POLICY HP18: DESIGNING LANDSCAPE AND THE PUBLIC REALM

Showing comments and forms 1 to 4 of 4

Object

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

Representation ID: 22314

Received: 16/03/2019

Respondent: Essex Bridleways Association

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

Policy HP18 and para 6.112: no mention has been made to ensure accessibility for all throughout new developments, and paragraph 6.112 mentions joining up landscape features and open spaces to 'create coherent linked landscape networks' but again, pedestrians and cyclists are the only user groups mentioned.

Change suggested by respondent:

To make this Plan sound, we suggest that access for equestrians is incorporated into this policy and confirmed in the reasoned justification.

Full text:

Policy HP18 and para 6.112: no mention has been made to ensure accessibility for all throughout new developments, and paragraph 6.112 mentions joining up landscape features and open spaces to 'create coherent linked landscape networks' but again, pedestrians and cyclists are the only user groups mentioned.

Support

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

Representation ID: 23982

Received: 19/03/2019

Respondent: Bellway Homes and Crest Nicholson

Agent: AECOM

Representation Summary:

Policy HP18: Designing Landscape and the Public Realm, in combination with Policy R01(I) clause C, provide an adequate policy framework for guiding a future landscape scheme - including the provision of green infrastructure between R01 and the development of the West of Basildon.

Full text:

