181) and is therefore considered sound.
7.57 Policy NE06: Flood Risk requires that development avoid flood risk to people and property, managing any residual risk and taking account of the impacts of climate change. Developments should be located in areas with the lowest probability of flooding (Flood Zones 1 & 2). Where development is located within Flood Zone 3, the Exception Test will apply.
7.58 The NPPF (section 14) "Meeting the Challenge of Climate Change, Flooding and Coastal Change" states that inappropriate development in areas at risk of flooding should be avoided by directing development away from the areas at the highest risk. The majority of Policy NE06 therefore aligns with National guidance and therefore mostly sound. However, and as presently worded, it suggests tat applicants may be obligated to set aside land to provide flood management to benefit areas outside of that development. This is unduly onerous, inconsistent with National policy and therefore unsound.
7.59 Similarly, the entirety of a development area does not need to remain operational at times of flood (such as access roads), if there is an alternative safe means of escape that is provided. Subsection c) of Policy NE06 is therefore not justified and also unsound.
7.60 Policy NE09: Green Belt seeks that the Metropolitan Green Belt within Brentwood Borough will be preserved from inappropriate development so that it continues to main openness and serve key functions. Policy NE09 states that all development proposals within the Green Belt will be considered in accordance with the provisions of section 13 of the NPPF on "Protecting Green Belt Land". It is therefore considered that policy NE09 is "justified" and sound, in the light of national policy.
7.61 Policy NE13: Site Allocations in the Green Belt states that sites allocated to meet housing need, within the Green Belt, will be expected to provide significant community benefits. These are the "exceptional circumstances" for sites to be removed from the Green Belt to allow development to take place, providing new defensible boundaries and protecting the open countryside. The NPPF (para 138) states that, where it has been concluded necessary to release Green Belt land for development, plans should give first consideration to land which has been previously-developed and/or is well-served by public transport.
7.62 The allocated "Officer's Meadow" site provides opportunities for sustainable development and transport modes to be maximised, with its close proximity to Shenfield railway station, in accordance with National policy, leading to the consideration of Policy NE13 as "consistent" with the NPPF and sound.
7.63 The overall approach within the Development Management related policies is supported, however amendments to policy/Appendices of Local Plan is recommended in places as set out above. This would ensure robustness in terms of delivering a sound Local Plan that is positively prepared, justified, effective and consistent with national planning policy.
8.0 CONCLUSION
8.1 The Regulation 19 "Pre-Submission Local Plan" consultation document is supported. These representations fully support the allocation of Land North of Shenfield, which includes our Client's land at "Officer's Meadow". These representations focus mostly on land within our Client's control and are supported by a series of accompanying technical reports that support the proposed allocation.
8.2 Our Client supports the wider and comprehensive development of Policy RO3: Land North of Shenfield, which could ultimately for circa 825 dwellings (inc affordable provision).
8.3 Specifically, the land controlled by our Client represents the largest area of land within Policy RO3 and is largely supportive of the policy requirements set out in the Local Plan. Our Client is keen to work closely with the Borough Council and adjoining landowners to provide a comprehensive approach to development, and our Client's elements would comprise:
* Circa 510 dwellings (inc. Affordable provision)
* A new Local Centre, inc. potential healthcare;
* A 60-bed care home
* Significant areas of "Green" and "Blue" Infrastructure;
* Other community facilities, inc. sports provision.
8.4 These representations have also set out our Client's support of working closely with the adjoining Shenfield High School to provide for enhanced educational facilities. This would be in the form of funding towards on-site Primary provision to help create a "through-school", plus financial contributions to existing secondary provision (if required).
8.5 We would welcome the opportunity of discussing our concerns, with suggested amendments with BBC and ECC Officers at the earliest opportunity.
8.6 Subject to a number of modifications as recommended in this report, we consider the Local Plan to be largely sound in accordance with the NPPF.

Attachments:

Support

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

Representation ID: 24015

Received: 19/03/2019

Respondent: Croudace Strategic Ltd

Agent: Barton Willmore LLP

Representation Summary:

Support requirements with regards to: a care home provision, although this should be subject to the balanced and reasonable distribution of other infrastructure across the Site; 2ha of employment land; provision of a comprehensive masterplan and phasing strategy; vehicular access via Chelmsford road and Alexander Lane; potential diversion of Alexander Lane in terms of pedestrian safety and improved access; provision of green infrastructure and open space; maintenance and enhancement of the existing PRoW; Local Wildlife Site; pedestrian and cycle crossing points across Chelmsford Road; provision of an improved bus service; surface water flooding mitigation scheme.

Full text:

1.0 INTRODUCTION
1.1 These Representations on the Brentwood Borough Council Reg 19 draft Local Plan have been prepared on behalf of Croudace Homes who are promoting their site (Officers Meadows - site number 034), which falls within the broader allocation of "Land North of Shenfield". The allocation encompasses several land ownerships, including Sites 158, 235, 087, 263 and 276, as well as the "Officer's Meadow" site (034), all of which make up the allocation Policy R03. It should be noted that Croudace Homes has controlling land interest in Site 034 only, therefore whilst development proposals have taken the other sites into account, this document is in respect of the "Officer's Meadow" site.
1.2 "Land North of Shenfield" was previously promoted through the Reg 18 Local Plan process (see Site Allocations Map Jan 2016 which supported the Draft Local Plan) historically as one of three separate strategic sites, now shown in the Reg 19 draft Local Plan site allocation as one site, "Officer's Meadow and surrounding land" (ref. Policy R03) allocated for residential development. The "Officer's Meadow" site is the focus of these Representations to the Reg 19 draft Local Plan and is hereby referred to as "the Site".
1.3 These representations are submitted to the Local Plan consultation document and set out our support for the Brentwood Borough Council (BBC) Local Plan in terms of the proposed spatial strategy and the identification of the Site as an allocation for growth.
1.4 These representations are focused on the Site allocation and demonstrate that the allocation is "sound" and deliverable having regard to National policy and a number of technical matters for the Site. It also reviews the Local Plan in terms of soundness of the Duty to Co-operate, the proposed spatial strategy (inc. Sustainability Appraisal) and other policies in the Plan including for Development Management purposes.
1.5 These representations are supported by technical reports included as appendices, which, on behalf of Croudace Homes, provide the background evidence to support the allocation and demonstrates it is "suitable", "available", "achievable" and therefore "deliverable". This will be referred to in these representations and it has regard to BBC's Evidence Base. The technical reports prepared by the consultant team, detail matters concerning:
* Transport;
* Landscape/Green Belt;
* Drainage;
* Noise
* Ecology;
* Archaeology; and
* Masterplanning.
* Shenfield High School "All through" education provision proposals.
1.6 The following sections of these representations are set out as follows:
* Section 2.0 - National Policy;
* Section 3.0 - Duty to Co-operate;
* Section 4.0 - Local Plan Strategy;
* Section 5.0 - Policy LP R03 -Land North of Shenfield (Officer's Meadow);
* Section 6.0 - Delivery of Land North of Shenfield (Officer's Meadow);
* Section 7.0 - Soundness of other policies in the Local Plan; and
* Section 8.0 - Conclusion.
2.0 NATIONAL POLICY
2.1 This section provides an overview of the NPPF with particular regard to plan-making. Other policies in the NPPF will also be referred to later in these representations.
i) National Planning Policy Framework
2.2 On 24 July 2018, the revised National Planning Policy Framework (2018 NPPF) was published by National Government, setting out the planning policies for England and how these are expected to be applied in both plan-making and decision-taking. Post 24 January 2019 any plans submitted after this date must refer to the revised NPPF. This document therefore focusses on the revised 2018 NPPF.
2.3 The revised NPPF introduces the Government's standardised methodology for assessing housing needs. For those LPAs which do not submit plans within the NPPF's transitional period, the standard method will apply as a starting point for assessing housing needs.
a) Plan-Making
2.4 The NPPF 2018 (Para 35) sets out the requirement for Local Plans to be examined by an independent Inspector whose role is to assess whether the Plan has been prepared in accordance with legal and procedural requirements, and whether it is "sound". An LPA should submit a Plan for Examination which it considers is "sound" - namely that it is:
* Positively prepared (as a minimum seeking to meet the area's objectively assessed needs);
* Justified;
* Effective; and
* Consistent with national policy.
2.5 These representations will assess the Pre-Submission Local Plan against the tests of soundness, as above. The next section details the Duty to Co-operate in this regard.
3.0 DUTY TO CO-OPERATE
3.1 This section considers the legal compliance and procedural matters associated with the Local Plan with regard to the "Duty to Co-operate".
i) Policy Framework
3.2 The "Duty to Co-operate" as provided for in Section 110 of the Localism Act 2011 came into effect on 15 Nov 2011. The "duty" was introduced under the 2011 Act to address the impact of the loss of the "top-down" effect from the Regional Strategy and to offer a transparent way in which LPAs should relate to one another on cross boundary issues. The "duty" is now shared between LPAs requiring them to collaborate on cross-boundary matters and issues of sub-regional and regional importance, especially housing provision and infrastructure issues.
3.3 The NPPF 2018 (Paras 24-27) is clear in directing LPAs as to the importance of the "Duty to Co-Operate" and the pro-active approach necessary to ensure a collaborative approach to reflect individual local plans.
ii) BBC's 'Duty to Co-Operate' (DtC)
3.4 The NPPF recommends that where a Housing Market Area (HMA) extends across more than one local authority plan makers should assess need for housing for the whole HMA, rather than just the individual authority. The SHMA (Oct 2018) sets out that Brentwood District is a self-contained Housing Market Area (HMA). On this basis, no further joint evidence base documents were commissioned, but strategic work continues with South Essex Councils.
3.5 The Objectively Assessed Need (OAN) for BBC amounts to 380 dwellings per annum (dpa) as the SHMA advises that the Council plans on the previous OAN evidence (despite referring to 350 dwellings per annum (dpa) following the current guidance, for the period 2019-2029). In addition, the Council propose additional land allocations over and above "need" (20% above 380 dpa). This approach is welcomed in the SHMA guidance, as overprovision should provide additional flexibility in the supply and delivery of sites.
3.6 Since the draft Brentwood Borough Council Reg 19 Local Plan has been published, the PPG HENA details the standard method for assessing housing need and now clarifies that the 2014-based household projections published by the Office for National Statistics should be used to set the 'baseline' for the standard method calculation. The standard method number for Brentwood is 452 dpa.
3.7 The OAN is 7,752 dwellings during the Plan period (2016 - 2033) and it is welcomed that the Local Plan is seeking to meet this need in full (and potentially overprovide). This is addressed further in the housing strategy section to follow. The Plan also provides an equitable distribution of new homes across the HMA and this will be addressed under the Sustainability Appraisal.
3.8 It is evident that BBC has engaged with neighbouring authorities regarding cross-boundary matters as well as meeting housing need, as set out in the Duty to Co-operate Brentwood Position Statement (February 2019).
3.9 As part of the DtC the Borough would normally need to consider whether it is a sustainable location for unmet cross boundary need. However, as Brentwood is a Green Belt authority (89% is Green Belt), it is unlikely that Brentwood will be in a position to accept any unmet housing need from the South Essex housing market area. The Essex neighbours (Chelmsford and Epping Forest) both have plans submitted for examination that are not reliant on Brentwood accepting any of their housing growth.
3.10 Ongoing Duty to Cooperate work continues with South Essex as part of a strategic growth study and participation in a Joint Strategic Plan.
3.11 The Association of South Essex Local Authorities (ASELA) memorandum of understanding was recently signed by Basildon Borough Council, Brentwood Borough Council, Castle Point Borough Council, Essex County Council, Rochford District Council, Southend on Sea Brough Council and Thurrock Borough Council (Jan 2018). This highlights the constraints and challenges facing other local authorities in terms of meeting their housing needs, and emphasises the importance upon BBC in terms of meeting its own needs in full. We therefore welcome BBC's aspirations in seeking to meet its own needs and indeed in seeking to provide to some flexibility too.
3.12 Duty to Co-operate discussions have confirmed that immediate neighbouring authorities are aiming to meet OAHN within their boundaries, but some will have difficulties in this regard. However, as Brentwood is a Green Belt authority, it is unlikely that Brentwood will be in a position to accept any unmet housing need from the South Essex housing market area.
3.13 To ensure the Local Plan is justified and effective (NPPF, para 35), it is considered that the above issues should continue to be updated in the evolving DtC Statement (February 2019).
3.14 The Council needs to continue to have regard to neighbouring authority plans and adequately co-operate with neighbouring authorities, rather than awaiting the future joint strategic plan, as well as Essex County Council plans, and strategies of other relevant bodies.
3.15 This working can be further supported by the Duty to Cooperate meetings dealing with the strategic planning issues relating to the South East Essex 2050 Programme. Also, the Association of South Essex Local Authorities (ASELA) Statement of Common Ground which includes a commitment to joint working through the preparation of a Joint Strategic Plan for South Essex.
3.16 It is recommended that BBC continues to embrace opportunities to work with the other members of ASELA, as well as producing statements of common ground with its neighbouring authorities, which is a key element of plan preparation, in order to secure a "sound" Local Plan which meets the requirements of the Duty to Co-operate.
4.0 LOCAL PLAN STRATEGY
4.1 This section examines and provides commentary on the proposed spatial strategy in the Local Plan, insofar that it relates to the housing and employment provision, and the allocation of strategic sites for growth including within the Green Belt.
4.2 First, we set out our representations on the Sustainability Appraisal for the Local Plan.
a) Sustainability Appraisal
4.3 The BBC Sustainability Appraisal (incorporating Strategic Environmental Assessment) provides an assessment as to how the spatial strategy for the Local Plan was arrived (identifying, describing and evaluating the likely significant effects of implementing the plan).
4.4 The strategy has evolved from the early 'Pathway to a Sustainable Brentwood' Issues and Options document (2009), which set out a series of strategic objectives. The overarching priorities set out in the Interim SA (Jan 2018) are:
* Environment and Housing Management;
* Community and Health;
* Economic Development;
* Planning & Licensing; and
* Transformation.
4.5 In order to achieve these priorities the following plan themes have been set out (with associated objectives as set out in the SA):
* Managing Growth;
* Sustainable communities;
* Economic prosperity;
* Environmental protection and enhancement;
* Quality of Life and community infrastructure; and
* Transport and Movement.
4.6 Having regard to these themes and objectives, 10 No. reasonable spatial strategy alternatives were drawn up in the SA. The desire to deliver at least one large-scale, strategic site (likely for a mix of uses, to include both housing and employment) is quite well established, recognising: A) limited opportunities within settlements; B) no potential to export 'unmet needs' (as discussed); and C) the alternative of piecemeal Green Belt development dispersed widely has significant draw-backs (this option was appraised within the 2013 Interim SA Report).
4.7 A number of strategic site options have been examined over recent years, including through consultation and SA work, such that there is now a refined understanding of those sites that are genuine contenders for allocation through the Local Plan - There is specific mention of North of Brentwood and ....' the potential for expansion to impact 'in-combination' with other potential extensions to the urban Brentwood/Shenfield area, most notably the potential 825 homes on land at Officers Meadow (directly to the east)'.
4.8 The SA goes on to note that there is a need to give careful consideration to growth opportunities at Brentwood/Shenfield urban area.......Brownfield opportunities are limited; hence there is a need to examine Green Belt urban extension options. All land around the urban area is given brief consideration, with reference to the site options and the designated constraints that exist. Specifically:
North of Shenfield
A large area of land is bounded by the railway line to the east, and the A1023 to the west; plus there is a parcel of land to the north of the A1023, bounded by the A12. There are relatively few designated constraints, although considerations include a spur of Arnolds Wood Local Wildlife Site (LWS), and proximity to the railway and main roads. This land parcel comprises three HELAA sites, all of which are preferred allocations at the current time (Officer's Meadow; Land east of A1023; and Land north of A1023).
[SA of Brentwood Local Plan, January 2019 - page 113]
4.9 Of the options considered, the SA concluded that "Option 3" Dunton Hills Garden Village only, in addition to the sites that are a 'constant' across the reasonable alternatives, was the preferred option for growth as it performs well in terms of the majority of sustainability objectives. Furthermore, the option of identifying the delivery of 'constant' sites was also preferred with the objective of meeting both short and long-term needs.
4.10 We fully support and consider the approach of the Sustainability Appraisal to be "sound" in terms of alternative strategies assessed for the Local Plan and consider that the most sustainable option has been arrived at.
4.11 The SA reviewed site options that could deliver the proposed spatial strategy. This includes "suitable" sites as derived from the SHLAA against a series of 12No SA criteria including Housing, Landscape, Community and well-being and other sustainability considerations. This included a "red, amber, green" assessment of sites as against the selected 12No criteria. We support this approach and consider it to meet the requirements of the SEA in terms of the assessment of environmental impacts - this includes BBC's assessment of the Site at North of Shenfield for which we also fully support and consider to be "sound".
4.12 The process allowed for two strategic site options to be discounted (considered 'unreasonable') given planning/sustainability considerations and deliverability considerations. The extent of reasonable sites has been restricted to balance the need to meet housing needs as well as ensuring that pressure will not be put on infrastructure nor pose a serious risk to air quality, local amenity, natural and heritage assets and biodiversity.
4.13 Our Client's considerations of the Council's Sustainability Appraisal have been informed by the accompanying "Review of Sustainability Appraisal" (Barton Willmore EIA, March 2019), which is attached to these representations. (See Appendix 01).
4.14 The preferred approach is Option 3, which involves allocating Dunton Hills Garden Village only, in addition to the sites that are a 'constant' across the reasonable alternatives (including Officers Meadows), and thereby putting in place an overall land supply sufficient to provide the required housing target dpa (assuming no delayed delivery).
4.15 We support the overall approach to the Sustainability Appraisal, insofar as:
* It follows a robust process in evaluating alternative options for growth as well as specific site options;
* The approach to individual site options is considered to be sound; and
* It is considered to be "sound" in that it arrives at the most reasonable option for growth - Dunton Hills Garden Village in addition to the sites that are 'constant' across the reasonable alternatives- as encompassing the allocation at Land North of Shenfield (034).