Bellway Homes and Crest Nicholson representations Brentwood Regulation 19 Pre-Submission Local Plan (February 2019)
Merits of our client's landholdings and the Dunton Hills Garden Village
Bellway Homes and Crest Nicholson's landholdings (part of allocation R01) are unconstrained, suitable, deliverable and available. As such the landholding can be brought forward as part of the wider Dunton Hills Garden Village allocation.
Our clients are housebuilders, not land promoters, and are seeking delivery at the earliest opportunity pending suitable access. Crest Nicholson and Bellway Homes will continue to work with officers and Councillors (and other landowners/developers) to help bring forward this key site for meeting local housing needs in South Essex. It is absolutely right that the allocation should not be anchored to the work that will be carried out as part of the Association of South Essex Local Authorities (ASELA) and the emerging Joint Strategic Plan (JSP).
The identification of strategic scale sites to meet Brentwood's housing needs is supported, as is the principle of a new settlement via the Dunton Hills Garden Village Strategic Allocation (Policy R01) and its ambition for the delivery of additional homes beyond the plan period. The allocation represents an efficient use of greenfield land adjudged to be sustainable. Similarly we commend the Council for taking the decision to bring forward strategic greenbelt release alongside a comprehensively planned new settlement.
Our clients would support improved integration with Basildon alongside a landscape solution/approach agreed via a Statement of Common Ground and complementary policy positions (and/or supporting text) in both the Brentwood and Basildon Local Plans. This would help to deliver Dunton Hills Garden Village and the future expansion of West Basildon whilst maintaining separation physically through the provision of publicly accessible green infrastructure and improving connectivity for new and existing residents. Our clients do not support the position taken by Basildon Borough Council and have submitted representations objecting to the draft Basildon Local Plan.
Policy SP02: Managing Growth
Paragraphs 4.11 - 4.21 of the draft plan set out Brentwood's housing need position based upon the application of the standard methodology for calculating a minimum Local Housing Need figure; and the identification of a 20% buffer of housing sites for the first five years of the plan. The plan, at paragraph 1.38, also states that:
"..it may be necessary to review the Brentwood Local Plan, at least in parts, to ensure any opportunities for further growth and infrastructure provision in the Borough identified in the Joint Strategic Plan can be realised."
Our clients support this approach. Brentwood is seeking to meet their identified housing needs in full plus a sufficient buffer in the early part of the plan period. Crucially the draft plan is not using the JSP as a reason for deferring difficult planning decisions. As such, the draft plan is not reliant upon the emerging JSP to meet Brentwood's needs up to 2033. There has been no consultation to date on the JSP (as at March 2019) and it would be wholly unsound to rely upon a future JSP to meet identified needs up to 2033. Our clients support the pragmatic approach set out by Brentwood which is in accordance with the National Planning Policy Framework (paragraphs 11, 16 and 26 - a 'positively' prepared plan that seeks 'opportunities to meet the development needs' of their area and is 'sufficiently flexible to adapt to rapid change').
Our clients would advocate delaying submission of the publication plan until the 2018 affordability ratio data is released by the Office for National Statistics (the data used in the standard methodology for calculating housing need), due for publication in March/April 2019. This would allow time for factual updates to be made to Policy SP02 and housing target. Should submission come before the publication of the affordability ratio data, Brentwood should consider over allocating sites to increase the buffer of sites over for the whole plan period - sufficient to provide flexibility in respect of any increases brought about by the new affordability data published prior to or shortly after submission.
aecom.com
7/14
The recent release of the Housing Delivery Test (HDT) in February 2019 confirmed that Brentwood and all the other ASELA authorities (with the exception of Thurrock) have to identify a 20% buffer to their five year housing land supply and prepare a HDT Action Plan by August 2019. The minimum Local Housing Need figure (produced by the new standard methodology) will be applied to all authorities from 2018/19 for the purposes of the HDT (unless there is a plan that is less than 5 years old). As such Brentwood (and Basildon) will both be subject to HDT assessment on the basis of the minimum Local Housing Need figures until such time that their plans are adopted.
Table 1 (below) shows the HDT results published by MHCLG (19th February 2019) for all Councils that make up the ASELA. This shows housing delivery has only been achieved in one of the past three monitoring years (2016/17) for Basildon and it was never achieved by Brentwood. The HDT results evidence a persistent under delivery of housing in the South Essex region. Brentwood and Basildon are at risk of failing the HDT thresholds in 2019 and 2020. At present, Brentwood is in danger of falling below the 45% threshold this November 2019. This would leave the authority open to the presumption in favour of sustainable development (the 'tilted balance') and susceptible to speculative applications outside of the identified draft allocations. For Basildon there is a real risk that they will also be captured by the presumption in favour of sustainable development (75% threshold) as early as November 2020. Basildon's position is even more precarious given that they have not identified sufficient land to meet their minimum Local Housing Need, let alone a 20% buffer for the first five years, in their previous consultation draft plan.
Table 1 South Essex HDT results (MHCLG, February 2019)
[see attachment]
This illustrates the severity of the housing crisis in South Essex and the pressing requirement for all ASELA authorities to identify sufficient land supply (to meet their needs and a 20% buffer for the first five years) and maintain the plan-led approach. Basildon's failure to allocate sufficient sites to meet housing needs will impact the other ASELA partners (e.g. increased unmet needs in the region).
Duty to Cooperate
The above issues should be addressed as a matter of urgency through Brentwood and Basildon's Duty to Cooperate Statements of Common Ground. A Duty to Cooperate position statement is welcome, although the MOU with the ASELA is insufficient to evidence the detailed Duty to Cooperate matters that need to be addressed with Basildon. A Statement of Common Ground that outlines areas of uncommon ground would be just as valuable in advance of submission of both plans and the forthcoming examinations.
This will help to avoid creating inconsistencies or prejudice any future plan making as part of the ASLEA JSP. If Basildon and Brentwood both wish to avoid the appearance of sprawl along the A127, this can be achieved through a simple Statement of Common Ground and via identical high-level policies (or supporting guidance) in each Local Plan. At present the current policy position does not ensure an integrated approach to delivery of the Garden Village and adjacent sites to the West of Basildon. It is our client's view that a failure to tackle this issue head-on now could stall delivery on Dunton Hills Garden Village. The JSP is not the appropriate vehicle for resolving a planning issue within the emerging Basildon and Brentwood plans; this matter must be resolved prior to submission, of both Local Plans (ideally via a Statement of Common Ground).
Policy NE13: Site Allocations in Green Belt / Policy HP18: Designing Landscape and the Public Realm
Our clients support the strategic release of greenbelt sites in sustainable locations. Dunton Hills Garden Village has followed a robust Green Belt review; Sustainability Appraisal; and site selection process. The draft plan does not allocate land between Dunton Hills Garden Village and West Horndon; therefore it maintains physical separation and avoids the coalescence of the new settlement and existing built up area of West Horndon. To date there is no evidence that it would be possible to meet the Borough's acute housing needs without amending the Green Belt boundaries as proposed in the draft plan.
The Stage III Green Belt Review January 2019 (GBR3) continues the work of the previous two stages. Again the methodology used appears sound and has been consistently applied. GBR3 assesses the DHGV site, Parcel 200, as being Not Contained, exhibiting Significant Separation Reduction between settlements, as being Functional Countryside and of Limited Relationship to Historic Towns. This results in an overall conclusion of Parcel 200 making a moderate to high contribution to the Green Belt. As with the LSCA the scale of DHGV inevitably results in elevated scores.
The Dunton Hills Garden Village allocation (shaded yellow) and wider Green Belt parcel incorporating land West of Basildon in Basildon Borough (shaded red) shown on Figure 1 (below) is an area bounded by the A127, the A128, a railway line and the western edge of Basildon - there are few (if any) examples nationally of more contained and defensible boundary in Green Belt terms.
Figure 1 Green Belt Context: Land West of Basildon (red) and Dunton Hills Garden Village (yellow)
[see attachment]
There would be clear separation maintained between Dunton Hills Garden Village and West Horndon in Brentwood Borough. Paragraph 9.12 is also supported as it recognises that "The B148 (West Mayne) is the eastern road beyond the borough boundary separating the site from the built-up area of Basildon". If Dunton Hills Garden Village and the land West of Basildon (in Basildon Borough) are both allocated it is only logical to remove all of this land from the Green Belt based upon the strong defensible boundaries that exist for both areas. Landscape approach, design principles and physical separation can (as previously discussed) be dealt with via a Statement of Common Ground and complementary Local Plan policies (and guidance) in the respective plans. Policy R01 includes a detailed statutory policy to ensure the new settlement is comprehensively planned via landscape-led approach. This will ensure the development is not simply ribbon development along the A127 and instead an autonomous Settlement Category 2 Garden Village that will complement the existing settlement hierarchy and is well related to the existing communities of Basildon and Laindon and West Horndon.
The Landscape Sensitivity and Landscape Capacity Study: Potential and Strategic Allocation Options October 2018 (LSCA) assigns a landscape capacity to the potential allocations. The methodology used appears sound and has been consistently applied. The LSCA identifies the DHGV site, Parcel 200, as being of high landscape sensitivity, medium - low landscape value and medium - medium low landscape capacity. It is noted that the scale of the strategic options considered make comparison with smaller sites difficult. The scale of DHGV inevitably results in elevated scores.
The site is not the subject of any landscape quality designations that would prevent development. Our clients consider that Policy HP18: Designing Landscape and the Public Realm, in combination with Policy R01(I) clause C, provide an adequate policy framework for guiding a future landscape scheme - including the provision of green infrastructure between R01 and the development of the West of Basildon.
Policy R01: Dunton Hills Garden Village Strategic Allocation
The policy would benefit from being shortened and simplified. Much of the detail could instead be covered in the supporting text. Our clients would recommend a less prescriptive policy in favour of a series of development principles. The policy also recognises the appropriate phasing of infrastructure and mechanisms for delivery. However, our clients have a number of detailed comments to help enhance the clarity and utility of the draft policy.
R01(I)
 Clause B uses the term "self-sustaining" - this is currently an undefined term in the context of the facilities that may be required by future residents. It is likely that services and schooling would also be accessed in Basildon and so the policy should also recognise the importance with connectivity to nearby allocations and settlements in Basildon Borough. Whilst appreciating the need for a garden village to be separate, it should also be appropriately connected and complimentary to nearby settlements.
 There is a slight inconsistency between policy clauses A and D in the use of "around 2,700 homes" and "at least 2,700 homes" in the plan period. Our clients would favour the more positive "at least" in light of the pressing housing needs in the area.
 Policy clause D(c) currently expresses a requirement for employment land as 5.5ha. An alternative approach would be to also reference a jobs figure, employment densities are not fixed and the policy will need to remain flexible to provide the optimum employment solution on the site up to 2033.
 Policy clause D(d) references a co-located Secondary school, but this term is not defined in terms of what facilities could be appropriately co-located or any indication on forms of entry etc. This clause could cross reference to the Infrastructure Delivery Plan that shall remain a living documented capable of being updated as the development of the site evolves.
 Policy clause D(h) states 50% of the "total land area", this term is not defined and may have implications for the net developable area. Without the benefit of a detailed masterplan and Environment Statement supporting an application this requirement appears needlessly onerous and will make the allocation less flexible. We would suggest removal of a specific percentage in advance of further masterplanning and consultation.
R01 (II)
 Policy clause C(f) states: "a green infrastructure buffer / wedge on the eastern boundary with Basildon Borough to achieve visual separation to help significantly improve the landscaped and habitat value thus reinforcing the beneficial purpose and use of the green belt in that zone." This matter needs careful consideration in advance of submission in light of Basildon's representations and their erroneous position on Green Belt coalescence and countryside encroachment in their draft plan (which fails to allocate sufficient land to meet needs). Brentwood should provide further clarity that this separation can be achieved without sterilising large tracts of the allocation. A modest multifunctional green gap running north-south in close proximity to the Borough boundary would be a proportionate response in this location.
 Policy clause D(c) states "pathways through the green and blue infrastructure (GBI) network will be made of permeable material and follow a coherent treatment throughout the village. The pathways will all connect into a circular walk, with interconnected shortcut routes and be signposted offering directions to key destination points". It is premature at this stage to place overly restrictive pathway design where they may be sound place-making reasons for not following this approach in all areas.
 Policy clause I(a) states that emphasis will be given to: "incorporating car sharing clubs and electric vehicle only development". Whilst the principle is supported, this may not be appropriate for all areas of this large allocation and would be overly restrictive.
 Policy clause L(b) includes a small typo for BREEAM. This clause should make clear that BREEAM is for certain types of building only.
R01 (III)
 Clause B states: "The development and phased delivery of DHGV must ensure the timely delivery of the required on-site and off-site infrastructure to address the impact of the new garden village". Whilst supported and the timely delivery on infrastructure is essential in the creation of a sense of community, off-site infrastructure may be beyond the control of the primary land owners/promoter, and risks stalling development if a Grampian condition is envisaged.
An explicit policy clause is urgently required to ensure for a no ransom position. The primary developer must build roads up to the boundary of Crest Nicholson and Bellway Homes landholding. Without this added clause the allocation would be ineffective based upon the tests of soundness.
The Site benefits from the involvement of volume housebuilders which, according to the Letwin Review (2018), leads to a variety in product and higher build out rates. An extensive analysis of national house builder annual reports, conducted by Turley on behalf of Bellway Homes, demonstrates that average delivery rates (per outlet) range from between 40-58 units pa1. There is potential for sites (normally larger sites) to see a number of outlets building new homes at any one time. Additional outlets are sometimes in the form of a different house builder, but it can also be in the form of different products sold from different marketing suites by the same house builder. Crest Nicholson and Bellway Home's landholdings are jointly promoted in order to deliver high quality sustainable developments at pace and will help to achieve the housing trajectory set out in Appendix 1 of the draft plan.
The plan's delivery trajectory relies on increased delivery in the later part of the plan period (partly reliant on infrastructure investment). This emphasises the importance of infrastructure equalisation and removing any ransom scenarios as far as practically possible through statutory policy. In addition, it would be prudent for the ASELA authorities to work together to lever in external funding for reinforcements such as the gas pipeline to enable an alternative access arrangements and internal connectivity that would release more development land for housing and public open space later in the plan period.
R01 Supporting text comments:
 Paragraph 9.30 includes a reference to 'Medium' density- but this is not defined. The allocation location is in close proximity to Basildon and West Horndon and the potential for sustainable modes of transport lends itself to higher densities in district and local centres.
Transport policies B11 - B17
The general approach taken to transport within the Local Plan with the Built Environment policies (BE11 to BE17) is supported and it can be seen that these policies are feeding through into the policies for the site specific allocations.
The evidence base for the Local Plan includes Brentwood Borough Local Plan Transport Assessment (Local Plan TA) dated (October 2018) prepared by PBA and the Infrastructure Delivery Plan (IDP) prepared by the Council. These documents together provides the transport element of the evidence base and support the Council's proposed development strategy including the proposed development at Dunton Hills. They are essential elements of the evidence base and their soundness is not questioned in these representation, however, the conclusions of the Local Plan TA and the IDP need to be better reflected in the Local Plan.
The Local Plan TA sets out the approach to the modelling work, results of modelling and junction assessment, highlights those worse performing junctions that may require mitigations, the sustainable measure proposed and the impact this has on the junction assessment to enable the development sites to come forward. The assessment covers key 27 junctions within Brentwood planning authority.
The assessment assumed that DHGV would provide 2,500 new homes in the Local Plan period along with 5.5ha of employment land. In addition, number of sites located within Basildon Borough Council and Havering Borough Council were included within the reference case scenario in order to accurately assess the impact of Brentwood Local Plan. The West Basildon Urban Extension was included within the reference case assuming provision of 1000 new homes as per 2016 Basildon Local Plan publication.
The Local Plan TA identifies a number of junctions that would need to be improved across the Borough to support the development proposed in the Local Plan. However, the Local Plan Submission Version does not include reference to these. As an example, the following table contains the identified improvements in the surrounding roads to Dunton Hills Garden Village.
Table 2 Results of PBA capacity assessment, Brentwood Local Plan Evidence Base
[see attachment]
While it is clear that some of these improvements would be provided via Essex County Council (ECC) or Highways England as the relevant highway authorities there is no reference made in the Local Plan to them. It would be expected that the evidence base would transfer through to the IDP to be clear on how and when these identified infrastructure improvements would be provided.
As each identified allocated site comes forward to a planning application stage it will define what highway improvements are needed through the Transport Assessment associated with the individual site. However, guidance should be given on what improvements have been identified as part of the Local Plan TA to ensure that the need for them is considered and if they are required then how would they be funded i.e. guidance is needed on the scope for any future Transport Assessments to support developments.
The IDP contains a similar table for highway infrastructure improvements and those relevant to Dunton Hills Garden Village are listed in Table 3 below:
Table 3 IDP Schedule extract.
In addition to four infrastructure requirements relating specifically to DHGV a number of requirements are set out in the IDP for new developments and site allocations coming forward in the Local Plan period. Key improvements to be delivered as part of DHGV development are:
 DHGV: Widening Connectivity - further feasibility studies required to improvements of pedestrian connectivity across the A127 and A128;
 DHGV: Walkways/ Cycleways - provision of a good footway and cycle way network;
 DHGV: Sustainable Transport Infrastructure - provision of cycle hub within the DHGV site; and
 DHGV: Public Realm and Village Square - subject to detailed masterplanning good quality pedestrian centres should be provided.
It is acknowledged within the proposed policy for Dunton Hills Garden Village that reference is made for the need for a Transport Assessment report to be undertaken and this is where the detailed assessment can be made of the highway infrastructure needed to support the proposed allocation. However, there should be some reference to the published evidence base to guide the scope of this work. This is not to say that the identified improvements will be needed, but they should be considered as they have been identified within the evidence base.
Attendance at the examination hearing sessions
Our clients request attendance at the relevant hearing sessions to make verbal submissions in response to matters and questions related to: the Duty to Cooperate; housing numbers and the spatial strategy, landscape, transport, infrastructure, deliverability and the strategic allocations. We reserve the right to make further representations at the examination hearing sessions, should work on Brentwood's Community Infrastructure Levy evolve in respect of any implications on strategic sites and their ability to deliver policy compliant schemes.