b) Housing Strategy
4.16 On 19 February 2019, MHCLG published the long-awaited outcome of the 'Technical consultation on updates to national planning policy and guidance', which clarifies the methodology for assessing housing need incorporated in the updated Housing and Economic Needs Assessment (HENA) Published on 20 Feb 2019. The standard method for assessing housing need is detailed in the PPG HENA and now clarifies that the 2014-based household projections published by the Office for National Statistics should be used to set the 'baseline' for the standard method calculation. The standard method number for Brentwood is 452 dpa.
4.17 In order to provide flexibility in the supply of housing sites, help boost delivery and to aim towards the standard method figure, the Council has proposed a further 20% supply buffer when allocating development sites in the Local Plan above the established annual housing figure of 380 dwellings per year, as set out in the SHMA. The buffer allows for an additional housing supply in the borough to be maintained throughout the Local Plan period and is supported in national planning guidance. The Reg 19 Draft Local Plan refers to 456 dpa based on the 20% SHMA uplift on 380 dpa.
4.18 The Local Plan sets out (Policy SP02) the OAN for housing in the Borough as being 7,752 dwellings during the Plan period (2016 - 2033); which when projected across the 17-year plan period gives an annualised housing delivery target of 456 new homes per year. The Council has not been able to identify a 5-yr HLS that delivers this current annualised requirement. When calculating HLS for our representations we have based our assumptions on 452 dpa which is the most up to date guidance (February 2019).
4.19 As a result of 89% of the Borough being designated Green Belt, the Council advises it is difficult to achieve a five-year supply, as many allocated sites within the Green Belt will not be available until the adoption of the Plan. On this basis a larger proportion of sites will not be delivered until after 2023, when they begin to benefit from detailed planning consent.
4.20 Therefore, a stepped trajectory is proposed, with an initial housing delivery target of 310 dpa to 2023 has been set, followed by a higher target of 584 dpa thereafter, which totals 7,752 homes overall in accordance with Policy SP02.
4.21 The Local Plan (Chapter 4, Policy SP02: Managing Growth) indicates that the residual requirement will be sought largely through new development being directed towards the site allocations set out in Chapter 8; and highly accessible locations along transit/growth corridors. These are as follows and seek to deliver circa. 4,500 units up to 2033:
Table 4: Strategic Sites [see attachment]
4.22 In terms of the allocation at Land North of Shenfield ("Officers Meadow"), this includes an overall requirement across the whole site allocation at Policy R03 for 825 units to be delivered in the Plan period. This delivery schedule is supported and is addressed further in the next section.
4.23 We support the housing strategy for the Local Plan and welcome that BBC is seeking to meet its housing needs in full. This is particularly important having regard to the likely inability of adjacent authorities (referred to on page 5) to meet their own needs. We therefore consider the housing strategy in the Plan to be "sound" in accordance with the NPPF (Para 35).
c) Employment Strategy
4.24 Policy PC02: Job Growth and Employment Land identifies that provision is made for at least 47.39ha of new employment land (B-use) to address the needs of the Borough up to 2033. To ensure that the Plan is more effective, it is recommended that this is followed by supporting text setting out the extent of need as derived from the Brentwood Economic Futures report (2018) and Strategic Housing Market Assessment (2018).
4.25 This need is proposed to be met through allocations set out at Policy PC03: Employment Land Allocations. This includes provision of appropriate new employment development on North of A1023 (part of the Land North of Shenfield R03 land use allocation). We fully support this aspect of the Plan including the broad strategy underpinning both the housing and employment allocations. The employment strategy for the Local Plan is justified and "sound" in line with the NPPF (para 35).
d) Five-Year Housing Land Supply
4.26 The Local Plan is unclear in terms of being able to demonstrate a 5-yr HLS of housing land for the purposes of the Plan.
4.27 The most recent AMR (Nov 2018) demonstrates that BBC currently has a supply of 4.1 years - against requirement of 411.6dpa (2,058 units over 5-years) which encompasses a 20% buffer as required by the NPPF and Housing Delivery Test. This is as a result of persistent under delivery, as delivery is currently calculated as 50.83% for BBC, below the 85% requirement.
4.28 The AMR 5-yr supply relates to the period 2018/19 - 2023 and concerns, inter-alia, sites with planning permission, existing commitments and strategic sites at Dunton Hills Garden Village, West Hordon Industrial Estate, Ford Headquarters, etc. The Plan's trajectory details the delivery at proposed allocated sites (2016/17 - 2032/33) amounting to 6,088 units.
4.29 The 2018 AMR suggests the delivery of 819 units (Allocations, Reg 19 Local Plan) within the same timeframe (2018-2023). The figure is derived from existing permissions, developments, allocations and commitments, as well as the 20% buffer, is 1,694.7 units, and concludes the supply is 4.1 years (as set out below):
Table 6: Five Year Supply Position (2018-2023) [see attachment]
4.30 The AMR 2018 refers to the PPPG: HELAA, which sets out how a 5-yr HLS is measured where LPAs have a "stepped" rather than annual average requirements; it states:
Five-year land supply is measured across the plan period against the specific stepped requirements for the particular 5-year period. Stepped trajectories will need to ensure that planned housing requirements are met fully within the plan period.
[Paragraph 017, Reference ID: 2a-017-20180913]
4.31 The AMR 2018 sets out (Table 4: Comparison of annualised housing delivery target and projected completions) a housing delivery target of 7,752 homes (456 dpa over the 17-year Plan period), together with annualised projected housing completions. The report states that from a comparison of this data an initial stepped requirement of 310dpa to 2023, followed by a higher stepped up requirement of 584dpa for the remainder of the Plan period, is a logical approach to reach 7,752 homes by 2033.
4.32 As a result of the high proportion of Green Belt in the Borough, it is extremely difficult to achieve the annualised 5-yr HLS requirement. This is because, as set out in the AMR 2018, sites on the edge of settlements currently within the Green Belt are not available for development purposes until the emerging Local Plan is adopted. Therefore, the potential for a stepped trajectory has been proposed, which delivers a greater proportion of the required homes beyond 2023.
4.33 The above demonstrates that BBC is not fully able to demonstrate a 5-yr HLS for Local Plan purposes. This position could be expedited by allowing allocated sites, such as "Officers Meadow" to come forward 1-2 years sooner, within the present 5-year period, to help meet the required 5-yr HLS position.
5.0 LAND NORTH OF SHENFIELD - POLICY R03
5.1 Land North of Shenfield (Policy R03: Strategic Site - Land North of Shenfield) is allocated in the Pre-submission Reg 19 Local Plan and the extent of the allocation is shown below:
Figure 1: Land North of Shenfield- Allocation Area [see attachment]
5.2 This shows the Site area as allocated as a whole; despite Land North of Shenfield having 6 land parcels within it, namely Site parcels 034, 158, 235, 087,263 and 276, as identified at Appendix 1: Housing Trajectory in the Reg 19 Local Plan and previously set out in earlier iterations of the Reg 18 Local Plan suite of documentation.
5.3 We set out below our comments on Policy RO3 and Appendix 1- Housing Trajectory in regard to the proposed delivery rates. This is largely supportive, however there are some aspects we do not consider to be "sound".
i) Amount and Type of Development:
a. Provision for around 825 new homes of mixed size and type, including affordable housing.
5.4 This criterion is supported/considered to be sound and "effective" in accordance with the objectives of the NPPF (para 61) relating to creating mixed and balance communities. The proposals for the Site will therefore be able to be delivered in accordance with this policy objective.
b. Provision of land (circa 2.1 hectares) for a co-located 2FE [additional text] primary school and early years and childcare nursery (Use Class D1). To be located adjacent to Alexander Lane. [additional text]
5.5 We largely support this criterion, albeit consider it should be amended (as above) to provide for greater clarity. Therefore as presently worded, we object to this criterion.
5.6 Forecasted figures contained in 'Commissioning School Places in Essex 2016-2021' indicate that there will be a deficit in pupil places by 2020/21 when accounting for demographic factors and the proposed uplift in residential development.
5.7 Earlier/recent work undertaken by the High School (and others) considered the anticipated need for a new 1FE Primary School. The proposed policy wording should clarify that it is now proposing a 2FE Primary School. We have prepared an accompanying note (Appendix 02) that reflects are discussions in this regard.
5.8 Consideration should be given to the location of the Primary School. Again, the recent work undertaken by the High School has examined this, inc the early years facility and nursery element, and that it should ideally be located on the existing school playing fields, just north of Alexander Lane. This would enable the Shenfield High School to deliver an 'all through' school provision, comprehensively expanding the educational offer available on-site.
5.9 The NPPF (para 94) seeks that LPAs take a proactive, positive and collaborative approach to meeting school place requirement and to development that will widen choice in education. The principles of this element of Policy R03 is therefore "consistent" with the NPPF, but the wording should be clarified further. We would be happy to continue discussions with Shenfield High School, BBC & ECC Officers in respect of seeking to agree the most suitable location for the primary school provision.
5.10 In terms of its own generated education requirements, the allocation would give rise to a need for a 1FE Primary School and financial contributions towards secondary school provision. Through positive discussions with Shenfield High School, we have been working closely towards its objective of becoming a "through-school" (by encompassing Primary provision) and contributing towards secondary provision (at the High School) on a pro-rata basis.
c. Provision for a residential care home (around 60 bed scheme as part of the overall allocation).
5.11 The principle of this criterion is supported/ considered to be sound and a care home could be accommodated on the 'Officer's Meadow' site, however this should be subject to the balanced and reasonable distribution of other infrastructure across the Site allocation as a whole. The NPPF (section 5) on "Delivering a Sufficient Supply of Homes" requires that housing need for different groups in the community should be assessed and reflected in planning policies. The provision of a residential care home in Policy R03 would contribute towards the offer of care for older people in Shenfield and is therefore "consistent" with the NPPF, in accordance with national policy and is deemed sound.
d. Provision for up to [additional text] 5% self-build and custom build across the entire allocation area.
5.12 The principle of this criterion is supported, but not as presently worded. We therefore object to this criterion in its present form.
5.13 Section 1 of the Self-Build and Custom Housebuilding Act 2015 (as amended by the Housing and Planning Act 2016) requires each relevant authority to keep a register of individuals and associations seeking to acquire serviced plots for their own self-build and custom housebuilding. Whilst the provision of self-build and custom build should be considered, the evidence base for a 5% need across the entire allocation should be addressed against the local "needs register" and demand for such provision at the prevailing time.
5.14 In order to align with National policy, the evidence base and local need should be fully assessed before any commitment is made to the provision of this house type in this location. It is therefore considered that this element of Policy R03 is unsound.
5.15 It is recommended that this aspect of the policy is amended to "up to" 5% as shown above, to reflect prevailing "need" at the time.
e. Provision of 2ha of land for employment purposes.
5.16 The provision of 2ha of employment land as part of the wider allocation is agreed in principle. Employment land situated on land north of Chelmsford Road, as per the location identified in the BBC Site Analysis Overview report (Feb 2019), is supported, given its location adjacent the A12. This is the most appropriate location for such provision and is "consistent" with the NPPF (para 20). Therefore, and if situated in this location, this criterion is considered sound.
ii) Development Principles:
a. Comprehensive masterplan and phasing strategy to be prepared and considered as planning applications come forward.
5.17 We support this criterion and it is confirmed that development can come forward and be delivered within the timescale as shown in the housing trajectory. We also support a comprehensive masterplan and phasing strategy to set out effective phasing of the requisite infrastructure, as identified in the Infrastructure Delivery Plan (IDP) is "consistent" with the NPPF and is considered sound.
5.18 The overall needs of development must have regard to potential considerations in terms of viability in order to be fully "justified", something not yet addressed in the IDP, which should be rectified in the next iteration of the IDP.
b. Site is identified as a key gateway location and development should reflect this in terms of design quality particularly on land near to Junction 12, A12.
5.19 We broadly support these provisions and the concept masterplan sets out conceptually the land take for development in this location, including the key gateway employment location and residential, however this land is not within our Client's control and as such will be the subject of a separate planning application and detailed framework masterplan. In principle, and from an overall design perspective, this key gateway location is consistent with Section 12 of the NPPF and is "justified" and therefore considered sound.
c. Vehicular access via Chelmsford Road (A1023) and Alexander Lane.
5.20 It is recognised that the delivery of vehicular access via Chelmsford road and Alexander Lane is a necessity as part of these proposals. Our Client's accompanying Transport Strategy (Vectos, March 2019) provides evidence to support the development of the Officer's Meadow Site in terms of reducing the need to travel and providing opportunities for non-car travel. This is "consistent" with the NPPF, in particular Section 9 on "Promoting Sustainable Transport". The provision of access via both Chelmsford Road (A1023) and Alexander Lane allows for flexibility in terms of phasing and means that development can take place simultaneously in more than one location on the Site. It is therefore considered that this criteria is sound.
d. Potential for diversion of Alexander Lane, creating a quiet lane for pedestrians and cyclists, with the provision for new and improved route through the development site linking to Chelmsford Road.
5.21 The potential diversion of Alexander Lane is welcomed in terms of pedestrian safety and improved access. This is because a quieter Alexander Lane will improve access to local schools, pedestrian and cycle infrastructure and the existing PRoW, encouraging active mobility. This policy is therefore considered "justified" in light of the NPPF (para 102).
e. Enhancing sustainable links with Shenfield station and local services and facilities in the wider area.