Attachments:

Support

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

Representation ID: 24306

Received: 19/03/2019

Respondent: Strutt & Parker LLP

Agent: Strutt & Parker LLP

Representation Summary:

The approach set out in the PSLP for design and place-making is broadly supported. However, we note that there are effectively seven policies (HP12 - HP18) which provide the requirements against these matters. We also note that there are some areas of repetition on some of the objectives against those policies. We consider that those commenting on and determining applications should preferably have one or two identified policies to refer to and/or applicable thresholds to more succinctly set out requirements. This would ensure that planning applications can be more effectively judged against context, design and place-shaping criteria

Change suggested by respondent:

There are seven policies on Design and Place Making. This should be reduced to one or two policies to reduce repetition and improving consistency in determining planning applications

Full text:

These representations are submitted by Strutt & Parker on behalf of Stonebond Properties Ltd. in relation to the Brentwood Borough Council (BBC) Proposed Submission Local Plan (Regulation 19) (PSLP), and in particular with regards to our client's land interests at Stocks Lane, Kelvedon Hatch. This is proposed for allocation under Policy R24 of the PSLP. Plans showing the site are included within the Vision Document at Appendix A to this representation. As the Council will be aware, representations have previously been made on behalf of the landowner, W H Norris & Sons, in respect of the land at Stocks Lane, most recently as part of the Regulation 18 Local Plan Consultation in March 2018. Since then the site has come into the control of Stonebond Properties Ltd, a local housing developer with considerable experience of bringing forward high quality homes on small and medium sites. As a result of the previous representations and discussions with officers at Brentwood Borough Council alongside the Local Plan process, this site and land at Blackmore Road (Site R23, Brize's Corner Field, also now under Stonebond Properties' control) have been proposed as sites for future residential development within PSLP. Stonebond's overall position is one of firm support for the PSLP and this is expressed where relevant in these representations, albeit with some overarching concerns, notably in relation to certain elements of the Policy R24 in relation to the amount of development, the expected time for delivery in the Plan period and certain elements of the PSLP's Development Management Policies. Where such concerns are raised, specific changes to the relevant policies are sought and these are indicated in the following representations in order to assist in BBC making the Plan more robust and improving its soundness in terms of being positively prepared, effective, justified and consistent with national policy. Stonebond Properties request the right for its professional advisors to provide further responses on any matters appropriate to their land interests at the relevant sessions of the Examination of the submitted Local Plan. Settlement Hierarchy: Kelvedon Hatch is confirmed as a Category 3 Larger Village as set out in the Settlement Hierarchy shown at figure 2.3 of PSLP. It states that these villages are characterised by the amount of amenities and services able to cater for residents' day to day needs. Kelvedon Hatch has a local centre with a range of services, facilities, access to public transport, and education services. The PSLP sets out that Category 3 settlements should seek to make the most of brownfield redevelopment opportunities, while limited urban extensions will be encouraged to meet local needs where appropriate. The population is stated as 2,124, making Kelvedon Hatch the second largest Category 3 Settlement behind Doddinghurst. Due to the proximity of Doddinghurst (around 1km to the east), there is a reciprocal relationship between the two villages in terms of the availability and access to services and other facilities. As a result, development at Kelvedon Hatch is clearly a sustainable location to which a proportion of the Borough's housing need should be directed. In addition, as an established community, it is important that the Local Plan provides for the growth of the settlement to ensure the vitality of the community is sustained or enhanced. In line with Paragraph 78 of the NPPF, growth in one village may have the added benefit of further supporting opportunities and growth in nearby surrounding villages. The two sites for additional housing in Kelvedon Hatch identified in the PSLP at Land at Stocks Lane (R24) and west at Blackmore Road (R23) are fully supported. The proposed allocation of these two sites is considered to be justified, consistent with national policy and necessary to ensure the sustainable growth of Kelvedon Hatch and the Borough for reasons set out elsewhere in these representations. Spatial Strategy - Vision and Strategic Objectives: Vision for the Borough: The Vision for the Borough set out at Section 3 of the PSLP is supported. For the reasons set out in these representations, carefully planned development at Kelvedon Hatch as provided for at Policies R23 and R24 will make an important contribution to BBC's housing needs to meet the Local Plan objectives. Indeed, these representations and those relating to R24 make the case that a modest and justified increase in the sites' ability to accommodate more homes will assist meet those aims and provide for greater flexibility in meeting housing needs. Stonebond Properties have undertaken detailed site assessments. These confirm that there are no barriers to delivery of development. As a consequence, the expressed objectives of development in the Vision to be landscape-led responding to a "design and build with nature approach firmly embedding high quality green infrastructure through public realm to create a seamless transition to our surrounding countryside" can all be achieved and delivered in the allocation of sites R23 and R24. This is demonstrated in the accompanying Vision Documents to this representation for R24. Managing Growth - Policy SP02: Managing Growth: Policy SP02 proposes a total of 7,752 dwellings be provided in the Borough between 2011 and 2033 with 310 homes per year to 2022/23 and then 584 per year from 2022/23 taking forward a "stepped delivery" approach to deal with a projected shortfall in the first 5 years of the PSLP. This is mainly because a greater proportion of homes to be delivered in the PSLP comprise sites located in the Green Belt, resulting in longer lead in times to delivery. Whilst we do not raise objections in principle to the stepped approach as far as our clients are concerned there is a prospect that some sites in the Green Belt have the prospect of coming forward earlier, particularly smaller and medium sized developments. This certainly includes this site R24, and R23 that is the subject of a separate representation. This matter is dealt with further at Section 8 below. Furthermore, and notwithstanding the stepped approach proposed, there are still issues with BBC's over-optimistic estimates and assumptions on the delivery of larger strategic sites proposed for allocation in the PSLP. BBC are effectively placing most of its "eggs in one basket." in the range of sites that are proposed in the PSLP. It is important to note that, of the new allocations, 4,578 homes are made up of strategic allocations (of which 2,700 are at Dunton Hills Garden Village and are to be delivered in the Plan period) and 1,510 are other allocations The strategic sites therefore represent 68% of the total number of new homes of which some 59% are allocated at Dunton Hills. The ability of larger strategic sites to come forward quickly has been the subject of recent assessments in the Independent Review of Build Out, the Letwin Review (2018); and issues with their complexity, have been ably set out in the Lichfield's study From Start to Finish (2016). Both provide empirical evidence that the early delivery of such sites can be problematical due to a range of factors, including establishing required infrastructure requirements and the timing of housing delivery associated with those requirements, as well as the prolonged or protracted nature of the planning process. The Lichfield's report confirms that the planning process takes, on average, 2.5 years for the planning application determination period for up to 500 units; this can double for sites over 1,000 units. Two of the strategic sites within the PSLP's allocations also comprise developed sites currently in employment uses. The strategic sites are expected to deliver some 1555 homes within 5 years of an assumed adoption in 2020/21. Given the issues set out above it is considered that this is unrealistic and it would not be justified or the most appropriate strategy to rely on these sites for short term housing delivery. It therefore emphasises the need to review the ability of smaller or medium sized sites such as R23 and R24 to provide for greater flexibility and more homes which have a far greater prospect for short term delivery to ensure the Local Plan is sound. Sequential Land Use: Paragraph 4.22 and 4.23 of the PSLP suggested that a sequential approach is to be taken to the determination of planning applications, referring only to prioritising brownfield land in urban areas and brownfield land in the Green Belt. The reasons for this are unclear when the PSLP strategy includes releasing land from the Green Belt to meet development needs which includes the sites the subject of these representations. The growth requirements set out by Policy SP02, and the sequential approach to meeting those requirements are referred to at paragraph 3.23, provide for the justification for the chosen spatial strategy. As a consequence, it is not justified to suggest that a sequential test be taken for the determination of planning applications and paras 4.22 and 4.23 should be deleted from the PSLP. SP04 - Developer Contributions: There are no objections to the general approach expressed in Policy SP04 for developer contributions. However, section E is nether precise, necessary or justified and could be open to misinterpretation. It is therefore recommended that this be omitted. Resilient Built Environment: We are generally supportive of the Council's objectives to achieve a resilient built environment. Nevertheless, there are concerns that the policies set out in the PSLP and as drafted may have an impact on viability, deliverability and affordability for housing development generally. We are aware of the representations made by the House Builders Federation (HBF) referring to sustainable construction (BE020), allotments (BE20), Green and Blue Infrastructure (BE18), access to nature (BE19), digital infrastructure (BE10), open space (BE22), electrical vehicle charging (BE15), housing quality (HP06). The implications of the requirements set out do not appear to have been fully considered as part of the viability assessment. As a consequence, we would suggest that the viability assessment for the PSLP is revisited to reflect on these requirements to better inform or provide clarity on the proposed policies. Policy BE01 - Future Proofing: Whilst the Council's objectives towards future proofing of development are broadly supported, it is questionable whether it is necessary to set out a detailed planning policy to this effect when a number of the criteria set out comprise a series of aspirations. It is of some concern that Part A of the Policy requires that all applications must take into account....... when the process of development management and determination of applications is far more prescriptive and binary in decision making. As a consequence, it is suggested that Policy BE01 should be set out as supporting text rather than a specific policy. Policy BE02 - Sustainable Construction and Resource Efficiency: Whilst the Council's objectives towards sustainable construction and resource efficiency are broadly supported, it is questionable whether it is necessary to set out a detailed planning policy to this effect when a number of the criteria set out comprise a series of aspirations. The requirement to submit details of measures that increase resilience to the threat of climate change at b. is also considered to be over prescriptive when such techniques may vary substantially. The general principles set out at para 5.19 are reflective of the fact that these matters ought more properly to be dealt with by supporting text rather than a specific policy. In addition, we are aware of comments made by the HBF on this policy and we support those comments. Policy BE20 - Allotments and Community Food Growing Space: Whilst the Council's aspirations for providing allotments are acknowledged, the policy as set out provides for no clear thresholds as to when such space should be provided which is not justified in the terms set out. On this basis, it is recommended that the policy should either be omitted and dealt with by the text to the PSLP or justified against thresholds or site specific requirements. In this respect, it may be that large strategic sites may need to include a requirement but it is certainly not necessary for smaller or medium sized sites, such as those the subject of these representations. Policy BE22 - Open Space in New Development: The policy is broadly supported. As can be seen from the Vision document that accompanies these representations, our proposed scheme for R24 makes provision for such space. It is nevertheless questionable whether it is necessary for all open space to be fully equipped (D.). The need for equipped space should also be related to the amount of development proposed and/or availability or local equipped areas. As a consequence, it is recommended that criteria D is amended to be refined to provide clarity on when equipped open space is required eg. on sites over 50 homes. Housing Provision: Policy HP01 - Housing Mix: The Council's approach to providing for an appropriate mix of dwelling types is generally supported. However, the Policy as set out refers to the Borough wide requirements in the Strategic Housing Market Assessment (SHMA) and does not necessarily take into account a local area or sub area within the Borough. It is important to note that the SHMA requirements, at Figure 6.1, confirms that it is an indicative mix guide for market housing. It is also noted that para 6.5 confirms that the final mix will be subject to negotiation. This is welcomed on the basis that some flexibility will be necessary in certain circumstances as part of the planning application process. As a consequence, it is suggested that para 6.5 should provide greater clarity and a minor change confirming that the final mix will be subject to negotiation "as part of a planning application" rather than "with the applicant". We are aware of the representations submitted by HBF regarding accessible homes and justification. We support those views. It is questionable whether it is necessary for the PSLP to set out in planning policy the requirements of Building Regulations. Policy HP03 - Residential Density: We support the PSLP's approach to residential density as set out in Policy HP03. This is considered to be justified based on the evidence and consistent with the national policy. As far as our client's land interests are concerned at R23 and R24, both sites are capable of providing an increased density to that expressed for the relevant policies R23 and R24. However, part B of the policy quite properly acknowledges that a chosen density should take into account the character of the surrounding area and other site constraints. This is supported. A further explanation of suggested density or yield for R24 is set out at Section 8 below. Policy HP05 - Affordable Housing: We note that the SHMA provides justification for the affordable housing requirements. However, it is questionable whether the precise tenure/mix should be set out at B(a) of the Policy, given that requirements can change relatively quickly over time and the prescriptive approach may not take into account precise local needs. As a consequence, it is recommended that the criteria under B(a) should omit the reference to 86% and 14% proportions. It is suggested, in the alternative, that "the mix, size, type and cost of affordable homes will meet the identified housing needs of the Council's area and local needs as appropriate, established by housing need assessments including the SHMA". Design and Place-making: The approach set out in the PSLP for design and place-making is broadly supported. However, we note that there are effectively seven policies (HP12 - HP18) which provide the requirements against these matters. We also note that there are some areas of repetition on some of the objectives against those policies. We consider that those commenting on and determining applications should preferably have one or two identified policies to refer to and/or applicable thresholds to more succinctly set out requirements. This would ensure that planning applications can be more effectively judged against context, design and place-shaping criteria. Natural Environment: We generally support the Council's approach to Green Belt and the identification of suitable sites to meet the Council's housing and other needs. Accompanying these representations is an overview of the Green Belt and Landscape Sensitivity considerations relating to Stonebond's land interests at R23 and R24 to confirm the suitability of removing those sites from the Green Belt and limited impact on the landscape. Policy NE13 - Site Allocations in the Green Belt: We welcome the PSLP's intentions to remove sites R23 and R24 from the Green Belt. This calls into question the need for Policy NE13. The requirements set out by criterion A and B are dealt with by other policies in the Plan. If there are site specific requirements relating to sites, these should be covered within the specific policies relating to those sites. Site Allocations: Policy R24 - Land off Stocks Lane: The proposed allocation of Land off Stocks Lane as Policy R24 and its removal from the Green Belt is considered sound and is fully supported. It has been established through the evidence base supporting the PSLP that Kelvedon Hatch is a sustainable location to accommodate a modest amount of new houses to contribute to the Borough's housing needs. Indeed, as recognised by para 68 of the NPPF and as a medium sized site, such sites make an important contribution to "meeting the housing requirement of an area and are often built out quickly". We do however have some concerns with the amount of development set out at A of the Policy and the indicative yield at page 340 and the suggested trajectory for the site at Appendix 1. These matters are dealt with below. Supporting these representations is a Vision Document at Appendix A, a review of Green Belt and Landscape Sensitivity at Appendix B and a Summary Drainage and Utility Appraisal at Appendix C. These all confirm that the development at the site is both justified and fully deliverable within the terms of para 67a) of the NPPF. The Vision Document demonstrates that careful consideration has been given to the emerging policies set out at BE01, BE08, BE22, as well as those relating to Design and Place-making at HP12, HP13, HP14, HP15 and HP18 of the PSLP to confirm that a scheme can meet the PSLP objectives in this regard. The Summary Drainage and Utility Appraisal at Appendix B confirms that there are no constraints to delivery. In addition, Stonebond Properties commissioned a transport appraisal from Ardent Consulting Engineers. This has confirmed that the location of the access shown in the Vision Document meets normal highway requirements in terms of safety and visability. This has been confirmed in speed surveys undertaken in Stocks Lane. The Green Belt and Landscape Sensitivity Assessment at Appendix B confirms that the release of the site from the Green Belt is justified. It also confirms that there would be no significant impact on the surrounding landscape. Part A of Policy R24 suggests that there be provision for around 30 new homes on the site. Part A Policy HP03 of the PSLP requires proposals to take a design led approach to density to ensure schemes are sympathetic to local character and make efficient use of land. Part B expects development to achieve a net density of at least 35dph unless the special character of the surrounding area suggests that such densities would be inappropriate. The suggested amount of 30 homes set out for Policy R24 does not currently reflect these requirements or provide an accurate representation of what is achievable on site. 30 homes represent 18.6dph which clearly does not represent an efficient or effective use of the land contrary to the objectives of HP03 and the supporting text set out at 6.18 to 6.20 and 6.22. The Vision Document confirms that around 45 homes can actually be provided on the site representing a far more efficient and effective dwelling yield. 45 homes would represent a density of approximately 28dph. Whilst this does not achieve 35dph, the Vision Document demonstrates that full account has been taken of the objectives of HP03 to ensure that a scheme would be sympathetic to local character. Critically, the illustrative scheme shows provision for open space within the site to meet the objectives of Policies HP13 and BE22. These policies provide for functional on-site open space. As such, achieving a greater density would be problematical. In addition, it is important to note that the site is on the edge of the settlement where there is a need for sensitivity, having regard to the countryside to the east and south. Para 6.22 of the PSLP confirms that efficient land use is critical to the delivery of this Plan for the reasons set out at Sections 4 and 6 above against this background, it is recommended that amendments are made as follows: Policy R24A - substitute 30 new homes with 45 new homes; Page R24 - indicative dwelling yield substitute 30 with 45. At para 9.195 the PSLP suggests the development would take its access from Blackmore Road. This is an error. The paragraph should be amended to refer to Stocks Lane. The site is within the control of Stonebond Properties, a local house builder with considerable experience in the development of medium sized sites, quick delivery and achieving high design and layout standards. Upon removal from the Green Belt and grant of a planning permission, it would be expected that development at the site could commence 2020/21 and be completed within two years of the Plan. As a consequence, it is recommended that the Local Development Plan Housing Trajectory at Appendix 1 is amended to provide for the following based on an increased number of homes as set out in these representations: Year 5 - 2020/21 = 10; Year 6 - 2021/22 = 35. These comments on Policy R24 provide greater certainty on delivery of the site. In addition, the changes suggested would contribute to the issues we have identified elsewhere with the PSLP specifically in relation to the supply and delivery of homes generally. As a result, we trust that the Council will be able to agree modifications/changes accordingly.

Support

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

Representation ID: 24332

Received: 19/03/2019

Respondent: Strutt & Parker LLP

Agent: Strutt & Parker LLP

Representation Summary:

The approach set out in the PSLP for design and place-making is broadly supported. However, we note that there are effectively seven policies (HP12 - HP18) which provide the requirements against these matters. We also note that there are some areas of repetition on some of the objectives against those policies. We consider that those commenting on and determining applications should preferably have one or two identified policies to refer to and/or applicable thresholds to more succinctly set out requirements. This would ensure that planning applications can be more effectively judged against context, design and place-shaping criteria.

Change suggested by respondent:

There are seven policies on Design and Place Making. This should be reduced to one or two policies to reduce repetition and improving consistency in determining planning applications.

Full text:

These representations are submitted by Strutt & Parker on behalf of Stonebond Properties Ltd. in relation to the Brentwood Borough Council (BBC) Proposed Submission Local Plan (Regulation 19) (PSLP), and in particular with regards to our client's land interests at Stocks Lane, Kelvedon Hatch. This is proposed for allocation under Policy R24 of the PSLP. Plans showing the site are included within the Vision Document at Appendix A to this representation. As the Council will be aware, representations have previously been made on behalf of the landowner, W H Norris & Sons, in respect of the land at Stocks Lane, most recently as part of the Regulation 18 Local Plan Consultation in March 2018. Since then the site has come into the control of Stonebond Properties Ltd, a local housing developer with considerable experience of bringing forward high quality homes on small and medium sites. As a result of the previous representations and discussions with officers at Brentwood Borough Council alongside the Local Plan process, this site and land at Blackmore Road (Site R23, Brize's Corner Field, also now under Stonebond Properties' control) have been proposed as sites for future residential development within PSLP. Stonebond's overall position is one of firm support for the PSLP and this is expressed where relevant in these representations, albeit with some overarching concerns, notably in relation to certain elements of the Policy R24 in relation to the amount of development, the expected time for delivery in the Plan period and certain elements of the PSLP's Development Management Policies. Where such concerns are raised, specific changes to the relevant policies are sought and these are indicated in the following representations in order to assist in BBC making the Plan more robust and improving its soundness in terms of being positively prepared, effective, justified and consistent with national policy. Stonebond Properties request the right for its professional advisors to provide further responses on any matters appropriate to their land interests at the relevant sessions of the Examination of the submitted Local Plan. Settlement Hierarchy: Kelvedon Hatch is confirmed as a Category 3 Larger Village as set out in the Settlement Hierarchy shown at figure 2.3 of PSLP. It states that these villages are characterised by the amount of amenities and services able to cater for residents' day to day needs. Kelvedon Hatch has a local centre with a range of services, facilities, access to public transport, and education services. The PSLP sets out that Category 3 settlements should seek to make the most of brownfield redevelopment opportunities, while limited urban extensions will be encouraged to meet local needs where appropriate. The population is stated as 2,124, making Kelvedon Hatch the second largest Category 3 Settlement behind Doddinghurst. Due to the proximity of Doddinghurst (around 1km to the east), there is a reciprocal relationship between the two villages in terms of the availability and access to services and other facilities. As a result, development at Kelvedon Hatch is clearly a sustainable location to which a proportion of the Borough's housing need should be directed. In addition, as an established community, it is important that the Local Plan provides for the growth of the settlement to ensure the vitality of the community is sustained or enhanced. In line with Paragraph 78 of the NPPF, growth in one village may have the added benefit of further supporting opportunities and growth in nearby surrounding villages. The two sites for additional housing in Kelvedon Hatch identified in the PSLP at Land at Stocks Lane (R24) and west at Blackmore Road (R23) are fully supported. The proposed allocation of these two sites is considered to be justified, consistent with national policy and necessary to ensure the sustainable growth of Kelvedon Hatch and the Borough for reasons set out elsewhere in these representations. Spatial Strategy - Vision and Strategic Objectives: Vision for the Borough: The Vision for the Borough set out at Section 3 of the PSLP is supported. For the reasons set out in these representations, carefully planned development at Kelvedon Hatch as provided for at Policies R23 and R24 will make an important contribution to BBC's housing needs to meet the Local Plan objectives. Indeed, these representations and those relating to R24 make the case that a modest and justified increase in the sites' ability to accommodate more homes will assist meet those aims and provide for greater flexibility in meeting housing needs. Stonebond Properties have undertaken detailed site assessments. These confirm that there are no barriers to delivery of development. As a consequence, the expressed objectives of development in the Vision to be landscape-led responding to a "design and build with nature approach firmly embedding high quality green infrastructure through public realm to create a seamless transition to our surrounding countryside" can all be achieved and delivered in the allocation of sites R23 and R24. This is demonstrated in the accompanying Vision Documents to this representation for R24. Managing Growth - Policy SP02: Managing Growth: Policy SP02 proposes a total of 7,752 dwellings be provided in the Borough between 2011 and 2033 with 310 homes per year to 2022/23 and then 584 per year from 2022/23 taking forward a "stepped delivery" approach to deal with a projected shortfall in the first 5 years of the PSLP. This is mainly because a greater proportion of homes to be delivered in the PSLP comprise sites located in the Green Belt, resulting in longer lead in times to delivery. Whilst we do not raise objections in principle to the stepped approach as far as our clients are concerned there is a prospect that some sites in the Green Belt have the prospect of coming forward earlier, particularly smaller and medium sized developments. This certainly includes this site R24, and R23 that is the subject of a separate representation. This matter is dealt with further at Section 8 below. Furthermore, and notwithstanding the stepped approach proposed, there are still issues with BBC's over-optimistic estimates and assumptions on the delivery of larger strategic sites proposed for allocation in the PSLP. BBC are effectively placing most of its "eggs in one basket." in the range of sites that are proposed in the PSLP. It is important to note that, of the new allocations, 4,578 homes are made up of strategic allocations (of which 2,700 are at Dunton Hills Garden Village and are to be delivered in the Plan period) and 1,510 are other allocations The strategic sites therefore represent 68% of the total number of new homes of which some 59% are allocated at Dunton Hills. The ability of larger strategic sites to come forward quickly has been the subject of recent assessments in the Independent Review of Build Out, the Letwin Review (2018); and issues with their complexity, have been ably set out in the Lichfield's study From Start to Finish (2016). Both provide empirical evidence that the early delivery of such sites can be problematical due to a range of factors, including establishing required infrastructure requirements and the timing of housing delivery associated with those requirements, as well as the prolonged or protracted nature of the planning process. The Lichfield's report confirms that the planning process takes, on average, 2.5 years for the planning application determination period for up to 500 units; this can double for sites over 1,000 units. Two of the strategic sites within the PSLP's allocations also comprise developed sites currently in employment uses. The strategic sites are expected to deliver some 1555 homes within 5 years of an assumed adoption in 2020/21. Given the issues set out above it is considered that this is unrealistic and it would not be justified or the most appropriate strategy to rely on these sites for short term housing delivery. It therefore emphasises the need to review the ability of smaller or medium sized sites such as R23 and R24 to provide for greater flexibility and more homes which have a far greater prospect for short term delivery to ensure the Local Plan is sound. Sequential Land Use: Paragraph 4.22 and 4.23 of the PSLP suggested that a sequential approach is to be taken to the determination of planning applications, referring only to prioritising brownfield land in urban areas and brownfield land in the Green Belt. The reasons for this are unclear when the PSLP strategy includes releasing land from the Green Belt to meet development needs which includes the sites the subject of these representations. The growth requirements set out by Policy SP02, and the sequential approach to meeting those requirements are referred to at paragraph 3.23, provide for the justification for the chosen spatial strategy. As a consequence, it is not justified to suggest that a sequential test be taken for the determination of planning applications and paras 4.22 and 4.23 should be deleted from the PSLP. SP04 - Developer Contributions: There are no objections to the general approach expressed in Policy SP04 for developer contributions. However, section E is nether precise, necessary or justified and could be open to misinterpretation. It is therefore recommended that this be omitted. Resilient Built Environment: We are generally supportive of the Council's objectives to achieve a resilient built environment. Nevertheless, there are concerns that the policies set out in the PSLP and as drafted may have an impact on viability, deliverability and affordability for housing development generally. We are aware of the representations made by the House Builders Federation (HBF) referring to sustainable construction (BE020), allotments (BE20), Green and Blue Infrastructure (BE18), access to nature (BE19), digital infrastructure (BE10), open space (BE22), electrical vehicle charging (BE15), housing quality (HP06). The implications of the requirements set out do not appear to have been fully considered as part of the viability assessment. As a consequence, we would suggest that the viability assessment for the PSLP is revisited to reflect on these requirements to better inform or provide clarity on the proposed policies. Policy BE01 - Future Proofing: Whilst the Council's objectives towards future proofing of development are broadly supported, it is questionable whether it is necessary to set out a detailed planning policy to this effect when a number of the criteria set out comprise a series of aspirations. It is of some concern that Part A of the Policy requires that all applications must take into account....... when the process of development management and determination of applications is far more prescriptive and binary in decision making. As a consequence, it is suggested that Policy BE01 should be set out as supporting text rather than a specific policy. Policy BE02 - Sustainable Construction and Resource Efficiency: Whilst the Council's objectives towards sustainable construction and resource efficiency are broadly supported, it is questionable whether it is necessary to set out a detailed planning policy to this effect when a number of the criteria set out comprise a series of aspirations. The requirement to submit details of measures that increase resilience to the threat of climate change at b. is also considered to be over prescriptive when such techniques may vary substantially. The general principles set out at para 5.19 are reflective of the fact that these matters ought more properly to be dealt with by supporting text rather than a specific policy. In addition, we are aware of comments made by the HBF on this policy and we support those comments. Policy BE20 - Allotments and Community Food Growing Space: Whilst the Council's aspirations for providing allotments are acknowledged, the policy as set out provides for no clear thresholds as to when such space should be provided which is not justified in the terms set out. On this basis, it is recommended that the policy should either be omitted and dealt with by the text to the PSLP or justified against thresholds or site specific requirements. In this respect, it may be that large strategic sites may need to include a requirement but it is certainly not necessary for smaller or medium sized sites, such as those the subject of these representations. Policy BE22 - Open Space in New Development: The policy is broadly supported. As can be seen from the Vision document that accompanies these representations, our proposed scheme for R24 makes provision for such space. It is nevertheless questionable whether it is necessary for all open space to be fully equipped (D.). The need for equipped space should also be related to the amount of development proposed and/or availability or local equipped areas. As a consequence, it is recommended that criteria D is amended to be refined to provide clarity on when equipped open space is required eg. on sites over 50 homes. Housing Provision: Policy HP01 - Housing Mix: The Council's approach to providing for an appropriate mix of dwelling types is generally supported. However, the Policy as set out refers to the Borough wide requirements in the Strategic Housing Market Assessment (SHMA) and does not necessarily take into account a local area or sub area within the Borough. It is important to note that the SHMA requirements, at Figure 6.1, confirms that it is an indicative mix guide for market housing. It is also noted that para 6.5 confirms that the final mix will be subject to negotiation. This is welcomed on the basis that some flexibility will be necessary in certain circumstances as part of the planning application process. As a consequence, it is suggested that para 6.5 should provide greater clarity and a minor change confirming that the final mix will be subject to negotiation "as part of a planning application" rather than "with the applicant". We are aware of the representations submitted by HBF regarding accessible homes and justification. We support those views. It is questionable whether it is necessary for the PSLP to set out in planning policy the requirements of Building Regulations. Policy HP03 - Residential Density: We support the PSLP's approach to residential density as set out in Policy HP03. This is considered to be justified based on the evidence and consistent with the national policy. As far as our client's land interests are concerned at R23 and R24, both sites are capable of providing an increased density to that expressed for the relevant policies R23 and R24. However, part B of the policy quite properly acknowledges that a chosen density should take into account the character of the surrounding area and other site constraints. This is supported. A further explanation of suggested density or yield for R24 is set out at Section 8 below. Policy HP05 - Affordable Housing: We note that the SHMA provides justification for the affordable housing requirements. However, it is questionable whether the precise tenure/mix should be set out at B(a) of the Policy, given that requirements can change relatively quickly over time and the prescriptive approach may not take into account precise local needs. As a consequence, it is recommended that the criteria under B(a) should omit the reference to 86% and 14% proportions. It is suggested, in the alternative, that "the mix, size, type and cost of affordable homes will meet the identified housing needs of the Council's area and local needs as appropriate, established by housing need assessments including the SHMA". Design and Place-making: The approach set out in the PSLP for design and place-making is broadly supported. However, we note that there are effectively seven policies (HP12 - HP18) which provide the requirements against these matters. We also note that there are some areas of repetition on some of the objectives against those policies. We consider that those commenting on and determining applications should preferably have one or two identified policies to refer to and/or applicable thresholds to more succinctly set out requirements. This would ensure that planning applications can be more effectively judged against context, design and place-shaping criteria. Natural Environment: We generally support the Council's approach to Green Belt and the identification of suitable sites to meet the Council's housing and other needs. Accompanying these representations is an overview of the Green Belt and Landscape Sensitivity considerations relating to Stonebond's land interests at R23 and R24 to confirm the suitability of removing those sites from the Green Belt and limited impact on the landscape. Policy NE13 - Site Allocations in the Green Belt: We welcome the PSLP's intentions to remove sites R23 and R24 from the Green Belt. This calls into question the need for Policy NE13. The requirements set out by criterion A and B are dealt with by other policies in the Plan. If there are site specific requirements relating to sites, these should be covered within the specific policies relating to those sites. Policy R23 - Brizes Corner Field, Blackmore Road: The proposed allocation of Land off Blackmore Road as Policy R23 and its removal from the Green Belt is considered sound and is fully supported. It has been established through the evidence base supporting the PSLP that Kelvedon Hatch is a sustainable location to accommodate a modest amount of new houses to contribute to the Borough's housing needs. Indeed, as recognised by para 68 of the NPPF and as a medium sized site, such sites make an important contribution to "meeting the housing requirement of an area and are often built out quickly". We do however have some concerns with the amount of development set out at A of the Policy, the indicative yield at page 339 and the suggested trajectory for the site at Appendix 1. These representations provide for a modest increase in the developable area of the site with compensatory open space/structural landscaping. These matters are dealt with further below. Supporting these representations is a Vision Document at Appendix A, a review of Green Belt and Landscape Sensitivity at Appendix B and a Summary Drainage and Utility Appraisal at Appendix C. These all confirm that the development at the site is both justified and fully deliverable within the terms of para 67a) of the NPPF. The Vision Document demonstrates that careful consideration has been given to the emerging policies set out at BE01, BE08, BE22, as well as those relating to Design and Place-making at HP12, HP13, HP14, HP15 and HP18 of the PSLP to confirm that a scheme can meet the PSLP objectives in this regard. The Summary Drainage and Utility Appraisal at Appendix B confirms that there are no constraints to delivery. In addition, Stonebond Properties commissioned a transport appraisal from Ardent Consulting Engineers. This has confirmed that the location of the access shown in the Vision Document meets normal highway requirements in terms of safety and visibility. This has been confirmed in speed surveys undertaken in Blackmore Road. The Green Belt and Landscape Sensitivity Assessment at Appendix B confirms that the release of the site from the Green Belt is justified. It also confirms that there would be no significant impact on the surrounding landscape. Vision Document illustrates a form of development for the proposed allocation area set out in the PSLP to provide for around 28 homes. These representations suggest that the allocated area could increase to provide for a modest addition to the developable area in associate with compensatory open space and structural landscaping. It is considered that the proposals would be in accordance with para 138 of the NPPF. This advises local planning authorities to "set out ways in which the impact of removing land from the Green Belt can be off set through compensatory improvements to the environmental quality and accessibility of remaining Green Belt land". The Vision Document demonstrates how this can be achieved using land that is within their control. The Green Belt and Landscape Sensitivity Assessment confirms that such an approach would not result in demonstrable harm to the Green Belt or landscape. Part A of Policy R23 suggests that there be provision for around 23 new homes on the site. Part A Policy HP03 of the PSLP requires proposals to take a design led approach to density to ensure schemes are sympathetic to local character and make efficient use of land. Part B expects development to achieve a net density of at least 35dph unless the special character of the surrounding area suggests that such densities would be inappropriate. Based on page 339 of the PSLP, the suggested dwelling yield of 23 homes would result in a density of 29dph. The Vision Document confirms that within the allocated area it would be possible to provide around 28 homes at a density of 35dph. The Vision Document sets out an alternative approach to the allocation to increase the area to 2.45ha gross. This would provide for around 45 homes at 29dph on a net developable area of approximately 1.6ha. Critically, the Vision Document provides for a third of the area to be set aside for structural accessible open space in accordance with para 138 of the NPPF. The Vision Document therefore proposes that around 45 homes can be provided on the site representing a far more efficient and effective dwelling yield with benefits for open space and the Green Belt generally in this location by bringing forward a robust and enduring boundary. The Vision Document demonstrates that full account has been taken of the objectives of HP03 to ensure that a scheme would be sympathetic to local character. Critically, the illustrative scheme for the increased area for allocation would meet objectives for open space within the site in accordance with Policies HP13 and BE22 whilst taking into account the need for sensitivity, having regard to the countryside to the west and south. Section 4 of these representations sets out the need for greater flexibility and need for the provision of medium sized sites to aid the Council's housing needs and requirements. Against this background, these proposals to provide a modest increase to the allocated area for R23 are commended to the Council on the basis that the increased area provide for structural and accessible open space. It is therefore recommended that Policy R23 is amended as follows: Policy R23A - substitute 23 new homes with 45 new homes; Policy R23B - additional bullet point b - development shall provide for not less than 0.7ha for accessible public open space and structural landscaping; Page 339 R23 - indicative dwelling yield substitute 23 with 45. The site is within the control of Stonebond Properties, a local house builder with considerable experience in the development of medium sized sites, quick delivery and achieving high design and layout standards. Upon removal from the Green Belt and grant of a planning permission, it would be expected that development at the site could commence 2020/21 and be completed within two years of the Plan. As a consequence, and based on these representations for an increased allocation, it is recommended that the Local Development Plan Housing Trajectory at Appendix 1 is amended to provide for the following based on an increased number of homes as set out in these representations: Year 5 2020/21 = 10 and Year 6 - 2021/22 = 35. These comments on Policy R23 provide an ability for a modest increase in the amount of houses for the allocated site with significant local benefits for accessible open space and structural landscaping. This would result in compensatory improvements to the environmental quality and accessibility of Green Belt land in accordance with para 139 of the NPPF. In addition, the recommended changes would contribute to the issues we have identified elsewhere with the PSLP specifically in relation to the supply and delivery of homes generally. As a result, we trust that the Council will be able to agree modifications/changes accordingly.