5.22 The accompanying (Vectos) Transport Strategy confirms that the travel opportunities afforded by the service at Shenfield Railway Station and local bus routes will ensure that travel by public transport is a realistic option for future residents. The NPPF (para 102) states that opportunities to promote public transport use should be identified and pursued by Local Plans. This policy is therefore considered to be "consistent" with the objectives of the NPPF and is sound.
f. Provide well-connected internal road layouts which allow for good accessibility.
5.23 The development of Officer's Meadow would provide opportunities to encourage walking and cycling through new and improved routes and crossing facilities. Improving the accessibility within an already sustainable setting will also help to minimise vehicular traffic, in accordance with National policy. This is "consistent" with the NPPF objectives set out in both Section 8 "Promoting Healthy and Safe Communities" and Section 9 "Promoting Sustainable Transport" .
g. Provision for new multi-functional green infrastructure including public open space.
5.24 The provision of green infrastructure and open space throughout the Site is supported. The development of Officer's Meadow introduces the opportunity to introduce ecological corridors, open space and green infrastructure linkages, as well as enhancing the recreational resource and connectivity value of the Site. The NPPF (para 181) states that planning policies should maximise opportunities for green infrastructure provision and enhancement. This policy is therefore considered "effective" in terms of meeting the requirements set out in the NPPF.
h. Maintain and enhance Public Right of Way within the site and to the wider area.
5.25 Our Client's accompanying Landscape Assessment (Barton Willmore, March 2019) provides information to support the maintenance and enhancement of the existing PRoW on site. Although limiting development, this PRoW allows for the opportunity to introduce ecological corridors, open space and green infrastructure linkages. The NPPF (para 98) states that policies should protect and enhance the PRoW, including taking opportunities to provide better facilities for users. It is therefore considered that this policy is "consistent" and sound in accordance with the NPPF.
i. Protect and where appropriate enhance the Local Wildlife Site (Arnold's Wood).
5.26 Arnold's Wood comprises a narrow strip of Ancient Woodland to the north and the east of the Site. The accompanying Ecological Report (Aspect Ecology (March 2019) identifies this feature as a Local Wildlife Site, whereby appropriate conservation and enhancement through development is a priority. The NPPF (para 170) seeks that planning policies contribute to and enhance the natural and local environment by protecting valued landscapes and sites of biodiversity value, such as area of ancient woodland. The protection and enhancement of the Local Wildlife Site is therefore "justified" with regard to the NPPF, leading to the consideration of this policy as sound.
j. Provide for appropriate landscaping and buffers along sensitive boundaries adjoining the A12 and railway line.
5.27 Our Client's emerging proposals have been informed by a series of technical reports, including the Landscape Report, which provides for a planted buffer to be provided along the A1023 Chelmsford Road to help soften views of the proposed residential development at Officer's Meadow. This policy is therefore "effective" in terms of protecting residential amenity and enhancing the natural environment. The use of appropriate landscaping buffers is also in accordance with the NPPF (Section 15) on "Conserving and Enhancing the Natural Environment", making this criterion sound.
iii) Infrastructure Requirements:
a. Provide pedestrian and cycle crossing points across Chelmsford Road (A1023) where appropriate.
5.28 The accompanying Transport Strategy (Vectos) provides for new and enhanced pedestrian and cycle connections within the Site and to the wider area. As individual development parcels are separated by Chelmsford Road, pedestrian and cycle crossings are required where appropriate to allow safe connection between parcels (as identified in by Infrastructure Requirements). This criteria is therefore supported as the provision of crossing points across Chelmsford Road (A1023) will help to maximise opportunities for sustainable transport modes throughout the Site, to Shenfield railway station and various local services. The NPPF (para 104) states that planning policies should provide for high quality walking and cycling networks. This policy is therefore considered "consistent" with national policy.
b. Provision for improved bus service.
5.29 The provision of an improved bus service, with reference to the IDP, is supported. This criterion is sound in the light of Para 110 of the NPPF. It is therefore "justified".
c. The Site is located within a Critical Drainage Area. This development may have the potential to impact on the Critical Drainage Area in respect of surface water flooding. As a result of this, the site is likely to require an individually designed mitigation scheme to address this issue.
5.30 The majority of the Site is located within Flood Zone 1. As referred to in the accompanying Drainage Report (JNP, March 2019), the critical drainage can be dealt with by the creation of a surface water storage basin/wetland area to attenuate and release the overland surface water flows from off site at a reduced rate. An individually designed mitigation scheme can be implemented on-site via a variety of SuDS, in accordance with the provisions of the NPPF (para 163). These components will also adequately provide for surface water flows generated by the proposed development. The above criteria is therefore considered to be sound and "effective".
5.31 In addition to the above elements of physical infrastructure, and as mentioned previously in respect of other aspects of Policy RO3 allocation, we are also mindful of accompanying social infrastructure - in particular the educational needs of the resultant residents and the relationship with the adjoining Shenfield High School. It is therefore appropriate to reiterate our Client's willingness to work closely with the High School in helping to deliver its aspirations in providing for a "through school" (with Primary provision) and our off-site educational financial contributions will be directed to support this.
5.32 In overall terms, we largely support the provisions of Policy RO3 and have sought to reflect this is the accompanying illustrative concept masterplan, which demonstrates the delivery of the requisite infrastructure for the Site Allocation as a whole including:
- Social infrastructure - primary school, early years and nursery care;
- Transport infrastructure - pedestrian and cycle crossing points;
- Critical drainage mitigation; and
- Blue and Green Infrastructure.
5.33 The above demonstrates our overall support for the allocation of the Site and we can confirm that the proposed development is deliverable within the timescales established by BBC. The delivery of Land North of Shenfield ("Officer's Meadows") is addressed in the next section.
6.0 DELIVERY OF LAND NORTH OF SHENFIELD
6.1 A range of technical work and evidence has been worked up for the Site and which demonstrates the deliverability of the proposals. This technical input is set out in full in the Technical Representations accompanying these submissions.
6.2 This report therefore does not seek to repeat the technical material in full, instead it provides a summary of the main disciplines and how they relate to the delivery of the project.
6.3 This includes work in relation to the following disciplines:
i) Transport (Vectos);
ii) Landscape/Green Belt Assessment (Barton Willmore Landscape);
iii) Drainage (JNP Group)
iv) Noise (Sharps Gayler)
v) Ecology (Aspect Ecology);
vi) Archaeology (Albion Archaeology); and
vii) Masterplan (Barton Willmore Design).
6.4 Below is a brief summary of each of the update reports submitted in terms of the delivery of the scheme.
i) Transport
6.5 The accompanying Transport Strategy (Vectos) (Appendix 03) sets out the principle of a sustainable transport strategy for Officer's Meadow, reducing the need to travel and providing opportunities for non-car journeys. The proximity of the Site to local services and the proposed 'all through' school across the wider site will reduce trip generation and promote sustainable communities.
6.6 The Transport Strategy identifies the junction location i.e. A1023 Chelmsford Road/A129 Hutton Road/A1023 Shenfield Road and the appropriate mitigation measures, which include the implementation of MOVA or similar as a mitigation, in order provide adequate capacity. The access and egress via Alexander Lane will be provided in the form of simple priority junctions.
6.7 The new access points/roundabouts can be fully accommodated within the Site area and/or on highway land. Highways improvements are therefore deliverable as part of the comprehensive development for the scheme. As such, Land North of Shenfield is suitable for allocation in the Local Plan, in terms of highways and transport constraints.
ii) Landscape and Visual Appraisal/Green Belt Review
6.8 A Landscape and Visual Appraisal (BW Landscape) (Appendix 04) has been undertaken to provide a review of the landscape character and visual amenity of the Site and surrounding area. These aspects have informed the parameters of the illustrative masterplan and have demonstrated that the Site is suitable to be released through 'exceptional circumstances' for development, as addressed below. It supports BBC's removal of Land North of Shenfield from the present Green Belt designation, which presently washes over the entire Site and its surrounding environs.
6.9 Direct adverse impacts of development on the wider Green Belt setting would be minimised by locating strategic open space on prominent land, particularly in the north east the Site. Low density housing could be located in the most prominent areas, framing the retained Ancient Woodland area to the north and east of the Site. A PRoW also traverses the Site, enabling the introduction of ecological corridors, open space and green infrastructure linkages, as well as enhancing the recreational resource and connectivity of the Site.
6.10 Development of the Site would form a logical extension that is in keeping with the existing settlement, better connecting the ribbon development between Chelmsford Road and the settlement edge of Alexander Lane. In terms of visibility, glimpses of the Site can be seen from elevated views to the west. However, the landform ensures that it is largely well contained by a combination of vegetation cover and built form, restricting long-distance views. A landscape-led approach to development within the Site would seek to ensure that existing defensible boundaries continue to prevent unrestricted sprawl.
6.11 The LVA concludes that allocation of the Site would result in successful assimilation and integration of new residential development, with the potential for adverse effects on the landscape setting moderated, as required by the NPPF. The Site is considered to be of "low sensitivity" as it is of a low landscape value and the localised visual envelope of the Site, coupled with the surrounding land uses, lends itself to residential development. The Site makes a minimal contribution towards the 5No purposes of the Green Belt, making it suitable for release and able to contribute towards a suitable pattern of development for Shenfield.
iii) Drainage
6.12 A Flood Risk and Drainage Note has been prepared (JNP Group) (Appendix 05). This confirms the location of the majority of the Site within Flood Zone 1, where there is the lowest probability of flooding and where new development should be steered. A small part of the Site is located within Zones 2 and 3. Built development (housing, social infrastructure, etc.) will avoid Flood Risk areas.
6.13 All proposed buildings within "Officer's Meadows" are to be located in Flood Zone 1. Essential infrastructure which passes through a small area designated as Flood Zone 3 will be subject to the "Exception Test" and site-specific flood risk assessment to demonstrate safe access & egress from the site and that the development does not increase flood risk both on and off site. Safe access & egress will be provided off Chelmsford Road A1023 and Alexander Lane. Where affected, allowance for flood compensation storage will be provided to ensure no net loss in flood storage.
6.14 The critical drainage can be dealt with by the creation of surface water storage basins/wetland areas to attenuate and release the overland surface water flows form off site at a reduced rate. Development generated surface water flows can be dealt with via SuDS components and a storage basin/wetland attenuation area. The Site is therefore suitable and deliverable from a flood risk and drainage perspective.
iv) Noise
6.15 An assessment of "likely noise constraints" has been undertaken (Sharps Gayler) (Appendix 06) to identify potential constraints relating to noise and vibration upon Officer's Meadow. The below conclusion is based on a desktop assessment, informed by computer modelling of transportation noise sources in the area (A12, A1023 and the mainline railway).
6.16 Whilst there is a low to medium risk on the boundaries of the Site with Chelmsford Road and the rail line, the majority of the Site presents a low risk. At low noise levels, the Site is likely to be acceptable from a noise perspective, provided that a good acoustic design process is followed at the detailed application stage, particularly for development within 50m of Chelmsford Road and the rail line.
6.17 The assessment concluded that there are no significant constraints on Site in relation to noise. Land North of Shenfield is therefore suitable and deliverable from an acoustic perspective.
v) Ecology
6.18 An Ecological Appraisal has been undertaken (Aspect Ecology) (Appendix 07). This report confirms that the Site comprises a range of habitats including arable, woodland, grassland, watercourse, hedgerows, scrub and lines of trees. The woodland at the north-east of the Site, the watercourse and the hedgerows are of elevated ecological value and are considered to be important ecological features.
6.19 Protected species such as bats, badgers, dormice and reptiles have not been identified within the vicinity of the site at this stage. Although thought to have 'good' suitability for Great Crested Newt, a DNA survey (2015) found the pond nearest to the Site unlikely to support a Great Crested Newt population. A further Great Crested Newt presence/absence survey of all relevant ponds associated with the Site is to be undertaken in 2019.
6.20 The habitats at the Site are currently unmanaged from an ecology point of view and the development proposal presents the opportunity of securing suitable management practices, appropriate mitigation and 'net gains' in terms of biodiversity. When considering ecological constraints, the Site is therefore both suitable and deliverable, subject to further survey work.
vi) Heritage Assessment
6.21 A Desk-based Heritage Assessment (Albion Archaeology) accompanies these representations, which has also been informed by a preliminary walk-over of the Site. The accompanying report (Appendix 08) reviews the potential for below ground archaeological interest and potential impact arising from development on such features; as well as an assessment of any direct impact on potential heritage assets.
6.22 No heritage assets other than the crop mark of a bomb crater, have been recorded in the proposed development area. Other heritage assets comprise former buildings, the postulated course of a Roman road, find-spots and historic settlement cores, whose setting will not be impacted by the proposed development. The adjacent railway lines, roads, buildings and vegetation suggest that the proposed new buildings are unlikely to be visible from these heritage assets. The potential impact on the setting is therefore assessed as "no change". The significance of this impact is "insignificant".
6.23 The potential for archaeological remains has been assessed covering prehistoric to modern periods. In general terms the "significance" of any remains is low to moderate. Any potential impact of the new development on potential buried archaeological remains could be mitigated by measures to investigate and record the presence/absence of potential archaeological assets. Officer's Meadows is thereby deliverable from an archaeological perspective.
vii) Masterplan
6.24 The accompanying illustrative concept masterplan (BW Design) (Appendix 09) has been developed in response to the above technical information prepared for the Site.
6.25 This demonstrates the ability of the Site itself to deliver:
* Circa 510 homes ("Officer's Meadow" site) inc. affordable provision;
* The proposed dwellings can be delivered within the timescale of the housing trajectory, with varying densities;
* Other potential linkages to Chelmsford Road (A1023) and Alexander Lane;
* A 60-bed care home;
* A Local Centre/ community facility;
* Multi-functional green and blue infrastructure; and
* Sustainable transport links.
6.26 Moreover, the illustrative concept masterplan also demonstrates the delivery of:
* Significant areas of Public Open Space encompassing:
- Natural and Semi-Natural Green Spaces;
- Outdoor Sports Facilities; and
- Children's/Young People's Play Area.
* Primary School provision on the adjoining Shenfield High School.
6.27 The above provides an overview of the technical inputs to the Land North of Shenfield (Officer's Meadow) and which confirms that the Site and proposals for it are deliverable within the Local Plan context. The proposals for the Site form part of an iterative process and further information will come to light in advance of a planning application to ascertain the detailed parameters for the Site.
6.28 These matters will be "screened" for a full Environmental Impact Assessment for a subsequent planning application, and it is envisaged the EIA Screening will be submitted later in 2019.
7.0 SOUNDNESS OF OTHER LOCAL PLAN POLICIES
7.1 This section does not seek to comment on other specific allocations/sites. Instead it focuses on policies of relevance within the Local Plan and sets out our comments and recommendations on these in terms of the tests of soundness in the NPPF.
7.2 Policy SP01: Sustainable Development takes a positive approach towards "Presumption in Favour of Sustainable Development" and seeks to apply this in terms of planning applications, in accordance with the Development Plan. The NPPF (para 11) assumes a strong "Presumption in Favour of Sustainable Development" in all planning related matters and places a responsibility on LPAs to positively seek opportunities to meet the development needs of their area and to, as a minimum, provide for objectively assessed needs for housing and other uses. This policy is "consistent" with the NPPF and is therefore sound.
7.3 Policy SP02: Managing Growth seeks to support the delivery of homes by setting out provision for 7,752 new dwellings to be built over the Plan period 2016-2033, at an annual rate of 310 dwellings up to 2022/2023, followed by 584 dwellings from 2023/24-2033. This objective is not supported, as it is considered that this stepped trajectory which delivers a greater proportion of the required homes beyond 2023, could be reviewed to allow more housing to come forward from the period 2021 onwards. This is with particular reference to NPPF (para 23) which states that "strategic policies should provide a clear strategy for bringing sufficient land forward, and at a sufficient rate, to address objectively assessed needs". This policy is therefore "not consistent" with the NPPF and not sound.
7.4 We consider that in order to address this, the Council should review its housing trajectory and at the same time, clarify the new dwelling number ahead of the Local Plan submission, to align with the February 2019 agreed position on the 'baseline' for the standard method calculation.
7.5 The Council should, in addition, work with developers to bring applications forward in advance of the adoption of the Local Plan, to meet housing need.
7.6 Policy SP03: Health Impact Assessments (HIAs) states that Brentwood Borough Council is committed to ensuring all new developments promote healthier and inclusive environments. The majority of proposals will be required to assess their impacts on health and well-being upon the capacity of existing health care and social care services and facilities, the environmental impacts, and the promotion of health improvement activities, arising from the development. Developments of 50 or more units are required to submit a Health and Well-Being Impact Assessment, as required by the EPOA HIA Guidance Note.
7.7 This policy is considered to be unsound as it is not "justified". The requirement to undertake a Health Impact Assessment (HIA) is a superfluous burden on applicants. It should be down to the Local Plan to take into account wider health concerns in the local area and focus policies upon addressing these concerns. Health and well-being should be covered within the polices of the Local Plan and where a development aligns with these, an HIA should not be required.
7.8 Policy SPO4: Developer Contributions refers to the need for all new development to be supported by, and have good access to, all necessary infrastructure. Developers and land owners must work positively with the Council, neighbouring authorities and other infrastructure providers throughout the planning process to ensure that the cumulative impact of development is considered and then mitigated.
7.9 Applicants proposing new development will be expected to make direct provision or contribute towards the delivery of relevant infrastructure, as required by the development either alone or cumulatively with other developments. The Infrastructure Delivery Plan (IDP) identifies the types of infrastructure required to support the anticipated growth in the borough and includes a summary of the current identified infrastructure projects.
7.10 Policy SPO4 should be more explicit on the exact nature of requirements that the developer may be required to meet to avoid overly onerous requirements or confusion over cumulative impact and phasing with other developments and therefore this policy is not "justified" and is unsound.
7.11 Policy SP05: Construction Management states that all major development should sign up to the Considerate Constructors Scheme, or equivalent. Major development must consider the cumulative impacts of other major development occurring in the vicinity, to reduce the cumulative impacts.
7.12 It is considered that this policy accords with the NPPF and is therefore found to be sound, with particular reference to NPPF (para 72) which refers to larger scale development supported by the necessary infrastructure and facilities.
7.13 Policy SP06: Effective Delivery of Development states that proposals for large allocation sites will be expected to be developed in partnership with the Council, infrastructure providers and other relevant organisations, through a collaborative masterplanning approach. Development proposals should submit a supporting statement setting out the sustainable long-term governance and stewardship arrangements for community assets including land, services and facilities such as village halls, community centres, libraries, parks, green spaces, and buildings for sports, leisure, healthcare, education, social, arts and cultural activities. This policy is overly onerous and therefore "unjustified". This policy is therefore considered to be unsound.
7.14 Policy BE02: Sustainable Construction and Resource Efficiency requires all development proposals to maximise the principles of energy conservation and efficiency. Whilst the NPPF (para 153) has regard to the inclusion of renewable and decentralised energy as part of a new development, it states that such features are only required where it is either feasible or viable. This policy is therefore not "consistent" with National Policy.
7.15 We therefore object to the policy in its present form. In order to ensure consistency with National policy, criteria (f) of Policy BE02 should be revised to mirror the NPPF position. Therefore, it is considered that proposed Policy BE02 is unsound.
7.16 Policy BE03: Carbon Reduction, Renewable Energy and Water Efficiency states that proposals for renewable, low carbon or decentralised energy schemes will be supported, subject to adverse cumulative and visual impacts, which cannot be satisfactorily addressed. Criteria (b) of the proposed policy sets out the minimum standards of sustainable construction and carbon reduction. It is Government policy to seek to deliver improvements to emissions from buildings through the application of building regulations. It is therefore considered that the table provided in proposed Policy BE03 is not required, and therefore this policy is "unjustified" and unsound.
7.17 Policy BE04: Establishing Low Carbon and Renewable Energy Infrastructure Network sets out that developments will be required to provide for the necessary infrastructure to meet the needs of the development, specifically stand-alone renewable energy infrastructure. The policy advises that new development of over 500 units, or where the clustering of neighbouring sites totals over 500 units, will be expected to incorporate decentralised energy infrastructure.
7.18 The supporting text refers to the need for District heating networks and the identification of Strategic allocations in the Brentwood IDP, including the Officers Meadow's masterplan area, that could provide opportunities for DH and CHP schemes as energy solutions for new development.
7.19 This policy is considered overly onerous and "unjustified" in relation to the NPPF and therefore unsound.
7.20 In order to make the policy more effective, it could set out that the delivery of renewable energy infrastructure should be required based on evidence of need and viability and a "viability assessment" (at the time planning applications are submitted/determined) - as per Policy SP04.
7.21 Policy BE08: Sustainable Drainage seeks that all developments should incorporate appropriate Sustainable Drainage Systems (SuDs) for the disposal of surface water, in order to avoid any increase in flood risk or adverse impact on water quality. Larger sites over 1 hectare in Zone 1 must be accompanied by a Flood Risk Assessment. Water runoff will comply with the requirements of this policy by provision of SuDS in the surface water drainage strategy. The NPPF (para 163) refers to the need for local planning authorities to ensure that flood risk is not increased elsewhere. Where appropriate, applications should be supported by a site-specific flood-risk assessment. This aspect of the policy is therefore considered "consistent" with the NPPF.
7.22 Given the extensive nature of the development, opportunities exist to incorporate the above the SuDs management across the site both locally and site-wide. However, the requirement for prevention if run-off for all rainfall events up to 5mm is in excess of the SuDS manual and is therefore "unjustified". Unfortunately, this therefore renders the overall Policy BE08 to be unsound.
7.23 Policy BE10: Connecting new developments to digital infrastructure seeks to support Brentwood's economic growth and productivity by improving the offer of digital infrastructure available within the Borough. Whilst planning strives to achieve the highest possible standards of construction and performance for new dwellings, Council's should not seek higher standards than Building Regulations on any other technical standards. Proposed Policy BE10 is therefore "unjustified" in light of National policy and therefore unsound.
7.24 Policy BE11: Strategic Transport Infrastructure requires that development in proximity of the railway stations demonstrate how the scheme connects the surrounding walking, cycling and public transport links to the station, linking new developments with the fast high-capacity transport links into London from Shenfield and the improved linkages from the Elizabeth line. Development close to schools and early years childcare facilities should facilitate an attractive public realm that is safe for children and encourages walking and cycling to address the impacts of school run traffic, in line with ECC's Developers' Guide to Infrastructure Contributions. This aligns with the NPPF (section 9) on "Promoting Sustainable Transport". These considerations therefore appear to be "justified", in accordance with national planning policy and therefore the policy is sound.
7.25 Policy BE13: Sustainable Means of Travel and Walkable Streets and Policy BE16: Mitigating the Transport Impacts of Development refers to sustainable modes of transport that should be facilitated through new developments, promoting accessibility and integration into the wider community and existing networks. Any development requiring a new road or road access, walking and cycling facilities and public transport, will be required to have regard to the adopted ECC's Development Management Policies or successor documents.
7.26 The policies seek to secure developments that are, inter-alia, designed to make necessary contributions to the improvement of existing infrastructure and provision of new infrastructure; be consistent and contribute to the implementation of the Essex County Council's Development Management Policies and include Transport Assessments and Travel Plans. This aligns with the NPPF (section 9) "Promoting Sustainable Transport" and is therefore considered "justified" and sound.
7.27 Policy BE17: Parking Standards refers to the vehicle parking requirement set out in the most up-to-date Essex Parking Standards. The NPPF (para 105) states that when setting local parking standards policies should take into account: a) the accessibility of development b) the type, mix and use of development c) the availability of and opportunities for public transport d) local car ownership levels and e) the need to ensure an adequate provision of spaces for charging plug-in and ultra-low emission vehicles. This aligns with the flexibility allowed for in Policy BE17, whereby the imposed parking standards are subject to the site's ability to minimise pressure on land and encourage the use of alternative modes of transport.
7.28 However, Policy BE12 also deals with "parking matters", but is not aligned with Policy BE17. This adds further inconsistency, in addition to Policy BE17 itself being "inconsistent" with the NPPF. It is therefore presently unsound.
7.29 Policy BE18: Green and Blue Infrastructure requires that Brentwood's existing ecological networks, open spaces, and green/blue features within the built environment are protected, planned, enhanced and managed as a part of the Borough's wider network of green and blue infrastructure. Points A-I of Policy BE18 identify the measures by which development proposals can maximise opportunities to protect and enhance green and blue infrastructure, aligning with the NPPF (section 15) "Conserving and Enhancing the Natural Environment".
7.30 However, it is presently unclear how any net gains/losses and any associated requirements would be measured/calculated, or the mechanism by which the Council or developer would deliver this. This is therefore both "unjustified" and "inconsistent", and therefore unsound.
7.31 Our Client largely supports the principle of Policy BE18, but it also unfortunately includes the requirement for a developer to ensure there is sufficient foul capacity within the local network before a development commences. Whilst our Client would liaise with Anglican Water, it is ultimately the Water Authority's responsibility to ensure sufficient capacity. Therefore as presently worded, the policy is "unjustified" and is unsound.
7.32 Policy BE19: Access to Nature seeks that major developers provide direct access to nature and that this provision is protected, planned, designed and managed as an integrated feature of the landscape. Developments in areas that are more than 1km walking distance from an accessible green open space should also seek opportunities to improve resident's experience and interaction with nature by means of design. The NPPF (section 8) "Promoting Healthy and Safe Communities" states that planning policies should be based on robust and up-to-date assessments of the need for open space, this policy is therefore deemed to be "consistent" with the NPPF and sound.
7.33 Policy BE22: Open Space in New Development seeks that major developments provide functional on-site open space and/or recreational amenities, in accordance with standards set out in the Council's Open Space Standards (see Figure 5.4 Open Space Standards and Fig 5.5 Fields in Trust Children's Play Space Standards in the Reg 19 Local Plan). Maintenance Plans should be submitted at planning application stage for all new facilities provided for exercise or recreation purposes.
7.34 The Council's Open Space Standards seek proposals which meet the Fields in Trust (Guidance for Outdoor Play Space: Beyond the Six Acre Standard) minimum standards. The FiT standards relate to provision on the basis of hectares per 1,000 population generated. The Council's Open Space Standards are considered to be effective as they are based on FiT standards and are therefore "justified" and the policy is sound.
7.35 Policy BE23: Open Space, Sport and Recreational Facilities states that permissions will not be granted for the development of designated Protected Urban Open Space or Local Green Space unless it can be demonstrated that alternative and improved provision can be created, existing open space enhanced or no additional displacement within the Green Belt caused. As with Policy BE22, where appropriate all proposals will be required to comply with the Council's Open Space Standards which aim to meet those set out by FiT. It is therefore considered that policy BE22 is "justified" in line with national guidance and therefore sound.
7.36 Policy HP01: Housing Mix sets out that all new development should deliver an inclusive and accessible environment throughout. On development sites of 500 or more units, the Council will require an appropriate mix of dwelling types, sizes and tenures to meet the identified housing needs in the borough as set out in the Strategic Housing Market Assessment (SHMA). Each dwelling is to be constructed to meet requirement M4(2) accessible and adaptable dwellings, unless built in line with M4(3) wheelchair adaptable dwellings. A minimum of 5% self-build homes is to be provided, which can include custom housebuilding and provision for Specialist Accommodation, taking account of local housing need in accordance with the criteria set out in Policy HP04 Specialist Accommodation. Where a development site has been divided into parts, or is being delivered in phases, the area to be used for determining whether this policy applies will be the whole original site.
7.37 The objective of securing accessible and adaptable homes is supported, however, it is unclear as to how the "each dwelling to be constructed to meet requirement M4(2) accessible and adaptable dwellings, unless it is built in line with M4(3) wheelchair adaptable dwellings" is a fair and reasonable request.
7.38 The supporting text refers to DCLG research which shows that, based on English Partnerships figures from 2011-2012, nearly 30% of households have at least one person with a long-term illness and over 3% have one or more wheelchair user. While nationally 3.3% of households have a wheelchair user, for households living in affordable housing this rises to 7.1%. The rates are also higher for older households and, given that the number of older person households in the borough is set to increase over the period to 2033, the Council seeks to ensure 5% of affordable housing development on proposals of 60 or more dwellings archives requirement M4(3) wheelchair accessible dwellings.
7.39 This need for "all developments" to meet this target is not set out in the evidence or in the NPPG (referred to in the supporting text) and is therefore "unjustified" and unsound.
7.40 Policy HP03: Residential Density sets out that residential development proposals will generally be expected to achieve a net density of at least 35 dwellings per hectare net or higher. Proposals for new residential development should take a design-led approach to density which ensures schemes are sympathetic to local character and make efficient use of land. Proposals for housing developments should "Make an Effective Use of Land" in line with NPPF (Section 11). This policy is therefore "consistent" with the NPPF and sound, but must provide for a degree of flexibility to allow for local circumstances.
7.41 Policy HPO4: Specialist Accommodation the Council encourages and supports proposals which contribute to the delivery of Specialist Accommodation, as referenced in the Land North of Shenfield Site allocation "other types of specialist housing (to be provided) in accordance with the Council's policy requirements". This form of accommodation includes, but is not limited to, housing for older people such as Independent Living schemes for the frail elderly.
7.42 The Council's SHMA indicates that, if occupation patterns of Specialist Residential Accommodation for older people remain at current levels, there will be a requirement for 494 additional specialist units to 2033, aligning with the requirement in the Land North of Shenfield site allocation for provision of a residential care home (a 60-bed scheme as part of the overall allocation). This policy is also "consistent" with the NPPF section 5 (para 64 b) and is therefore considered to be sound.
7.43 Policy HPO5: Affordable Housing seeks to provide a portion of affordable housing on residential developments of 11 dwellings or more or on those which have a combined gross floorspace of greater than 1,000 sq. m (gross internal area).
7.44 The affordable housing requirement relates to 35% provision in all areas of the Borough. The Council requires that the tenure split be made up of 86% Affordable/Social Rent and 14% as other forms of affordable housing (this includes starter homes, intermediate homes and shared ownership and all other forms of affordable housing as described by national guidance or legislation) or regard to the most up to date SHMA. The affordable housing is to be designed in such a way as to be seamlessly integrated to that of market housing elements of a scheme and distributed throughout the development, so as to avoid the over concentration in one area.
7.45 Viability is referred to, but the policy does not go far enough. We would recommend that the policy includes a clause which requires a viability assessment to be submitted and considered whereby schemes are unable to meet the full affordable provision, which is not included at present. The policy is therefore "unjustified" and unsound.
7.46 Policy HP06: Standards for New Housing requires that all major residential developments meet the Government's nationally described space standard. It is considered that the standard is an appropriate tool to use when considering the provision of good housing. However, this should not be limited to major development, but should instead extend to all emerging residential development, whilst allowing for the consideration of local circumstances and site-specific conditions, in order to accord the NPPF (Section 12, Achieving Well-Designed Places). The policy is therefore "unjustified" in relation to need and viability (our emphasis) in accordance with the NPPF. The adoption of nationally described space standards is also at the discretion of the LPA and should be decided upon in a local context. The policy is therefore considered unsound.
7.47 Policy HP12: Planning for Inclusive Communities refers to the need to plan for and build inclusive environments that support communities. Proposals should provide access to good quality community spaces, services and infrastructure, encouraging social interaction, ensuring inclusivity and promoting safety. The policy is deemed "consistent" with NPPF (section 8) "Promoting Healthy and Safe Communities" which states that planning policies should aim to achieve healthy, inclusive and safe places which promote social interaction, are safe and accessible, and support healthy lifestyles. The policy is therefore considered sound.
7.48 Policy HP13: Creating Successful Places seeks that proposals meet high design standards, in order to deliver safe, inclusive, attractive and accessible places. Elements A-M of policy HP13 identify measures considered to create successful places, in accordance with section 12 of the NPPF on "Achieving Well-Designed Places". The NPPF (para 128) states that design quality should be considered throughout the evolution and assessment of individual proposals. Policy HP13 is therefore considered to be "consistent" with the NPPF and sound.
7.49 Policy HP16: Buildings Design seeks for development to be well designed and of a high quality, having regard to Development Management criteria including scale, density, layout, siting, character and appearance. This policy is considered to be "consistent" with the NPPF having particular regard to Section 12 on "Achieving Well-Designed Places" and therefore sound.
7.50 Policy PC02: Job Growth and Employment Land seeks that provision is made for 5,000 additional jobs in the Borough over the Plan period at a rate of 250 per year. NPPF Section 6 on "Building a Strong, Competitive Economy" sets out that planning policies should support economic growth, in order to create jobs and prosperity by taking a positive approach to sustainable new development. The strategic allocation at Land North of Shenfield supports economic growth and creates new opportunities and is "consistent" with national guidance and is sound.
7.51 Policy PC03: Employment Land Allocations highlights areas allocated by the Council for general employment and office development. Para 82 of the NPPF states that planning policies should recognise and address the specific locational requirements of different employment sectors. The allocations set out in policy PC03 are informed by the wider spatial strategy, which aims to retain the Borough's character and encourage employment growth in suitable locations, in accordance with national planning policy. This policy is therefore deemed to be "consistent" with the NPPF and considered to be sound.
7.52 Policies NE01: Protecting and Enhancing the Natural Environment (inc SSSIs) and NE03: Trees, Woodland, Hedgerows (inc Local Wildlife Site, Local Nature Reserves) work to restrict development that would have a detrimental effect on, or result in the loss of, significant landscape heritage or a feature of ecological importance.
7.53 Our Client wholly supports the principles of both of these policies, albeit as presently worded, they both contain contradictory requirements: Policy NE01 (para B) states that proposals that lead to deterioration or loss of the Borough's designated and non-designated biodiversity assets will not be permitted; whereas Policy NE01 (para C) goes on to state that where adverse impacts are unavoidable they must be adequately and proportionally mitigated (ie it appears to allow for deterioration where they are unavoidable and can be suitably mitigated).
7.54 Policy NE03 (para A) contains a similar contradictory approach to the provisions of the remainder of the policy - as with Policy NE01.
7.55 In the light of this both Policy NE01 and Policy NE03 are not inconsistent with each other, they are also "inconsistent" with National policy, "unjustified" and therefore unsound.
7.56 Policy NE05: Air Quality seeks to restrict development, which would directly or indirectly, impact air quality within the Borough. Measures to offset or mitigate those impacts are introduced as part of proposals to ensure that receptors would not be subject to unacceptable risk as a result of poor air quality. This policy is "consistent" with the objectives of the NPPF (para 181) and is therefore considered sound.
7.57 Policy NE06: Flood Risk requires that development avoid flood risk to people and property, managing any residual risk and taking account of the impacts of climate change. Developments should be located in areas with the lowest probability of flooding (Flood Zones 1 & 2). Where development is located within Flood Zone 3, the Exception Test will apply.
7.58 The NPPF (section 14) "Meeting the Challenge of Climate Change, Flooding and Coastal Change" states that inappropriate development in areas at risk of flooding should be avoided by directing development away from the areas at the highest risk. The majority of Policy NE06 therefore aligns with National guidance and therefore mostly sound. However, and as presently worded, it suggests tat applicants may be obligated to set aside land to provide flood management to benefit areas outside of that development. This is unduly onerous, inconsistent with National policy and therefore unsound.
7.59 Similarly, the entirety of a development area does not need to remain operational at times of flood (such as access roads), if there is an alternative safe means of escape that is provided. Subsection c) of Policy NE06 is therefore not justified and also unsound.
7.60 Policy NE09: Green Belt seeks that the Metropolitan Green Belt within Brentwood Borough will be preserved from inappropriate development so that it continues to main openness and serve key functions. Policy NE09 states that all development proposals within the Green Belt will be considered in accordance with the provisions of section 13 of the NPPF on "Protecting Green Belt Land". It is therefore considered that policy NE09 is "justified" and sound, in the light of national policy.
7.61 Policy NE13: Site Allocations in the Green Belt states that sites allocated to meet housing need, within the Green Belt, will be expected to provide significant community benefits. These are the "exceptional circumstances" for sites to be removed from the Green Belt to allow development to take place, providing new defensible boundaries and protecting the open countryside. The NPPF (para 138) states that, where it has been concluded necessary to release Green Belt land for development, plans should give first consideration to land which has been previously-developed and/or is well-served by public transport.
7.62 The allocated "Officer's Meadow" site provides opportunities for sustainable development and transport modes to be maximised, with its close proximity to Shenfield railway station, in accordance with National policy, leading to the consideration of Policy NE13 as "consistent" with the NPPF and sound.
7.63 The overall approach within the Development Management related policies is supported, however amendments to policy/Appendices of Local Plan is recommended in places as set out above. This would ensure robustness in terms of delivering a sound Local Plan that is positively prepared, justified, effective and consistent with national planning policy.
8.0 CONCLUSION
8.1 The Regulation 19 "Pre-Submission Local Plan" consultation document is supported. These representations fully support the allocation of Land North of Shenfield, which includes our Client's land at "Officer's Meadow". These representations focus mostly on land within our Client's control and are supported by a series of accompanying technical reports that support the proposed allocation.
8.2 Our Client supports the wider and comprehensive development of Policy RO3: Land North of Shenfield, which could ultimately for circa 825 dwellings (inc affordable provision).
8.3 Specifically, the land controlled by our Client represents the largest area of land within Policy RO3 and is largely supportive of the policy requirements set out in the Local Plan. Our Client is keen to work closely with the Borough Council and adjoining landowners to provide a comprehensive approach to development, and our Client's elements would comprise:
* Circa 510 dwellings (inc. Affordable provision)
* A new Local Centre, inc. potential healthcare;
* A 60-bed care home
* Significant areas of "Green" and "Blue" Infrastructure;
* Other community facilities, inc. sports provision.
8.4 These representations have also set out our Client's support of working closely with the adjoining Shenfield High School to provide for enhanced educational facilities. This would be in the form of funding towards on-site Primary provision to help create a "through-school", plus financial contributions to existing secondary provision (if required).
8.5 We would welcome the opportunity of discussing our concerns, with suggested amendments with BBC and ECC Officers at the earliest opportunity.
8.6 Subject to a number of modifications as recommended in this report, we consider the Local Plan to be largely sound in accordance with the NPPF.

Attachments:

Object

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

Representation ID: 24141

Received: 19/03/2019

Respondent: Wiggins Gee Homes Ltd

Agent: David Russell Associates

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:


R03 is one of the Pre-Submission Document's strategic allocations. Much of this allocation seems sensible and logical. It is bounded to the north-west by the A12 and south-east by the main railway line. As with Policy R16 and R17, R03 says new development should consider providing for:
"appropriate landscaping and buffers along sensitive boundary adjoining the A12."
As with Policy R16 and R17, Policy R03 should be more strongly worded to insist on appropriate mitigation measures.
Two parts of the allocation which should be removed and left in the Green Belt. The first is the elliptical shaped piece of land between the A1023 Chelmsford Road and the A12 Marylands Interchange, unless it is specifically reserved for the employment uses mentioned in Policy R03, the second is an area to the north of the site bounded by the Marylands Interchange to the north, the railway line to the south-east, a part of Arnold's Wood to the south-west and Chelmsford Road to the north-west. They would provide poor and unhealthy environment, being close to the interchange and main railway. Residential development this close to Arnolds Wood can only be detrimental. R03, R16, R17, R21, R22 allocations are all bounded by the A12 to a greater or lesser extent. As noted in our representations on Policy NE05, the Pre-Submission Document's paragraph 8.50 states that transport generated emissions are the prime source of air pollution in the Borough. We have consistently questioned the wisdom of locating new housing next to the A12 on the grounds of public health. All these proposed allocations, in whole or part, have significant issues resulting from their proximity to principal sources of air and noise pollution. There is conflict with the Pre-Submission Document's own policies on these issues, including Policy NE05. Consequently we are suggesting a number of modifications to the relevant policies.

Change suggested by respondent:

We propose the following modifications for the reasons outlined in our response to the Local Plan consultation. Strengthen the wording of all policies to ensure that appropriate air and noise pollution measures form an integral part of any development proposals. Wherever there is reference to either the A12, or the mainline railway, the related criterion should read as follows:
"appropriate measures, including barriers, embankments and landscaping, to reduce air and noise must be provided along the site's boundary(ies) with the A12 and/or the mainline railway."
Removal of R17 from Policy R16 and R17.
Removal from proposed allocation R03 of the elliptical shaped piece of land between the A1023 Chelmsford Road and the A12 Marylands Interchange, and the area to the north of the site bounded by the Marylands Interchange to the north, the railway line to the south-east, a part of Arnold's Wood to the south-west and Chelmsford Road to the north-west.
Removal of Allocation R21 on grounds of poor physical environment, isolation from the main settlement of Ingatestone and coalescence with the village of Mountnessing.
Removal of Allocation R22 on grounds of poor physical environment.

Full text:

We have grouped these polices together since our comments relate to their common characteristics. The most important is that these allocations are all bounded by the A12 to a greater or lesser extent. As noted in our representations on Policy NE05, the Pre-Submission Document's paragraph 8.50 states that transport generated emissions are the prime source of air pollution in the Borough. We have consistently questioned the wisdom of locating new housing next to the A12 on the grounds of public health.
Policy R16 and R17 refers to two parcels of land on either side of the A12, currently designated as Green Belt. The Policy says that new development on this land should consider, amongst other things, providing for:
"... appropriate landscaping and buffers along sensitive boundary adjoining the A12."
R17 is a relatively narrow strip of land on the southern side of the A12. It is currently a relatively wooded area at around the same level as the A12. Any landscaping here would be confined by the narrowness of the site and ineffective as a barrier against air and noise pollution. This should be removed from the allocation and designated instead as open space.
R16 is a larger and better configured space and we agree that a degree of development here could be achieved in an acceptable environment, provided there are strong and effective measures to reduce air and noise pollution from the A12. Again, the land is on much the same level as the A12. Clearly, the further any development is located away from the A12 then the less the risk of pollution measures to mitigate.
Policy R16 and R17 is weakly worded on the need for appropriate mitigating measures. It should state that any new development will provide effective measures along boundaries with the A12 and elsewhere. We note that the Policy also includes requirements for public open space and provision of pedestrian and cycling connections. Again, the Policy should insist on these provision and not simply ask potential developers to "consider" them.
Effective noise and pollution barriers do not look aesthetically pleasing. Adequate space will be needed for landscaping to mitigate their visual impact.
R03 is one of the Pre-Submission Document's strategic allocations. Much of this allocation seems sensible and logical. It is bounded to the north-west by the A12 and south-east by the main railway line. As with Policy R16 and R17, R03 says new development should consider providing for:
"... appropriate landscaping and buffers along sensitive boundary adjoining the A12."
As with Policy R16 and R17, Policy R03 should be more strongly worded to insist on appropriate mitigation measures. There are two parts of the allocation which should be removed and left in the Green Belt. The first is the elliptical shaped piece of land between the A1023 Chelmsford Road and the A12 Marylands Interchange, unless it is specifically reserved for the employment uses mentioned in Policy R03 at A.e.:
"... provision of 2ha of land for employment purposes."
The Marylands Interchange is elevated at this point and would result in a poor residential environment.
The second is an area to the north of the site bounded by the Marylands Interchange to the north, the railway line to the south-east, a part of Arnold's Wood to the south-west and Chelmsford Road to the north-west. This site would also provide a poor and unhealthy environment for new homes as a consequence of its proximity to both the interchange and the mainline railway. Regardless of any mitigation measures, residential development this close to Arnold's Wood, already bisected by the railway line, can only be detrimental to its wildlife value.
R21 and R22 are both proposed allocations for Ingatestone. R21 is a relatively narrow triangular site lying between the mainline railway and the A12. Previously described as land adjacent to the garden centre, we now note that the proposed allocation includes the garden centre. The site is at a level with the A12 and the railway, with consequent air and noise pollution issues. The allocation's extension northwards to the rear of homes in Burnthouse Lane means that it will form a long, southern extension to Ingatestone. It will consolidate coalescence with Mountnessing, which lies to the west of the site on the other side of the A12. In our representations on 2018' s Preferred Sites Consultation, we said:
"This narrowing site, wedged between the A12 and the main railway line is completely unrelated to any existing residential area. The area would suffer from social isolation as well as air and noise pollution. Although the Ingatestone Nursery site would help to form a bridge with the rest of the village, it is our opinion that this site would retain significant disadvantages, and is not a sustainable location in either social or environmental terms."
We think this assessment remains true, even though the nursery now forms part of the allocation.
R22 - we still think it extraordinary to propose this allocation as a satisfactory environment for new homes. There are houses immediately to the south-west along Roman Road, but their presence should not be seen as a justification. The site is at a level with the A12, with the B1002 on the site's northern boundary elevated to cross the A12. We said in our response to 2018's Preferred Sites Consultation that no further consideration should be given to this site and nothing in the Pre-Submission Document has changed our views on this.
Our main point here is that all these proposed allocations, in whole or part, have significant issues resulting from their proximity to principal sources of air and noise pollution. There is conflict with the Pre-Submission Document's own policies on these issues, including Policy NE05. Consequently we are suggesting a number of modifications to the relevant policies.

Attachments:

Object

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

Representation ID: 25796

Received: 19/03/2019

Respondent: Mr John Walker

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

The local plan is unsound with respect to R03 Land north of Shenfield. This lane is green belt and should not be considered for housing as there area areas of brownfield sites within the borough.
In proposing to build 800 houses in this location will create a number of problems on the surrounding areas.
With newly completed Mountnessing estate, the proposed development of the Ingatestone Garden centre site - an additional 2000 vehicles could be using the local roads with journeys to and from Shenfield railway station.
The Chelmsford main road is often congested with the no of vehicles using the road during peak rush hour and on the numerous occasions when the A12 has problems. This can increase traffic using the Shenfield Park estate to find alternative roads into Brentwood or to Shenfield railway station. This already adds to the poor air quality and atmosphere with the CO2 emissions under the railway bridges.
With this additional traffic on the Chelmsford road, this can cause further problems with burst water mains and may effect the aging water, gas and sewage systems.
With this development a new primary school is planned, but I believe there is no provision for a new doctors surgery. At present the waiting time for appointments the Shenfield surgeries is long and frustrating.

Change suggested by respondent:

Consideration should be given to development of smaller sites with reduced number of homes in each location. Maximum use of Brownfield sites within the borough. Change of use for existing vacant retail properties to housing of flats. Consideration for further housing on the William Hunter Way site.

Full text:

Site R03 - Land North of Shenfield
The local plan is unsound with respect to R03 Land north of Shenfield. This lane is green belt and should not be considered for housing as there area areas of brownfield sites within the borough.
In proposing to build 800 houses in this location will create a number of problems on the surrounding areas.
With newly completed Mountnessing estate, the proposed development of the Ingatestone Garden centre site - an additional 2000 vehicles could be using the local roads with journeys to and from Shenfield railway station.
The Chelmsford main road is often congested with the no of vehicles using the road during peak rush hour and on the numerous occasions when the A12 has problems. This can increase traffic using the Shenfield Park estate to find alternative roads into Brentwood or to Shenfield railway station. This already adds to the poor air quality and atmosphere with the CO2 emissions under the railway bridges.
With this additional traffic on the Chelmsford road, this can cause further problems with burst water mains and may effect the aging water, gas and sewage systems.
With this development a new primary school is planned, but I believe there is no provision for a new doctors surgery. At present the waiting time for appointments the Shenfield surgeries is long and frustrating.
Consideration should be given to development of smaller sites with reduced number of homes in each location. Maximum use of Brownfield sites within the borough. Change of use for existing vacant retail properties to housing of flats. Consideration for further housing on the William Hunter Way site.

Attachments:

Object

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

Representation ID: 25797

Received: 19/03/2019

Respondent: Mrs Susan Walker

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Object as the site is Green Belt, it will cause congestion, road safety issues, air quality problems, parking problems, loss of green space, pressure on sewerage and water supply Whilst proposing a new school it isn't proposing more GP facilities. With libraries closing and pressure on other facilities there will be a lack of facilities for new residents. The developer has too much say in the sort of housing that is built rather than the council.

Change suggested by respondent:

Remove site R03 from plan

Full text:

R03 Land north of Shenfield
The local plan is unsound with regard to this site for a number of reasons. Firstly this is green belt land and as such should not be considered as part of the local plan. Brownfield sites should be developed for housing first. To build 800+ new homes on what are currently open green fields will make the traffic situation in Shenfield and particularly the Chelmsford Road untenable. This would mean up to an additional 1600 vehicles added to the local existing road users creating further congestion on Shenfield Broadway and the station approach. The Chelmsford Road always has a queue of traffic during the working week which is particularly bad during peak hours. It would not be possible for the additional number of vehicles joining this road from this site to be absorbed. When the A12 is blocked (which frequently happens) the tail back can be considerable with this number of vehicles, all with their engines running, CO2 emissions wil increase by a very large amount.
Under station bridges at Shenfield Station is a prime example of somewhere the exhaust fumes build up at present and where the standard of air quality is often poor. On occasions Shenfield comes to a standstill or has extremely slow moving or stationary traffic, now without the additional planned houses. With the advent of Crossrail and very little parking provision for the anticipated increase in cars coming to the station more congestion must be the inevitable outcome without these houses being built. Compounded with the pressure of the other sites planned locally the building of such a large number of dwellings will have a detrimental effect on the local area and result in the loss of much of the green space which makes Shenfield a pleasant place to live to say nothing of it being joined to Mountnessing. A considerable number of new houses have just been completed on the Mountnessing roundabout site also leading to more local traffic congestion.
Houses on the Chelmsford Road have difficulty in coming out from their drives onto the road at present and roads onto the sites will become a line of cars waiting to pull out again with a negative effect on air quality. Another problem is with the drainage system in the Chelmsford Road which has frequently resulted in burst water mains again causing traffic tailbacks. It would also put additional pressure on the current sewage system and water supply.
I understand that a new primary school is planned to be built but not provision has been made for a new doctors surgery. The wait for appointments now is excessive. The pressure to close the local library service and the proposed increase in population means a distinct lack of amenities in the area if building on this site goes ahead.
I feel the developer have too much to say in the sort of housing that is built rather than the local Council who have a much better idea of what should be built.

Attachments: