POLICY HP06: STANDARDS FOR NEW HOUSING

Showing comments and forms 1 to 5 of 5

Support

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

Representation ID: 22322

Received: 16/03/2019

Respondent: Anglian Water

Representation Summary:

Policy HP06 welcomes the cross reference made to Policies BE02 Sustainable Construction and Resource Efficiency and BE08 Sustainable Drainage subject to our comments relating to these policies.

Full text:

Policy HP06 welcomes the cross reference made to Policies BE02 Sustainable Construction and Resource Efficiency and BE08 Sustainable Drainage subject to our comments relating to these policies.

Object

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

Representation ID: 23682

Received: 26/04/2019

Respondent: Gladman Developments

Agent: Gladman Developments

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

If the Council wishes to adopt the NDSS as a policy requirement, then this should only be done in accordance with the Revised Framework footnote 46 i.e. where this would address an identified need for such properties and where the standards can be justified. The WMS dated 25th March 2015 stated that "the optional new national technical standards should only be required through any new Local Plan policies if they address a clearly evidenced need, and where their impact on viability has been considered, in accordance with the NPPG". We have been unable to locate where the evidence of a need for these standards is contained within the evidence base. Without this evidence, these requirements should be removed from the Local Plan.

Change suggested by respondent:

Remove Nationally Described Space Standards (NDDS) from the plan.

Full text:

Brentwood Local Plan
Pre-Submission Document

CONTENTS
1 Introduction 2
1.1 Introduction 2
1.2 Context 2
2 National Planning Policy 3
2.1 National Planning Policy Framework 3
2.2 Planning Practice Guidance 4
3 Legal Requirements 7
3.1 Duty to Cooperate 7
3.2 Sustainability Appraisal 8
4 Spatial Strategy 9
4.1 Vision and Strategic Objectives 9
5 Managing Growth 10
5.1 Policy SP02: Managing Growth 10
5.2 Policy SP04: Developer Contributions 11
6 Resilient Built Environment 12
6.1 Policy BE02: Sustainable Construction and Resource Efficiency 12
7 Housing Provision 13
7.1 Policy HP01: Housing Mix 13
7.2 Policy HP06: Standards for New Housing 13
8 Conclusion 15
8.1 Overall Conclusion 15

1 INTRODUCTION
1.1 Introduction
1.1.1 These representations are submitted by Gladman in response to the current consultation on the Brentwood Local Plan Pre-Submission Document. Gladman specialise in the promotion of strategic land for residential development with associated community infrastructure.
1.1.2 Gladman has considerable experience in the development industry across a number of sectors, including residential and employment development. From that experience, we understand the need for the planning system to provide local communities with the homes and jobs that are needed to ensure that residents have access to a decent home and employment opportunities.
1.1.3 Gladman also has a wealth of experience in contributing to the Development Plan preparation process, having made representations on numerous local planning documents throughout the UK and having participated in many Local Plan public examinations. It is on the basis of that experience that the comments are made in this representation.
1.1.4 Through this submission, Gladman have sought to highlight a number of issues with the Brentwood Local Plan. Gladman submit that the Council will need to carefully consider some of its policy choices and ensure that its evidence base is up-to-date and robust in light of changing circumstances and the changes brought about by the Revised National Planning Policy Framework (2019).
1.2 Context
1.2.1 The Revised Framework (2019) sets out four tests that must be met for Local Plans to be considered sound. In this regard, we submit that in order for it to be sound it is fundamental that the Thurrock Local Plan is:
* Positively prepared - providing a strategy which, as a minimum, seeks to meet the area's objectively assessed needs; and is informed by agreements with other authorities, so that unmet need from neighbouring areas is accommodated where it is practical to do so and is consistent with achieving sustainable development;
* Justified - an appropriate strategy, taking into account the reasonable alternatives, and based on proportionate evidence;
* Effective - deliverable over the plan period, and based on effective joint working on cross-boundary strategic matters that have been dealt with rather than deferred, as evidenced by the statement of common ground; and
* Consistent with national policy - enabling the delivery of sustainable development in accordance with the policies in the Framework.

2 NATIONAL PLANNING POLICY
2.1 National Planning Policy Framework
2.1.1 On 24th July 2018, the Ministry of Housing, Communities and Local Government (MHCLG) published the Revised National Planning Policy Framework which was subsequently updated in February 2019. These publications form the first revisions of the Framework since 2012 and implement changes that have been informed through the Housing White Paper, The Planning for the Right Homes in the Right Places consultation and the draft Revised Framework consultation.
2.1.2 The Revised Framework (2019) introduces a number of major changes to national policy and provides further clarification to national planning policy as well as new measures on a range of matters. Crucially, the changes to national policy reaffirms the Government's commitment to ensuring up-to-date plans are in place which provide a positive vision for the areas which they are responsible for to address the housing, economic, social and environmental priorities to help shape future local communities for future generations. In particular, paragraph 16 of the Revised Framework (2019) states that Plans should:
a) Be prepared with the objective of contributing to the achievement of sustainable development;
b) Be prepared positively, in a way that is aspirational but deliverable;
c) Be shaped by early, proportionate and effective engagement between plan-makers and communities, local organisations, businesses, infrastructure providers and operators and statutory consultees;
d) Contain policies that are clearly written and unambiguous, so it is evident how a decision maker should react to development proposals;
e) Be accessible through the use of digital tools to assist public involvement and policy presentation; and
f) Serve a clear purpose, avoiding unnecessary duplication of policies that apply to a particular area (including policies in this Framework, where relevant).
2.1.3 To support the Government's continued objective of significantly boosting the supply of homes, it is important that the Local Plan provides a sufficient amount and variety of land that can come forward where it is needed, that the needs of groups with specific housing requirements are addressed and that land with permission is developed without unnecessary delay .
2.1.4 In determining the minimum number of homes needed, strategic plans should be based upon a local housing need assessment, conducted using the standard method as set out in the PPG unless exceptional circumstances justify an alternative approach. It is imperative that the emerging Local Plan is formulated on the basis of meeting this requirement as a minimum.
2.1.5 Once the minimum number of homes that is required is identified, the planning authority should have a clear understanding of the land available in their area through the preparation of a strategic housing land availability assessment. In this regard, paragraph 67 sets out specific guidance that local planning authorities should take into account when identifying and meeting their housing need. It states:
"Strategic policy-making authorities should have a clear understanding of the land available in their areas through the preparation of a strategic housing land availability assessment. From this planning policies should identify a sufficient supply and mix of sites, taking into account their availability, suitability and likely economic viability. Strategic plans should identify a supply of:
a) specific, deliverable sites for years one to five of the plan , and
b) specific, developable sites or broad locations for growth, for years 6-10 and, where possible, for years 11-15 of the plan.
2.1.6 Once a local planning authority has identified its housing needs, these needs should be met in full, unless any adverse impacts would significantly and demonstrably outweigh the benefits of doing so . Local planning authorities should seek to achieve each of the economic, social and environmental dimensions of sustainable development, resulting in net gains across all three. Adverse impacts on any of these dimensions should be avoided, where significant adverse impacts are unavoidable, suitable mitigation measures should be proposed or, where this is not possible, compensatory measures should be considered.
2.1.7 To be considered sound at Examination the emerging Local Plan will need to meet all four of the soundness tests set out in paragraph 35 of the Revised Framework (2019).
2.2 Planning Practice Guidance
2.2.1 The Government published updates to its Planning Practice Guidance (PPG) on 13th September 2018. The updated PPG provides further clarity on how specific elements of the Revised Framework should be interpreted when preparing Local Plans. In particular, the updated Housing Needs Assessment chapter of the PPG confirms that the Revised Framework expects local planning authorities to follow the standard method for assessing local housing needs, and that the standard method identifies the minimum housing need figure and not a final housing requirement .
2.2.2 The calculation of objectively assessed needs (OAN) for housing has been a subject of much debate as part of Local Plan Examinations and s.78 appeals since its initial introduction through the Framework in 2012 with interested parties grappling with the issue of OAN with varying outcomes depending on local circumstances. To simplify the assessment the Government, through the Revised Framework has introduced the standardised method which should be undertaken through the 3-stage process outlined at paragraph 005 of the PPG .
2.2.3 Notwithstanding the above, it is important to note that whilst the standard methodology to assessing housing needs has been introduced, it is likely that this will be subject to further change. In this regard, it is currently anticipated that the standard method will be adjusted to ensure that the starting point in the plan-making process is consistent with the Government's proposals in Planning for the Right Homes in the Right Places consultation, to ensure that 300,000 homes are built per annum by the mid-2020s. This follows the release of the 2016 based household projections in September 2018, which forecast a lower level of household growth than previously envisaged.
2.2.4 It is therefore important that future iterations of the Local Plan take account of any changes to the standard method for calculating housing needs during the course of their preparation.
2.2.5 Whilst the PPG advises that the standard method is not mandatory, there is a possibility that other methods can be used in exceptional circumstances based on robust evidence in order to deviate from the standard method. Indeed, the PPG is clear that the standard method only identifies the minimum number of homes required to meet population needs and does not take into account the variety of factors which may influence the housing required in local areas such as changing economic circumstances or other factors which may change demographic behaviour. Where additional growth above historic trends are likely to occur, then local planning authorities should include an appropriate uplift to the housing numbers to meet the need in full. It is important that this uplift is undertaken prior to and separate from the consideration of the demographic baseline assessment of need and how much of this need can be accommodated in a housing requirement figure. Circumstances where the need to apply an uplift may be appropriate include, but are not limited to:
- Where growth strategies are in place, particularly where those growth strategies identify that additional housing above historic trends is needed to support growth or funding is in place to promote and facilitate growth (e.g. housing deals);
- Where strategic infrastructure improvements are planned that would support new homes;
- Where an authority has agreed to take on unmet need, calculated using the standard method from neighbouring authorities, as set out in a statement of common ground;
- Historic delivery levels where previous delivery has exceeded the minimum need identified it should be considered whether the level of delivery is indicative of greater housing need; and
- Where recent assessments such as Strategic Housing Market Assessments suggest higher levels of need than those proposed by a strategic policy making authority, an assessment of lower need should be justified.
2.2.6 In addition, it is important for local planning authorities to consider the implications of the standard method on delivering affordable housing need in full. The PPG is clear that the total affordable housing need should be considered in the context of its likely delivery as a proportion of mixed market and affordable housing developments, taking into account the probable percentage of affordable housing to be delivered by open market housing development. If it becomes clear that affordable housing need will not be delivered in full, then an increase to the total housing figures included in the plan should be considered where it could help to deliver the required number of the affordable homes.
2.2.7 In the event that an alternative approach is used it should only be considered sound if it exceeds the minimum starting point. The PPG is clear that any alternative approach with results in lower housing need figure than the standard method should be considered unsound as it does not meet the minimum housing need required.  
3 LEGAL REQUIREMENTS
3.1 Duty to Cooperate
3.1.1 The Duty to Cooperate (DtC) is a legal requirement established through section 33(A) of the Planning and Compulsory Purchase Act 2004, as amended by Section 110 of the Localism Act. The DtC requires local planning authorities to engage constructively, actively and on an ongoing basis with neighbouring authorities on cross-boundary strategic issues through the process of ongoing engagement and collaboration.
3.1.2 The Revised Framework (2019) has introduced a number of significant changes for how local planning authorities are expected to cooperate including the preparation of Statement(s) of Common Ground (SOCG) which are required to demonstrate that a plan is based on effective cooperation and has been based on agreements made by neighbouring authorities where cross boundary strategic issues are likely to exist. The Revised Framework (2019) sets out that local planning authorities should produce, maintain, and update one or more Statement(s) of Common Ground (SOCG), throughout the plan making process . The SOCG(s) should provide a written record of the progress made by the strategic planning authorities during the process of planning for strategic cross-boundary matters and will need to demonstrate the measures local authorities have taken to ensure cross boundary matters have been considered and what actions are required to ensure issues are proactively dealt with e.g. unmet housing needs.
3.1.3 As demonstrated through the outcome of the Coventry, Mid Sussex, Castle Point and St Albans examinations, if a Council fails to satisfactorily discharge its DtC a Planning Inspector must recommend non-adoption of the Plan. This cannot be rectified through modifications.
3.1.4 Gladman welcome the South Essex Authorities' commitment to the preparation of a Joint Strategic Plan (JSP) covering Basildon, Brentwood, Castle Point, Rochford, Southend-on-Sea and Thurrock. All of these authorities have significant strategic issues to contend with not least, the delivery of substantial housing and economic growth and the need to review Green Belt boundaries at a strategic scale.
3.1.5 It is however disappointing, that the JSP will not allocate specific sites which will be left for the individual Local Plans to take forward. The level of housing need in South Essex is significant and delivery has fallen substantially behind need for a long period of time. There is therefore an immediate need to address this situation; and for Local Plans to have to await the adoption of the JSP before sites are taken through the Local Plan process and finally released from the Green Belt, is simply going to result in inevitable further delay.
3.1.6 The JSP could release the strategic sites for development in partnership with the constituent authorities leaving a certain proportion of housing need to be addressed by the Local Plans on non-strategic sites. This would allow the release of Green Belt for development as early in the process as possible, thus meeting urgent need in an expedient manner.
3.1.7 The JSP also needs to follow a statutory plan preparation process with requisite consultation and examination to ensure that it has full weight in the planning process and to guide the preparation of the Local Plans on a formal basis. If the JSP is simply a non-statutory document, then there is the potential for changes over time in the other authorities to cause significant issues.
3.1.8 Beyond this commitment, there is very little evidence available setting out how Brentwood has discharged its Duty to Cooperate and what outcomes have been achieved through this process. This is especially pertinent because of the need to address unmet housing needs across the HMA.
3.2 Sustainability Appraisal
3.2.1 In accordance with Section 19 of the Planning and Compulsory Purchase Act 2004, policies set out in Local Plans must be subject to a Sustainability Appraisal (SA), and also incorporate the requirements of the Environmental Assessment of Plans and Programmes Regulations 2004 (the SEA regulations).
3.2.2 The SA/SEA is a systematic process that should be undertaken at each stage of the Plan's preparation, assessing the effects of the emerging Local Plan Review proposals on sustainable development when judged against all reasonable alternatives. The Council should ensure that the future results of the SA clearly justify its policy choices. In meeting the development needs of the area, it should be clear from the results of this assessment why some policy options have progressed, and others have been rejected. This must be undertaken through a comparative and equal assessment of each reasonable alternative, in the same level of detail for both chosen and rejected alternatives. The Council's decision-making and scoring should be robust, justified and transparent.

4 SPATIAL STRATEGY
4.1 Vision and Strategic Objectives
4.1.1 Gladman has concerns with certain elements of the Spatial Strategy that is being pursued through the Brentwood Local Plan (BLP).
4.1.2 The Plan sets out that one of the overarching driving factors behind the BLP is meeting the housing needs of the borough. However, the Council are using the 2016 Household Projections to calculate the housing needs of the borough which the Government have now confirmed is the incorrect data set to rely upon. Use of the 2014 Household Projections is likely to yield a higher housing requirement and therefore, the Council will need to address this issue before the Plan gets to Examination.
4.1.3 They also set out within the Settlement Hierarchy in Table 2.3 that the development of brownfield land will be prioritised. This requirement has no support in National Policy as Para 117 of the Revised Framework (2019) simply states that substantial weight should be given to the value of using suitable brownfield land. This requirement should therefore be changed to reflect Government guidance.
4.1.4 The prioritisation of brownfield land is also repeated in the Spatial Development Principles section under Paragraph 3.23 which similarly needs amending.
4.1.5 It is also disappointing that in the Vision and the Strategic Objectives, no mention is made of providing housing to meet the needs of the local population or of addressing one of the key challenges facing Brentwood, that of tackling housing affordability. It is therefore suggested that given the emphasis being placed by the Government on fixing the broken housing market, a further Strategic Objective is added to the Plan that specifically relates to the delivery of housing.

5 MANAGING GROWTH
5.1 Policy SP02: Managing Growth
5.1.1 The Council sets out in the pre-amble to Policy SP02 that they consider the housing need figure using the Standard Methodology is 350 dwellings per annum using the 2016 Household Projections published by ONS.
5.1.2 However, since the Local Plan was published, the Government has clearly set out that the 2016 Household Projections should not be used for the purposes of establishing the housing need figure under the standard methodology and that the 2014 Household Projections should be used instead.
5.1.3 The Council therefore needs to recalculate the housing need figure using the correct set of data so that it accords with the Framework and is not immediately found unsound on this basis.
5.1.4 It must also be recognised that the standard method only identifies the minimum number of homes required to meet population needs and does not take into account the variety of factors which may influence the housing required in a local area such as changing economic circumstances or other factors which may change demographic behaviour. Where additional growth above historic trends is likely to occur, then local planning authorities should include an appropriate uplift to the housing numbers to meet the need in full. It is important that this uplift is undertaken prior to and separate from, the consideration of how much of this need can be accommodated in the housing requirement.
5.1.5 The Council are seeking to provide an uplift to the base level of housing needs established through the Standard Method but this is intended to provide a buffer in the housing supply to ensure that the housing requirement is met or surpassed. It is not an uplift to take account of the circumstances listed in the PPG (see paragraph 3.1.5 above).
5.1.6 Gladman support the Council's inclusion of a 20% buffer in order to provide flexibility in supply as this will allow the Local Plan to adapt to changes in circumstances such as stalled sites, delay in delivery and sites which do not come forward as envisaged. This is especially important where Local Plans are predicated on the delivery of a small number of large-scale strategic sites.
5.1.7 However, we also consider that the housing requirement included within the Local Plan is not representative of the full housing needs of the area and that factors such as the high housing affordability ratio (11.23 in 2017), continuing economic growth and proximity to London should lead the Council to uplift the housing requirement figure above the minimum identified through the Standard Method. The Council would then still need to include a 20% buffer above this figure, in order to provide the flexibility needed to ensure the housing requirement is met or surpassed.
5.1.8 Gladman also has concerns regarding the Sequential Land Use approach which is set out in Paragraph 4.22 of the Local Plan. This is intended to be used as a Development Management tool to appraise proposals against a sequential land use hierarchy. However, we consider that this goes beyond the guidance set out in National Policy which seeks to maximise the use of brownfield land where possible and where it does not conflict with other policies in the Framework. It is also difficult to see how this approach would work in a Development Management context as applicants would have to demonstrate that there are no other suitable alternative sites which could accommodate the proposed development.
5.1.9 Policy SP02 also sets out a stepped approach to housing delivery within Brentwood which would equate to 310 dwellings per annum 2016-2023 and 584 dwellings per annum from 2023 onwards. Given that Brentwood has struggled to deliver homes over recent years and has in fact, failed to meet the requirements of the recently published Housing Delivery Test, resulting in the need for a 20% buffer to be applied, coupled with the fact that housing affordability in the borough is severe, must lead the Council to the conclusion that it has to address the backlog of housing needs as quickly as possible.
5.1.10 Implementing a stepped approach to the housing requirement will only lead to people having to wait longer for their housing needs to be met which, in the face of the Government's push to address the housing crisis, must be unacceptable.
5.1.11 The Council point to the fact that given the level of Green Belt constraint facing the borough, it is extremely difficult to achieve a five-year housing land supply. However, if the Council allocate a sufficient range and type of site in various locations across the borough, including small scale Green Belt releases, then there is no reason why housing needs cannot be met quicker thus maintaining a 5-year housing land supply.
5.1.12 Gladman do not consider that the Council has sufficient evidence to justify the implementation of a stepped approach to housing delivery and therefore consider the Local Plan to be unsound in this respect.
5.2 Policy SP04: Developer Contributions
5.2.1 Whilst Gladman has no specific comments on the content of Policy SP04, we would wish to voice concern over the myriad of policies contained in the Local Plan which may have implications for development viability. Many of the policies such as Policy SP05, BE01, BE02, BE03, BE09, BE10 etc have requirements within them that will impact on the viability of development schemes. It is unclear from the evidence provided whether the cumulative impact of all of these requirements has been considered through the Viability Study, which is a requirement set out at Paragraph 34 of the Framework to ensure that such policies do not undermine the deliverability of the Plan. This gap in evidence needs to be addressed by the Council to ensure that these policies are justified.

6 RESILIENT BUILT ENVIRONMENT
6.1 Policy BE02: Sustainable Construction and Resource Efficiency
6.1.1 Gladman are concerned with part (f) of Policy BE02 as it is too onerous and goes beyond National Policy. Part (f) requires all proposals to include commercial and domestic scale renewable energy and decentralised energy as part of new development. This is an extremely onerous requirement, particularly for small schemes where it may not be technically feasible. It could also have a huge impact on development viability.
6.1.2 Paragraph 153 of the Framework allows for planning policies to require development to include decentralised energy supply. However, it also provides a caveat that this is only where it is viable and feasible. Part (f) of Policy BE02 should therefore be amended to reflect this guidance.

7 HOUSING PROVISION
7.1 Policy HP01: Housing Mix
7.1.1 Policy HP01 contains a number of development requirements which would be applied to all new development including housing mix, accessible and adaptable dwellings and self and custom build homes.
7.1.2 If the Council wishes to adopt the discretionary accessible and adaptable homes standards as a policy requirement, then this should only be done in accordance with the Revised Framework footnote 46 i.e. where this would address an identified need for such properties and where the standards can be justified. The Written Ministerial Statement (WMS) dated 25th March 2015 stated that "the optional new national technical standards should only be required through any new Local Plan policies if they address a clearly evidenced need, and where their impact on viability has been considered, in accordance with the NPPG".
7.1.3 All new homes are built to Building Regulations Part M Category 1 Standards which include such adaptions as level approach routes, accessible front doors and wider internal doors and corridors. If the Government had intended that evidence of an aging population alone justified the adoption of the higher Part M Category 2 or 3 optional standard, then these would have been incorporated as mandatory into the Building Regulations.
7.1.4 We have been unable to locate where the evidence of a need for these standards is contained within the evidence base. Without this evidence, these requirements should be removed from the Local Plan.
7.1.5 Whilst the concept of Self Build and Custom Build Housing is supported, the inclusion of plots on large scale sites does not add to the supply of houses overall (it merely changes the housing mix from one product to another). It is also difficult to assess how it will be implemented given issues around working hours, site access, health and safety etc. that are associated with large scale development sites. The percentage of provision on sites should also be determined on detailed evidence of need and the provision of these plots should also be subject to viability testing.
7.2 Policy HP06: Standards for New Housing
7.2.1 Policy HP06 requires all residential development to have to comply with the Nationally Described Space Standards (NDDS).
7.2.2 If the Council wishes to adopt the NDSS as a policy requirement, then this should only be done in accordance with the Revised Framework footnote 46 i.e. where this would address an identified need for such properties and where the standards can be justified. The WMS dated 25th March 2015 stated that "the optional new national technical standards should only be required through any new Local Plan policies if they address a clearly evidenced need, and where their impact on viability has been considered, in accordance with the NPPG".
7.2.3 We have been unable to locate where the evidence of a need for these standards is contained within the evidence base. Without this evidence, these requirements should be removed from the Local Plan.


8 CONCLUSION
8.1 Overall Conclusion
8.1.1 Critical to the success of the South Essex area will be the timely production of the JSP which will define the major growth areas to meet the housing and employment needs across the area and will inform the preparation of the individual Local Plans.
8.1.2 It is essential that through this process, the full needs for housing and employment are met in the areas that people want to live. It is also imperative that the major policy constraint of Green Belt is reviewed in a strategic manner which allows full need to be met and ensures that the new boundaries endure beyond the JSP plan period.
8.1.3 The impact of London will have a heavy influence on the future developments needs of the area and this must also be taken fully into account through the preparation of the JSP.
8.1.4 It is also considered that in order to give the JSP the weight it needs to ensure that the constituent Local Plans deliver its outcomes, the JSP should be a statutory plan which follows the requisite plan preparation process of consultation and subsequent examination.
8.1.5 Gladman have some fundamental concerns with the BLP, particularly with the identification of the level of housing need in the Plan and the implementation of a stepped approach to housing delivery, which would render the BLP unsound if they are not addressed.
8.1.6 Gladman therefore request the right to participate in any forthcoming Local Plan Examination to discuss these concerns orally.

Attachments:

Object

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

Representation ID: 23888

Received: 19/03/2019

Respondent: Redrow Homes

Agent: Pegasus Group

Legally compliant? No

Sound? No

Duty to co-operate? Yes

Representation Summary:

The NPPF and NPPG are clear that the space standards can be used where there is clear need for the standards to be applied. The supporting text of HP06 refers to the need being identified in the Council's AMR. But the AMR and other evidence document contain no such reference. No assessment has been undertaken regarding the implications of delivering these standards on development. Larger properties have the potential to reduce the yield and/or result in the loss of land required to meet other standards, i.e. on-site open space, and potentially lead to failure to meet housing needs.

Change suggested by respondent:

The Council must either delete the requirement to comply with the technical standards or else provide the evidence necessary to support the policy and demonstrate the implications for development densities. This evidence should be clearly referenced in the supporting text of the policy.

Full text:

BE04
Criterion B(c) of this policy requires the application of the heat hierarchy to all development proposals. This is an unreasonable and unnecessary burden to apply to all developments that is not supported by national policy or the evidence base. Furthermore, it could limit the deliverability of proposals where existing CHP/CCHP facilities are not available and where the cost of developing an on-site facility is prohibitive. It is not reasonable to expect a developer to factor the cost of such an onerous requirement into the development economics for a site and to then have to demonstrate the viability issues surrounding it. It is suggested that such a feature is only justifiable on the largest of the strategic sites proposed in the district and is not relevant to the majority of the site allocations.
Amend criterion B(c) to clarify that such a requirement is only applicable to schemes of 500 residential units or more.
BE10
Criterion C of this policy requires the developer to make alternative arrangements for broadband provision where a provider has identified that superfast broadband is not practical. This shifts the burden of responsibility from the provider - who is paid to provide a service - to the developer. The developer is unlikely to be a broadband provider and as such this is an unreasonable requirement that is not supported by national policy. Furthermore, the viability work in the evidence base does not provide a sufficiently robust assessment of the likely costs of providing this and therefore the impact on the viability of the proposed allocation has not been adequately assessed. This is unsurprising as the likely work is unknown and this only serves to highlight the unreasonableness of the request.
For the reasons explained above, amend criterion C(a) to require a developer to ensure that the design of the development allows for the provision of broadband service via an alternative technology provider rather than require the developer to actually provide the facility.
BE16
The wording of criterion A does not reflect the wording of the NPPF at paragraph 109, which reads:
"Development should only be prevented or refused on highways grounds if there would be an unacceptable impact on highway safety, or the residual cumulative impacts on the road network would be severe." It is therefore inconsistent with national policy.
For the reasons explained above, criterion A should be amended to read: Developments should not give rise to an unacceptable impact on highway safety and the residual cumulative impacts on the road networks should not be severe.
BE18
Criterion B(a) requires development proposals to dictate the decision-making process. It is assumed that this is an error in drafting and that it will be for the Council to ensure that the requirements referred to are factored into the decision-making process. Such a requirement is best-placed in the supporting text with clarification that it will be the way in which the Council will handle decision-making.
Criterion B(f) requires improvements to be made to the water environment. Such a requirement is not justified by national policy as it is not for development proposals to resolve existing issues - development proposals can only mitigate the impact of the development proposed.
Criterion B(g) requires development proposals to eliminate misconnections between foul and surface water networks. This can only be achieved where the whole site is being redeveloped and it cannot remove misconnections that are outside of the developers control. The wording of this criterion is not clear about the remit of the development proposal.
The concerns raised must be addressed as criterion C seeks financial contributions where the measures required are not possible. As worded, some of these requirements are not relevant to the development proposal or deliverable by the developer and therefore it would be unreasonable to seek financial contributions to such works.
For the reasons explained above:
* Delete criterion B(a) and add to the supporting text with clarification that this is how the Council will approach decision-making.
* Remove the reference to improving the water environment in criterion B(f) as a requirement for all development proposals
* Amend criterion B(g) to make it clear that the requirement relates the connections within the development site where the development proposals relate.
BE20
This policy, as written, requires the provision of allotments/growing space as part of any residential development. Neither the policy nor the supporting text identifies the scale of development where this policy would be applicable. Such a requirement will not be feasible on some allocated sites where site constraints mean that the area of developable land is reduced and where the scale of development does not support the provision of land for such a use.
It is considered an unreasonable and unnecessary requirement for any scale of residential development and should be restricted to the larger allocation sites of 500 units or more.
It is considered that this blanket requirement will reduce the development yield of individual allocation sites thereby creating a situation where the allocations do not deliver the number of units identified and contributing to the failure of the plan to meet the identified housing requirement. This would conflict with national policy.
For the reasons explained above, amend the policy to identify that the requirement relates to schemes of 500 units or more.
BE22
The policy identifies the potential for proposals to provide financial contributions towards new or improved facilities in the borough. Although it is noted that the sentence includes the phrase 'where appropriate' it is considered that the policy should make clear that the contributions will go towards facilities that are directly related to the development proposal to mitigate the impacts rising. It would not, for example, be appropriate or consistent with national policy if the contributions were for the improvement of play facilities that the residents of a proposed residential scheme would be unlikely - through proximity - to utilise or have an impact upon.
For the reasons explained above, amend criterion A to make it clear that the financial contributions will relate to facilities that are directly related to the development proposals and the impacts arising.
HP06
Footnote 46 of the NPPF is clear that the optional technical space standards can be used where there is clear need for the standards to be applied. This is reinforced by the PPG. The supporting text for the policy refers to the need being identified in the Council's AMR. The AMR available on the Council's website does not appear to make reference to any such need being identified and there is no other document in the evidence base to demonstrate the need for the application of these standards has been identified and tested.
Furthermore, there is no evidence that an assessment has been undertaken regarding the implications of delivering these standards on the density of development. This is significant as larger properties have the potential to reduce the likely yield achievable and/or result in the loss of land required to meet other standards, such as on-site open space requirements. This gives rise to the potential for the plan to fail to meet the identified housing needs and would render it ineffective.
For the reasons explained above, the Council must either delete the requirement to comply with the technical standards or else provide the evidence necessary to support the policy and demonstrate the implications for development densities. This evidence should be clearly referenced in the supporting text of the policy.
NE03
The wording of this policy is such that it would prevent the loss of any tree or hedgerow within the development site. This is significant as many of the allocated sites include existing trees/hedgerows that are arguably of some value and will have some ecological value. The loss of such trees/hedgerows may be necessary to secure the satisfactory development of the site and deliver the level of development envisaged by the allocation.
It is sensible therefore that the policy reflects the potential for the impact of the loss of some trees/hedgerows to be outweighed by other benefits arising from the development proposal.
This would be consistent with national policy and ensure that the plan can deliver the level of development that has been identified as necessary. Failure to recognise this could render the plan ineffective.
For the reasons explained above, amend the policy to acknowledge that the adverse impacts arising from the loss of trees, woodlands and hedgerows will be balanced against the benefits arising from the development, especially where allocated for development. The wording of the policy can still identify a preference to retain such features within development proposals but must acknowledge the potential for some losses to be inevitable in order to deliver the site allocations or secure an otherwise satisfactory development.
NE12
Criterion A(d) requires the provision of community benefits in order to redevelop PDL in the Green Belt. This is not a requirement set out in paragraph 145 of the NPPF and therefore it is inconsistent with national policy.
Criterion A(e) requires the provision of travel links. This is a potentially onerous requirement for the scale of development that may be proposed and again is not a requirement set out in paragraph 145 of the NPPF. It is therefore inconsistent with national policy.
Delete Criteria A(d) and (e) in order to comply with the NPPF.
NE13
Criterion A of this policy requires the delivery of significant community benefits and the wording of the supporting text advises that this is to 'repay' the loss of Green Belt land. The Council has identified Green Belt land for development as it does not have
sufficient non-Green Belt land to meet the identified housing need. The release of these sites is therefore required to meet these needs and by doing so will self-evidently provide significant community benefits. The requirement for additional provision above and beyond this suggests that the developer has a choice of sites to develop, which is clearly not the case as other non-Green Belt sites would be identified if it were.
This requirement is therefore unreasonable, unjustified and inconsistent with national policy.
Criterion B advises that allocated sites 'will be' deallocated from the Green Belt. As the removal of land from the Green Belt can only come about through the preparation of a development plan this de-allocation must happen upon adoption of the plan and not presented as a future intention.
For the reasons explained above, delete criterion A and amend 'will be' in criterion B to 'are'.
SP01
The wording of criterion D(d) does not reflect the wording of the NPPF at paragraph 109, which reads:
Development should only be prevented or refused on highways grounds if there would be an unacceptable impact on highway safety, or the residual cumulative impacts on the road network would be severe.
It is therefore inconsistent with national policy.
To reflect paragraph 109 of the NPPF, criterion D(d) should be amended to read:
d. ensures the proposal would not give rise to an unacceptable impact on highway safety, or give rise to a severe residual cumulative impact on the road network.
SP02
The housing requirement set out in the policy is based on an out-of-date method for calculating the LHN. The supporting text indicates a figure that relates to the 2016 HHP when the most recent advice is that the 2014 HHP should be used. This is significant as the Council has chosen to add a buffer to this figure to allow for the supply of housing to be maintained.
The 2014 HHP with the 2017 affordability ratios applied reveal that the base need is 452 rather than 350 as the Plan states. Although this is broadly similar to the 456 per annum figure allowed for in the policy, it does not allow for the buffer that the Council has considered necessary.
This raises potential consistency issues with national policy that may influence the ability of the plan to deliver the housing required to fulfil the identified need.
For the reasons explained above, the justification for the housing requirement figure will need to be reviewed and updated accordingly. The Council will need to ensure that it can robustly defend the figure that it has put forward. The current wording of the supporting text and the evidence base referred to does not currently provide a robust defense.
SP03
The policy presents an unnecessary burden on those developers bringing forward allocated sites where the infrastructure capacity on an area should have already been identified through the plan-making process, as required by the PPG. It is considered that HIA should be confined to strategic sites (500 units or more) to reflect the fact that, in line with the PPG, they are required where significant impacts are anticipated.
Other impacts referred to in the policy are a standard part of the development management process and do not warrant a further assessment to be included with the application. These are adequately summarised in criterion A of the policy.
Furthermore, the criterion C places the burden of delivery of health and social care facilities on the developer. The developer is unlikely to be a health and social care provider and therefore cannot reasonably be expected to deliver such facilities.
It is also important to acknowledge that the developer of an individual site cannot be expected to address existing deficiencies in an area. This is important as it may be that such facilities are entirely absent in any area where development is allocated despite the existence of an existing need. In such case, the wording of the policy means that a developer could be required to provide more than is necessary to mitigate the impacts arising from the development.
The issues identified above raise conflicts with national policy and could prejudice the deliverability of individual sites, thereby undermining the effectiveness of the Plan.
For the reasons explained above:
* Amend criterion C to raise the threshold to 500.
* Remove the requirement for the developer to deliver the necessary health and social care facilities
* Ensure that it is clear that the developer is only expected to contribute to improvements necessary to mitigate the impact of the development where such facilities are already in place.
SP04
Criterion A of the policy expects developers to guarantee the sustained provision of infrastructure. It is important to recognise that developers are rarely the infrastructure provider and therefore have no control over the sustained provision of the infrastructure that they contribute to.
The responsibility for sustained provision rests with the infrastructure provider and this should not be transferred to the developer. To do so conflicts with national policy.
Criterion F requires a Financial Viability Assessment where there is conflict with planning policy requirements. It does not specify which policy conflicts would trigger this need and so as currently written would apply to any such conflict. This presents an unreasonable and unnecessary burden for a developer where the conflict arises because it of feasibility issues rather than viability issues. There may also be sound material considerations for departing from a particular policy and those reasons may have nothing to do with viability. The blanket requirement for such an assessment is contrary to the PPG and national policy.
For the reasons explained above, remove the last sentence of criterion A and amend criterion F to confirm what policy conflicts trigger the need for a viability assessment.
SP06
The policy does not define what it considers to be a 'large complex allocation site' and as such could impose a blanket requirement for the submission of a masterplan and a design code as part of the submission for all allocated sites. This is considered to be an unreasonable and unnecessary burden that is not supported by the NPPF or the PPG and is not justified by the individual site allocations.
It also has the potential to slow down the delivery of sites, which for a borough with a poor track record of delivery is not sensible.
For the reasons explained above, clarify in the policy which of the allocated sites fall within the definition of a 'large complex allocation site'.
The issues raised are complex and would benefit from discussion at the Examination.

Attachments:

Object

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

Representation ID: 24005

Received: 19/03/2019

Respondent: CALA Homes

Agent: JB Planning Associates Ltd.

Legally compliant? No

Sound? No

Duty to co-operate? Yes

Representation Summary:

The policy is not supported by detailed local evidence to support the imposition of the national space standard. Table 8.3 o the Local Plan Viability Assessment (October 2018) Additional Costs of Building to the draft Approved Document M amendments included at Appendix B4' identified costs based upon national 2014 prices, which are 5 years out of date. We further note the reference on p.102 of the Viability Assessment which states "through the September 2018 consultation s ome concern was expressed about the need for this policy. It is beyond the scope of this study to consider need"

Change suggested by respondent:

In the absence of any detailed local evidence to demonstrate the need for setting a local space standard, or evidence that it would be viable for developments of less than 500 dwellings, paragraph A of the policy should be deleted.

Full text:

Policy
HP01 : Housing Mix
Summary of Representation
1. This representation has been prepared on behalf of CALA Homes (North Home Counties) Ltd in support of the proposed allocation of its land adjacent to the A12 Ingatestone site for 57 homes (Policy R22).
2. The representation seeks minor amendments to the wording of Policy HP01 and its supporting text in order to comply with national policy.
Policy HP01: Housing Mix
3. Paragraph 61 of the NPPF refers to the need for planning policies to reflect assessments of local need including in relation to affordable housing and people wishing to commission or build their own homes:
"61. Within this context, the size, type and tenure of housing needed for different groups in the community should be assessed and reflected in planning policies (including, but not limited to, those who require affordable housing, families with children, older people, students, people with disabilities, service families, travellers, people who rent their homes and people wishing to commission or build their own homes1)".
4. Paragraph 64 of the NPPF specifies that where major development involving the provision of housing is proposed, planning policies and decisions should expect at least 10% of the homes to be available for affordable home ownership. Exemptions to this 10% requirement should also be made where the site or proposed development:
provides solely for Build to Rent homes;
provides specialist accommodation for a group of people with specific needs (such as purpose-built accommodation for the elderly or students);
is proposed to be developed by people who wish to build or commission their own homes; or
is exclusively for affordable housing, an entry-level exception site or a rural exception site. 5. The Planning Practice Guidance (PPG) reference to when planning obligations can be sought by the local planning authority has very recently been revised2: "Planning obligations assist in mitigating the impact of unacceptable development to make it acceptable in planning terms. Planning obligations may only constitute a reason for granting planning permission if they meet the tests that they are necessary to make the development acceptable in planning terms, directly related to the development, and fairly and reasonably related in scale and kind. These tests are set out as statutory tests in the Community Infrastructure Levy Regulations 2010 and as policy tests in the National Planning Policy Framework (See related policy: National Planning Policy Framework paragraph 56)". 6. We consider that in accordance with the PPG, the policy wording should refer to the Council 'seeking' rather than 'requiring' the provision of different community benefits. 7. With regard to 'what accessibility standards can local planning authorities require from new development?' the Planning Practice Guidance (PPG) states3: 2 Paragraph: 002 Reference ID: 23b-002-20190315 3 Paragraph: 008 Reference ID: 56-008-20160519
"Where a local planning authority adopts a policy to provide enhanced accessibility or adaptability they should do so only by reference to Requirement M4(2) and/or M4(3) of the optional requirements in the Building Regulations and should not impose any additional information requirements (for instance provision of furnished layouts) or seek to determine compliance with these requirements, which is the role of the Building Control Body. They should clearly state in their Local Plan what proportion of new dwellings should comply with the requirements. There may be rare instances where an individual's needs are not met by the wheelchair accessible optional requirement - see paragraph 011 below. Local Plan policies should also take into account site specific factors such as vulnerability to flooding, site topography, and other circumstances which may make a specific site less suitable for M4(2) and M4(3) compliant dwellings, particularly where step free access cannot be achieved or is not viable. Where step-free access is not viable, neither of the Optional Requirements in Part M should be applied".
8. We consider that the Council has failed to demonstrate that the requirement set out in paragraph A (a)(ii) of the policy for every dwelling built on all residential developments of 10 or more dwellings to be constructed to meet requirement M4(2) accessible and adaptable dwellings, unless they are built in line with M4(3) wheelchair adaptable dwelling standard, is actually justified in terms of either need or viability.
9. We note 'Table 8.3: Additional Costs of Building to the draft Approved Document M amendments included at Appendix B4' within the Local Plan Viability Assessment (October 2018) identified costs based upon 2014 prices for category 2 dwellings of up to £940 per dwelling and prices for category 3 dwellings of up to £23,052 per dwelling (these national prices now being 5 years out of date). These were published in March 2015 with the proposed national housing space standards.
10. We further note the reference on p.102 of the Viability Assessment which states "through the September 2018 consultation some concern was expressed about the need for this policy. It is beyond the scope of this study to consider need".
11. Paragraph 6.4 of the Draft Plan makes it clear that in terms of housing-mix proposals, regard should be had to the findings of the latest Strategic Housing Market Assessment (SHMA) and other relevant up-to-date local evidence. It explains that this will be used to inform negotiations between the Council and developers to determine the appropriate mix of housing. Furthermore, it emphasises that the final mix of housing types will be subject to negotiation with the applicant.
12. We believe it to be crucial that the Council is fully committed to ensuring that the housing mix policy will be implemented in a flexible manner, and not seek to apply a 'one size fits all' approach to all sites across the Borough. Accordingly, regard should be had to the findings of the Authority Monitoring Report (AMR) and more localised market information, given that different types of housing mixes will be appropriate in different parts of the Borough depending on localised housing markets and recent types of housing provision.
Conclusions
13. The policy is overly prescriptive and does not accord with national policy. It fails to adequately reflect dispensations from these housing requirements in respect of specific types of residential development. The policy would benefit by amendments which would bring it in line with national policy.
14. The policy should be amended by the deletion of references to 'require' and their replacement with 'seek' in order to provide greater flexibility and reflect the fact that the policy requirements should not be so rigid that they fail to take adequate account of other competing policy requirements and overall viability.
15. It is particularly important to note that the Housing Delivery Test 2018 measurement (February 2019) identifies that against an annual target of 655 dwellings, over the past 3 years it has only delivered 1,509 dwellings against a target figure of 1,965 dwellings. As a consequence of only delivering 77% of its housing target figure, the Council's 5-year land supply is now to be subjected to a 20% buffer.
16. Consequently, it is vital that Brentwood Borough Council does not implement policies which threaten housing delivery due to their high associated costs or the fact that their actual final development costs would be uncertain, particularly given that the meaning of the word 'significant' is open to wide possible interpretation. It should also be noted that the associated costs of such potential provision will not have been properly examined within either the Sustainability Appraisal or Viability Assessment.
Test of Soundness
17. In view of the above considerations, we consider that the Local Plan is not sound, because it is not fully 'consistent with national policy, as it fails to have direct regard to viability. The Plan needs to be amended so that it provides greater flexibility. Consequently, in its present shape, it will be neither 'justified', nor 'effective', as it will not represent the most appropriate strategy, when considered against the reasonable alternatives.
Proposed modifications
18. The following amendments are proposed to the supporting text of Policy HP01:
6.4 The Council's Strategic Housing Market Assessment (SHMA) Part 2 (2016) provides a detailed assessment of the housing required to meet existing and future needs across the borough. Proposals should respond to other up-to-date and relevant local evidence where available, such as the Council's Housing Strategy, AMR and more localised market information.
19. The following amendments are proposed to the text of Policy HP01:
A. All new development should deliver an inclusive, accessible environment throughout.
a. On residential development proposals of 10 or more (net) additional dwellings the Council will seek:
i. an appropriate mix of dwelling types, sizes and tenures to take account of meet the identified housing needs in the borough as set out in the Strategic Housing Market Assessment or any similar evidence for market and affordable units (such as the Council's Housing Strategy, AMR and localised market information), to provide choice, and contribute towards the creation of sustainable, balanced and inclusive communities; and
b. On developments of 60 or more (net) dwellings the Council will seek the above, and:
i. a minimum of 5% of new affordable dwellings should be built to meet requirement M4(3) wheelchair accessible dwellings of the Building
Regulations 2015, or subsequent government standard.
c. On development sites of 500 or more dwellings the Council will seek all of the above, and:
i. a minimum of 5% self-build homes which can include custom housebuilding; and
ii. provision for Specialist Accommodation taking account of local housing need in accordance with the criteria set out in Policy HP04
Specialist Accommodation.
B. Where a development site has been divided into parts, or is being delivered in phases, the area to be used for determining whether this policy applies will be the whole original site.
C. The inclusion of self-build and custom build homes and Specialist Residential Accommodation on smaller sites will also be encouraged.
Policy
H P 05 : Affordable Housing
Summary of Representation
1. This representation has been prepared on behalf of CALA Homes (North Home Counties) Ltd in support of the proposed allocation of its land adjacent to the A12 Ingatestone site for 57 homes (Policy R22).
2. The representation seeks minor amendments to the wording of Policy HP05: Affordable Housing in order to provide greater flexibility.
Policy HP05: Affordable Housing
3. We support the policy's aim of seeking to deliver as much affordable housing as is possible given the local need for it. However, it is important that the Council also gives adequate regard to viability and the overall cost of adhering to all other Local Plan policy and site-based requirements. 4. The Planning Practice Guidance (PPG) reference to when planning obligations can be sought by the local planning authority has very recently been revised1: "Planning obligations assist in mitigating the impact of unacceptable development to make it acceptable in planning terms. Planning obligations may only constitute a reason for granting planning permission if they meet the tests that they are necessary to make the development acceptable in planning terms, directly related to the development, and fairly and reasonably related in scale and kind. These tests are set out as statutory tests in the Community Infrastructure Levy Regulations 2010 and as policy tests in the National Planning Policy Framework (See related policy: National Planning Policy Framework paragraph 56)".
5. We consider that in accordance with the PPG, the policy wording should refer to
the Council 's eeking' rather than 'requiring' the provision of different community
benefits.
6. Consequently, we do not believe that it is appropriate to state in paragraph A. that the Council will require the provision of 35% of the total number of residential units to be provided and maintained as affordable housing within all new development sites on proposals of 11 or more (net) units or sites of 10 or less units which have a combined gross internal floorspace in excess of 1,000 square metres.
7. Neither do we believe that it is appropriate to state in paragraph B.(a) that the Council will require that the tenure split be made up of 86% Affordable/Social Rent and 14% as other forms of affordable housing (including starter homes, intermediate homes, shared ownership and all other forms of affordable housing). It is not evident from reading the content of the Pba Strategic Housing Market Assessment - Part 1 (October 2018) what the precise justification for these tenure split figures is. Nor is it evident whether they have been properly scrutinised with regard to viability.
8. The policy goes on to specify that 35% of the total number of residential units to be provided and maintained as affordable housing within all new development sites on proposals of 11 or more (net) units or sites of 10 or less units which have a combined gross internal floorspace in excess of 1,000 square metres.
9. We believe that the current policy wording set out in paragraphs A and B is too inflexible and fails to take adequate account of both viability and the fact that affordable housing requirements will inevitably change over the course of the Plan period as different products emerge and rates of affordable housing need change.
10. We note also that paragraph G. states that the requirement to provide affordable housing will apply to all residential development falling under use class C3 with the exception of Gypsy & Traveller Pitches or Travelling Showman Plots. This is contrary to national policy as set out in the NPPF.
11. Paragraph 63 of the NPPF states that provision of affordable housing should not be sought for residential developments that are not major developments, other than in designated rural areas (where policies may set out a lower threshold of 5 units or fewer). To support the re-use of brownfield land, where vacant buildings are being reused or redeveloped, any affordable housing contribution due should be reduced by a proportionate amount.
12. Paragraph 64 of the NPPF specifies that where major development involving the provision of housing is proposed, planning policies and decisions should expect at least 10% of the homes to be available for affordable home ownership. Exemptions to this 10% requirement should also be made where the site or proposed development:
* provides solely for Build to Rent homes;
* provides specialist accommodation for a group of people with specific needs (such as purpose-built accommodation for the elderly or students);
* is proposed to be developed by people who wish to build or commission their own homes; or
* is exclusively for affordable housing, an entry-level exception site or a rural exception site.
Conclusions
13. The policy is overly prescriptive and does not accord with national policy. It fails to adequately reflect exceptions from these affordable housing requirements in respect of specific types of residential development. The policy would benefit by minor amendments which would bring it in line with national policy.
14. The amendments should include the deletion of references to 'require' and their replacement with 'see k' in order to provide greater flexibility and reflect the fact that the policy requirements should not be so rigid that they fail to take adequate account of other competing policy requirements and overall viability.
15. We note that paragraph 6. 4 of the Draft Plan makes it clear that in terms of housing mix proposals, regard should be had to the findings of the latest Strategic Housing Market Assessment (SHMA) and other relevant up to date local evidence. It explains that this will be used to inform negot iations between the Council and developers to determine the appropriate mix of housing.
Furthermore, it emphasises that the final mix of housing types will be subject to negotiation with the applicant.
16. We believe it to be crucial that the Council is full y committed to ensuring that the affordable housing policy will be implemented in a flexible manner, and not seek to apply a one size fits all approach to all sites across the Borough. Accordingly, regard should be had to the findings of the Authority Moni toring Report (AMR) and more localised information, given that different types of affordable housing provision will be appropriate in different parts of the Borough depending on localised housing markets , and other policy and infrastructure requirements .
Test of Soundness
17. In view of the above considerations, we consider that the Local Plan is not sound, because it is not fully 'consistent with national policy , as it fails to have direct regard to viability. The Plan needs to be amended so that it provid es greater clarity regarding affordable housing provision requirements. Consequently, in its present shape, it will be neither ' justified', nor ' effective', as it will not represent the most appropriate strategy, when considered against the reasonable alte rnatives.
Proposed modifications
18. The following amendments are proposed to the text of Policy HP05:
A. The Council will seek require the provision of 35% of the total number of residential units to be provided and maintained as affordable housing within all new residential development sites on proposals of 11 or more (net) units or sites of 10 or less units which have a combined gross internal floorspace in excess of 1,000 square meters.
B. In considering the suitability of affordable housing, the Council will seek that: the tenure split be made up of 86% Affordable/Social Rent and 14% as other forms of affordable housing (this includes starter homes, intermediate homes and shared ownership and all other forms of affordable housing as described by national guidance or legislation) or regard to the most up to date SHMA, AMR and localised market information; b. the affordable housing be designed in such a way as to be seamlessly integrated to that of market housing elements of a scheme (in terms of appearance, build quality and materials) and distributed throughout the development so as to avoid the over concentration in one area; and c. the type, mix, size and cost of affordable homes will reflect meet the identified housing need as reported by the Council's most up-to-date Strategic Housing Market Assessment, AMR, localised market information and Housing Strategy.
C. In seeking affordable housing provision, the Council will have regard to scheme viability; only where robust viability evidence demonstrates that the full amount of affordable housing cannot be delivered, the Council will negotiate a level of on-site affordable housing that can be delivered taking into account the mix of unit size, type and tenure and any grant subsidy received.
D. The Council will only accept a financial contribution in lieu of on-site provision where it can be satisfactorily demonstrated that on-site provision is neither feasible nor viable.
E. Where a site has been sub-divided or is not being developed to its full potential so as to fall under the affordable housing threshold, the Council will seek a level of affordable housing to reflect the provision that would have been achieved on the site as a whole had it come forward as a single scheme for the allocated or identified site.
F. Planning obligations will be used to ensure that the affordable housing will remain at an affordable price for future eligible households, or for the subsidy to be recycled to alternative affordable housing provision.
G. In accordance with national policy, the requirement to provide affordable housing will apply to all qualifying residential development.
Policy
HP06 : S pace Standards for New Housing
Summary of Representation
1. This representation has been prepared on behalf of CALA Homes (North Home Counties) Ltd in support of the proposed allocation of its land adjacent to the A12 Ingatestone site for 57 homes (Policy R22).
2. The representation seeks amendments to the wording of Policy HP06 in order to comply with national policy.
National Policy
3. The national Planning Practice Guidance (PPG) states that in relation to 'what optional technical housing standards can local planning authorities set?' that local planning authorities have the option to set additional technical requirements exceeding the minimum standards required by Building Regulations in respect of access and water, and an optional nationally described space standard. Local planning authorities will need to gather evidence to determine whether there is a need for additional standards in their area, and justify setting appropriate policies in their Local Plans1.
4. In consideration of 'how should local planning authorities assess viability concerns for setting optional Building Regulation requirements and the nationally described space standard?', the PPG specifies that local planning authorities should consider the impact of using these standards as part of their Local Plan viability assessment. In considering the costs relating to optional Building Regulation requirements or the nationally described space standard, authorities may wish to take account of the evidence in the most recent Impact Assessment issued alongside the Housing Standards Review2.
5. The PPG goes on to state that: "Where a need for internal space standards is identified, local planning authorities should provide justification for requiring internal space policies. Local planning authorities should take account of the following areas: * need - evidence should be provided on the size and type of dwellings currently being built in the area, to ensure the impacts of adopting space standards can be properly assessed, for example, to consider any potential impact on meeting demand for starter homes. * viability - the impact of adopting the space standard should be considered as part of a plan's viability assessment with account taken of the impact of potentially larger dwellings on land supply. Local planning authorities will also need to consider impacts on affordability where a space standard is to be adopted. * timing - there may need to be a reasonable transitional period following adoption of a new policy on space standards to enable developers to factor the cost of space standards into future land acquisitions"3.
Policy HP06: Space Standards for New Housing
6. Table 1: Monitoring Framework: Broad parameters for monitoring policy implementation specifies that in respect of Policy HP06 internal spaces are to be above minimum standards in national space standards. It specifies that the monitoring target is 100% of new homes at or above minimum standards.
7. We note 'Table 8.3: Additional Costs of Building to the draft Approved Document M amendments included at Appendix B4' within the Local Plan Viability Assessment (October 2018) identified costs based upon national 2014 prices for category 2 dwellings of up to £940 per dwelling and prices for category 3 dwellings of up to £23,052 per dwelling (these national prices now being 5 years out of date). These were published in March 2015 with the proposed national space standard.
8. We further note the reference on p.102 of the Viability Assessment which states "through the September 2018 consultation s ome concern was expressed about the need for this policy. It is beyond the scope of this study to consider need"
9. Paragraph 8.24 states that in the Viability Study the units are assumed to be in excess of these National Space Standards.
Conclusions
10. The policy is not supported by detailed local evidence to support the imposition of the national space standard. Consequently, the policy would benefit by a mendments which would bring it in line with national policy.
Test of Soundness
11. In view of the above co nsiderations, we consider that the Local Plan is not sound, because it is not fully 'consistent with national policy , as it fails to have direct regard to viability. The Plan needs to be amended so that it provides greater clarity regarding affordable hous ing provision requirements. Consequently, in its present shape, it will be neither ' justified', nor ' effective', as it will not represent the most appropriate strategy, when considered against the reasonable alternatives. Nor has the Local Plan been 'posit ively prepared'.
Proposed modifications
12. In the absence of any detailed local evidence to demonstrate the need for setting a local space standard, or evidence that it would be viable for developments of less than 500 dwellings, paragraph A of the policy should be deleted.
Policy
NE13 : Site Allocations in the Green Belt
Summary of Representation
1. This representation has been prepared on behalf of CALA Homes (North Home Counties) Ltd in support of the proposed allocation of its land adjacent to the A12 Ingatestone site for 57 homes (Policy R22).
2. The representation seeks amendments to the wording of Policy NE13 in order to comply with national policy.
National Policy
3. When considering the soundness of Policy NE13, it is very important to have careful regard to national policy.
4. Paragraph 56 of the NPPF states that Planning Obligations must only be sought where they meet all of the following tests1:
a) necessary to make the development acceptable in planning terms;
b) directly related to the development; and
c) fairly and reasonably related in scale and kind to the development.
5. Paragraph 138 of the NPPF specifies that Plans should set out ways in which the impact of removing land from the Green Belt can be offset through compensatory improvements to the environmental quality and accessibility of remaining Green Belt land.
6. The Framework goes on in paragraph 139 to refer to the importance of meeting identified development needs and being able to demonstrate that Green Belt boundaries will not need to be altered at the end of the Plan period.
Policy NE13: Site Allocations in the Green Belt
7. The policy specifies that sites allocated to meet housing needs in the Green Belt will be expected to provide significant community benefits, both for surrounding existing communities and those moving into new homes on site.
8. The supporting text explains that this policy is in place to ensure the cost of losing some Green Belt is repaid through significant benefits to new and existing communities, and to capture the uplift in land value for local benefit. It goes on to state that these benefits are likely to be for different needs depending upon the area, but could involve new community facilities, open space for public use, play areas, and investment in existing facilities. Reference is also made to development needing to contribute to local education and healthcare.
9. We strongly contend that the policy requirements fail to accord with what is required by national planning policy, particularly with regard to the tests for seeking Planning Obligations set out in Paragraph 56 of the NPPF. It would be both inappropriate and unreasonable to expect developers and landowners to make provision to meet the needs of surrounding existing communities, rather than addressing the actual needs that would arise from new development. Such an approach would be unlawful.
10. The Council has recognised in preparing the Local Plan that the huge demand and pressure for development in the Borough provides the exceptional circumstances to alter Green Belt boundaries. Through the plan preparation process, including Sustainability Appraisal, it has recognised that the development of our Client's land adjacent to the A12 Ingatestone site for 57 homes (Policy R22) would be amongst the least impactful (in terms of Green Belt purposes) and would promote sustainable patterns of development.
11. It is fully evident that the need for chosen sites to then deliver significant community benefits to justify their Green Belt release is not identified in national policy. Furthermore, opportunities for onsite provision of new "significant" community facilities on smaller scale Green Belt releases are limited and any contributions made towards offsite provision should not go beyond the CIL Regulation 122 and 123 tests. Accordingly, we strongly challenge the soundness of this Policy.
12. It is particularly important to note that the Housing Delivery Test 2018 measurement (February 2019) identifies that against an annual target of 655 dwellings, over the past 3 years it has only delivered 1,509 dwellings against a target figure of 1,965 dwellings. As a consequence of only delivering 77% of its housing target figure, the Council's 5-year land supply is now to be subjected to a 20% buffer.
13. It is clear that Brentwood Borough Council are experiencing housing delivery difficulties and as a consequence, it is vital that Brentwood Borough Council does not implement policies which threaten housing delivery due to their high associated costs or the fact that their actual final development costs would be uncertain, particularly given that the meaning of the word 'significant' is open to wide possible interpretation. It should also be noted that the associated costs of such potential provision will not have been properly examined within either the Sustainability Appraisal or Viability Assessment.
Conclusion
14. The policy would benefit by the deletion of Section A of the policy in order that the wording is compliant with national policy.
15. We also consider that the policy wording would be clearer by referrin g to sites being removed from the Green Belt, rather than de allocated.
Test of Soundness
16. In view of the above considerations, we consider that the Local Plan is not sound, because it is not fully 'consistent with national policy , as it fails to have direct regard to viability. The Plan needs to be amended so that any community benefits
being sought are legally justified and appropriate . Consequently, in its present shape, it will be neither ' justified', nor ' effective', as it will not represent the most a ppropriate strategy, when considered against the reasonable alternatives. Nor has the Local Plan been 'positively prepared'.
Proposed modifications
17. The following amendments are proposed to the text of Policy NE13:
Paragraph A: delete the whole paragraph the deletion of Section A of the policy in order that the wording is compliant with national policy.
Paragraph B: amend as follow: These sites will be removed from the Green Belt to allow development to take place and provide new defensible boundaries to protect the open countryside for future generations. Site boundaries to form the new Green Belt boundaries are set out on relevant sites in Appendix 2.
Policy
R22 : Land adjacent to the A12, Ingatestone
Summary of Representation
1. This representation has been prepared on behalf of CALA Homes (North Home Counties) Ltd in support of the proposed allocation of its land adjacent to the A12 Ingatestone site for 57 homes (Policy R22).
Policy R22: Land adjacent to the A12, Ingatestone
2. We very much welcome the fact that our Client's site has been proposed as a housing allocation in the Pre-Submission Local Plan (Policy R22) with an indicative dwelling yield of 57 dwellings and a delivery forecast of 2021/22 - 2023/24, and the Council has responded positively to representations that we made at the Regulation 18 stage, which sought to increase the capacity to 57 dwellings and for the trajectory to identify this site coming forward early in the plan period.
3. Our previous representations were supported by a number of technical studies which we trust the Council found helpful in supporting its decision to allocate the site. Through the technical work undertaken to date, it has been demonstrated that the site is sustainable; can be well integrated into the existing transport network; is suitable for development in terms of noise and vibration levels; and can be developed in a way that will enhance the ecological value of the site.
4. We have also demonstrated through the design work undertaken that the site is capable of delivering approximately 57 market and affordable homes together with public open space and an area of children's play.
5. We are pleased to note that this design work has been recognised by the Council, and the site is now identified in the Pre-Submission Local Plan as offering an indicative yield of around 57 dwellings of mixed size and type.
6. A planning application is now being prepared and a pre-application meeting will take place in the near future.
Conclusion
7. We wish to reiterate our strong support for the proposed allocation of land adjacent to the A12 Ingatestone site for around 57 homes (Policy R22) and we look forward to continuing discussions with the Council with respect to bringing the site forward for delivery at the earliest opportunity.
Test of Soundness
8. We consider that Policy R22 of the Draft Local Plan is sound, because it has been 'positively prepared' and is consistent with national policy justified' and 'effective'.

Attachments:

Object

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

Representation ID: 24043

Received: 19/03/2019

Respondent: Croudace Strategic Ltd

Agent: Barton Willmore LLP

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

The nationally described space standard is an appropriate tool to use when considering the provision of good housing. However, this should not be limited to major development, but should extend to all emerging residential development, whilst allowing for the consideration of local circumstances and site-specific conditions, in order to accord the NPPF (Section 12, Achieving Well-Designed Places). The policy is therefore "unjustified" in relation to need and viability (our emphasis) in accordance with the NPPF. The adoption of nationally described space standards is also at the discretion of the LPA and should be decided upon in a local context.

Full text:

1.0 INTRODUCTION
1.1 These Representations on the Brentwood Borough Council Reg 19 draft Local Plan have been prepared on behalf of Croudace Homes who are promoting their site (Officers Meadows - site number 034), which falls within the broader allocation of "Land North of Shenfield". The allocation encompasses several land ownerships, including Sites 158, 235, 087, 263 and 276, as well as the "Officer's Meadow" site (034), all of which make up the allocation Policy R03. It should be noted that Croudace Homes has controlling land interest in Site 034 only, therefore whilst development proposals have taken the other sites into account, this document is in respect of the "Officer's Meadow" site.
1.2 "Land North of Shenfield" was previously promoted through the Reg 18 Local Plan process (see Site Allocations Map Jan 2016 which supported the Draft Local Plan) historically as one of three separate strategic sites, now shown in the Reg 19 draft Local Plan site allocation as one site, "Officer's Meadow and surrounding land" (ref. Policy R03) allocated for residential development. The "Officer's Meadow" site is the focus of these Representations to the Reg 19 draft Local Plan and is hereby referred to as "the Site".
1.3 These representations are submitted to the Local Plan consultation document and set out our support for the Brentwood Borough Council (BBC) Local Plan in terms of the proposed spatial strategy and the identification of the Site as an allocation for growth.
1.4 These representations are focused on the Site allocation and demonstrate that the allocation is "sound" and deliverable having regard to National policy and a number of technical matters for the Site. It also reviews the Local Plan in terms of soundness of the Duty to Co-operate, the proposed spatial strategy (inc. Sustainability Appraisal) and other policies in the Plan including for Development Management purposes.
1.5 These representations are supported by technical reports included as appendices, which, on behalf of Croudace Homes, provide the background evidence to support the allocation and demonstrates it is "suitable", "available", "achievable" and therefore "deliverable". This will be referred to in these representations and it has regard to BBC's Evidence Base. The technical reports prepared by the consultant team, detail matters concerning:
* Transport;
* Landscape/Green Belt;
* Drainage;
* Noise
* Ecology;
* Archaeology; and
* Masterplanning.
* Shenfield High School "All through" education provision proposals.
1.6 The following sections of these representations are set out as follows:
* Section 2.0 - National Policy;
* Section 3.0 - Duty to Co-operate;
* Section 4.0 - Local Plan Strategy;
* Section 5.0 - Policy LP R03 -Land North of Shenfield (Officer's Meadow);
* Section 6.0 - Delivery of Land North of Shenfield (Officer's Meadow);
* Section 7.0 - Soundness of other policies in the Local Plan; and
* Section 8.0 - Conclusion.
2.0 NATIONAL POLICY
2.1 This section provides an overview of the NPPF with particular regard to plan-making. Other policies in the NPPF will also be referred to later in these representations.
i) National Planning Policy Framework
2.2 On 24 July 2018, the revised National Planning Policy Framework (2018 NPPF) was published by National Government, setting out the planning policies for England and how these are expected to be applied in both plan-making and decision-taking. Post 24 January 2019 any plans submitted after this date must refer to the revised NPPF. This document therefore focusses on the revised 2018 NPPF.
2.3 The revised NPPF introduces the Government's standardised methodology for assessing housing needs. For those LPAs which do not submit plans within the NPPF's transitional period, the standard method will apply as a starting point for assessing housing needs.
a) Plan-Making
2.4 The NPPF 2018 (Para 35) sets out the requirement for Local Plans to be examined by an independent Inspector whose role is to assess whether the Plan has been prepared in accordance with legal and procedural requirements, and whether it is "sound". An LPA should submit a Plan for Examination which it considers is "sound" - namely that it is:
* Positively prepared (as a minimum seeking to meet the area's objectively assessed needs);
* Justified;
* Effective; and
* Consistent with national policy.
2.5 These representations will assess the Pre-Submission Local Plan against the tests of soundness, as above. The next section details the Duty to Co-operate in this regard.
3.0 DUTY TO CO-OPERATE
3.1 This section considers the legal compliance and procedural matters associated with the Local Plan with regard to the "Duty to Co-operate".
i) Policy Framework
3.2 The "Duty to Co-operate" as provided for in Section 110 of the Localism Act 2011 came into effect on 15 Nov 2011. The "duty" was introduced under the 2011 Act to address the impact of the loss of the "top-down" effect from the Regional Strategy and to offer a transparent way in which LPAs should relate to one another on cross boundary issues. The "duty" is now shared between LPAs requiring them to collaborate on cross-boundary matters and issues of sub-regional and regional importance, especially housing provision and infrastructure issues.
3.3 The NPPF 2018 (Paras 24-27) is clear in directing LPAs as to the importance of the "Duty to Co-Operate" and the pro-active approach necessary to ensure a collaborative approach to reflect individual local plans.
ii) BBC's 'Duty to Co-Operate' (DtC)
3.4 The NPPF recommends that where a Housing Market Area (HMA) extends across more than one local authority plan makers should assess need for housing for the whole HMA, rather than just the individual authority. The SHMA (Oct 2018) sets out that Brentwood District is a self-contained Housing Market Area (HMA). On this basis, no further joint evidence base documents were commissioned, but strategic work continues with South Essex Councils.
3.5 The Objectively Assessed Need (OAN) for BBC amounts to 380 dwellings per annum (dpa) as the SHMA advises that the Council plans on the previous OAN evidence (despite referring to 350 dwellings per annum (dpa) following the current guidance, for the period 2019-2029). In addition, the Council propose additional land allocations over and above "need" (20% above 380 dpa). This approach is welcomed in the SHMA guidance, as overprovision should provide additional flexibility in the supply and delivery of sites.
3.6 Since the draft Brentwood Borough Council Reg 19 Local Plan has been published, the PPG HENA details the standard method for assessing housing need and now clarifies that the 2014-based household projections published by the Office for National Statistics should be used to set the 'baseline' for the standard method calculation. The standard method number for Brentwood is 452 dpa.
3.7 The OAN is 7,752 dwellings during the Plan period (2016 - 2033) and it is welcomed that the Local Plan is seeking to meet this need in full (and potentially overprovide). This is addressed further in the housing strategy section to follow. The Plan also provides an equitable distribution of new homes across the HMA and this will be addressed under the Sustainability Appraisal.
3.8 It is evident that BBC has engaged with neighbouring authorities regarding cross-boundary matters as well as meeting housing need, as set out in the Duty to Co-operate Brentwood Position Statement (February 2019).
3.9 As part of the DtC the Borough would normally need to consider whether it is a sustainable location for unmet cross boundary need. However, as Brentwood is a Green Belt authority (89% is Green Belt), it is unlikely that Brentwood will be in a position to accept any unmet housing need from the South Essex housing market area. The Essex neighbours (Chelmsford and Epping Forest) both have plans submitted for examination that are not reliant on Brentwood accepting any of their housing growth.
3.10 Ongoing Duty to Cooperate work continues with South Essex as part of a strategic growth study and participation in a Joint Strategic Plan.
3.11 The Association of South Essex Local Authorities (ASELA) memorandum of understanding was recently signed by Basildon Borough Council, Brentwood Borough Council, Castle Point Borough Council, Essex County Council, Rochford District Council, Southend on Sea Brough Council and Thurrock Borough Council (Jan 2018). This highlights the constraints and challenges facing other local authorities in terms of meeting their housing needs, and emphasises the importance upon BBC in terms of meeting its own needs in full. We therefore welcome BBC's aspirations in seeking to meet its own needs and indeed in seeking to provide to some flexibility too.
3.12 Duty to Co-operate discussions have confirmed that immediate neighbouring authorities are aiming to meet OAHN within their boundaries, but some will have difficulties in this regard. However, as Brentwood is a Green Belt authority, it is unlikely that Brentwood will be in a position to accept any unmet housing need from the South Essex housing market area.
3.13 To ensure the Local Plan is justified and effective (NPPF, para 35), it is considered that the above issues should continue to be updated in the evolving DtC Statement (February 2019).
3.14 The Council needs to continue to have regard to neighbouring authority plans and adequately co-operate with neighbouring authorities, rather than awaiting the future joint strategic plan, as well as Essex County Council plans, and strategies of other relevant bodies.
3.15 This working can be further supported by the Duty to Cooperate meetings dealing with the strategic planning issues relating to the South East Essex 2050 Programme. Also, the Association of South Essex Local Authorities (ASELA) Statement of Common Ground which includes a commitment to joint working through the preparation of a Joint Strategic Plan for South Essex.
3.16 It is recommended that BBC continues to embrace opportunities to work with the other members of ASELA, as well as producing statements of common ground with its neighbouring authorities, which is a key element of plan preparation, in order to secure a "sound" Local Plan which meets the requirements of the Duty to Co-operate.
4.0 LOCAL PLAN STRATEGY
4.1 This section examines and provides commentary on the proposed spatial strategy in the Local Plan, insofar that it relates to the housing and employment provision, and the allocation of strategic sites for growth including within the Green Belt.
4.2 First, we set out our representations on the Sustainability Appraisal for the Local Plan.
a) Sustainability Appraisal
4.3 The BBC Sustainability Appraisal (incorporating Strategic Environmental Assessment) provides an assessment as to how the spatial strategy for the Local Plan was arrived (identifying, describing and evaluating the likely significant effects of implementing the plan).
4.4 The strategy has evolved from the early 'Pathway to a Sustainable Brentwood' Issues and Options document (2009), which set out a series of strategic objectives. The overarching priorities set out in the Interim SA (Jan 2018) are:
* Environment and Housing Management;
* Community and Health;
* Economic Development;
* Planning & Licensing; and
* Transformation.
4.5 In order to achieve these priorities the following plan themes have been set out (with associated objectives as set out in the SA):
* Managing Growth;
* Sustainable communities;
* Economic prosperity;
* Environmental protection and enhancement;
* Quality of Life and community infrastructure; and
* Transport and Movement.
4.6 Having regard to these themes and objectives, 10 No. reasonable spatial strategy alternatives were drawn up in the SA. The desire to deliver at least one large-scale, strategic site (likely for a mix of uses, to include both housing and employment) is quite well established, recognising: A) limited opportunities within settlements; B) no potential to export 'unmet needs' (as discussed); and C) the alternative of piecemeal Green Belt development dispersed widely has significant draw-backs (this option was appraised within the 2013 Interim SA Report).
4.7 A number of strategic site options have been examined over recent years, including through consultation and SA work, such that there is now a refined understanding of those sites that are genuine contenders for allocation through the Local Plan - There is specific mention of North of Brentwood and ....' the potential for expansion to impact 'in-combination' with other potential extensions to the urban Brentwood/Shenfield area, most notably the potential 825 homes on land at Officers Meadow (directly to the east)'.
4.8 The SA goes on to note that there is a need to give careful consideration to growth opportunities at Brentwood/Shenfield urban area.......Brownfield opportunities are limited; hence there is a need to examine Green Belt urban extension options. All land around the urban area is given brief consideration, with reference to the site options and the designated constraints that exist. Specifically:
North of Shenfield
A large area of land is bounded by the railway line to the east, and the A1023 to the west; plus there is a parcel of land to the north of the A1023, bounded by the A12. There are relatively few designated constraints, although considerations include a spur of Arnolds Wood Local Wildlife Site (LWS), and proximity to the railway and main roads. This land parcel comprises three HELAA sites, all of which are preferred allocations at the current time (Officer's Meadow; Land east of A1023; and Land north of A1023).
[SA of Brentwood Local Plan, January 2019 - page 113]
4.9 Of the options considered, the SA concluded that "Option 3" Dunton Hills Garden Village only, in addition to the sites that are a 'constant' across the reasonable alternatives, was the preferred option for growth as it performs well in terms of the majority of sustainability objectives. Furthermore, the option of identifying the delivery of 'constant' sites was also preferred with the objective of meeting both short and long-term needs.
4.10 We fully support and consider the approach of the Sustainability Appraisal to be "sound" in terms of alternative strategies assessed for the Local Plan and consider that the most sustainable option has been arrived at.
4.11 The SA reviewed site options that could deliver the proposed spatial strategy. This includes "suitable" sites as derived from the SHLAA against a series of 12No SA criteria including Housing, Landscape, Community and well-being and other sustainability considerations. This included a "red, amber, green" assessment of sites as against the selected 12No criteria. We support this approach and consider it to meet the requirements of the SEA in terms of the assessment of environmental impacts - this includes BBC's assessment of the Site at North of Shenfield for which we also fully support and consider to be "sound".
4.12 The process allowed for two strategic site options to be discounted (considered 'unreasonable') given planning/sustainability considerations and deliverability considerations. The extent of reasonable sites has been restricted to balance the need to meet housing needs as well as ensuring that pressure will not be put on infrastructure nor pose a serious risk to air quality, local amenity, natural and heritage assets and biodiversity.
4.13 Our Client's considerations of the Council's Sustainability Appraisal have been informed by the accompanying "Review of Sustainability Appraisal" (Barton Willmore EIA, March 2019), which is attached to these representations. (See Appendix 01).
4.14 The preferred approach is Option 3, which involves allocating Dunton Hills Garden Village only, in addition to the sites that are a 'constant' across the reasonable alternatives (including Officers Meadows), and thereby putting in place an overall land supply sufficient to provide the required housing target dpa (assuming no delayed delivery).
4.15 We support the overall approach to the Sustainability Appraisal, insofar as:
* It follows a robust process in evaluating alternative options for growth as well as specific site options;
* The approach to individual site options is considered to be sound; and
* It is considered to be "sound" in that it arrives at the most reasonable option for growth - Dunton Hills Garden Village in addition to the sites that are 'constant' across the reasonable alternatives- as encompassing the allocation at Land North of Shenfield (034).
b) Housing Strategy
4.16 On 19 February 2019, MHCLG published the long-awaited outcome of the 'Technical consultation on updates to national planning policy and guidance', which clarifies the methodology for assessing housing need incorporated in the updated Housing and Economic Needs Assessment (HENA) Published on 20 Feb 2019. The standard method for assessing housing need is detailed in the PPG HENA and now clarifies that the 2014-based household projections published by the Office for National Statistics should be used to set the 'baseline' for the standard method calculation. The standard method number for Brentwood is 452 dpa.
4.17 In order to provide flexibility in the supply of housing sites, help boost delivery and to aim towards the standard method figure, the Council has proposed a further 20% supply buffer when allocating development sites in the Local Plan above the established annual housing figure of 380 dwellings per year, as set out in the SHMA. The buffer allows for an additional housing supply in the borough to be maintained throughout the Local Plan period and is supported in national planning guidance. The Reg 19 Draft Local Plan refers to 456 dpa based on the 20% SHMA uplift on 380 dpa.
4.18 The Local Plan sets out (Policy SP02) the OAN for housing in the Borough as being 7,752 dwellings during the Plan period (2016 - 2033); which when projected across the 17-year plan period gives an annualised housing delivery target of 456 new homes per year. The Council has not been able to identify a 5-yr HLS that delivers this current annualised requirement. When calculating HLS for our representations we have based our assumptions on 452 dpa which is the most up to date guidance (February 2019).
4.19 As a result of 89% of the Borough being designated Green Belt, the Council advises it is difficult to achieve a five-year supply, as many allocated sites within the Green Belt will not be available until the adoption of the Plan. On this basis a larger proportion of sites will not be delivered until after 2023, when they begin to benefit from detailed planning consent.
4.20 Therefore, a stepped trajectory is proposed, with an initial housing delivery target of 310 dpa to 2023 has been set, followed by a higher target of 584 dpa thereafter, which totals 7,752 homes overall in accordance with Policy SP02.
4.21 The Local Plan (Chapter 4, Policy SP02: Managing Growth) indicates that the residual requirement will be sought largely through new development being directed towards the site allocations set out in Chapter 8; and highly accessible locations along transit/growth corridors. These are as follows and seek to deliver circa. 4,500 units up to 2033:
Table 4: Strategic Sites [see attachment]
4.22 In terms of the allocation at Land North of Shenfield ("Officers Meadow"), this includes an overall requirement across the whole site allocation at Policy R03 for 825 units to be delivered in the Plan period. This delivery schedule is supported and is addressed further in the next section.
4.23 We support the housing strategy for the Local Plan and welcome that BBC is seeking to meet its housing needs in full. This is particularly important having regard to the likely inability of adjacent authorities (referred to on page 5) to meet their own needs. We therefore consider the housing strategy in the Plan to be "sound" in accordance with the NPPF (Para 35).
c) Employment Strategy
4.24 Policy PC02: Job Growth and Employment Land identifies that provision is made for at least 47.39ha of new employment land (B-use) to address the needs of the Borough up to 2033. To ensure that the Plan is more effective, it is recommended that this is followed by supporting text setting out the extent of need as derived from the Brentwood Economic Futures report (2018) and Strategic Housing Market Assessment (2018).
4.25 This need is proposed to be met through allocations set out at Policy PC03: Employment Land Allocations. This includes provision of appropriate new employment development on North of A1023 (part of the Land North of Shenfield R03 land use allocation). We fully support this aspect of the Plan including the broad strategy underpinning both the housing and employment allocations. The employment strategy for the Local Plan is justified and "sound" in line with the NPPF (para 35).
d) Five-Year Housing Land Supply
4.26 The Local Plan is unclear in terms of being able to demonstrate a 5-yr HLS of housing land for the purposes of the Plan.
4.27 The most recent AMR (Nov 2018) demonstrates that BBC currently has a supply of 4.1 years - against requirement of 411.6dpa (2,058 units over 5-years) which encompasses a 20% buffer as required by the NPPF and Housing Delivery Test. This is as a result of persistent under delivery, as delivery is currently calculated as 50.83% for BBC, below the 85% requirement.
4.28 The AMR 5-yr supply relates to the period 2018/19 - 2023 and concerns, inter-alia, sites with planning permission, existing commitments and strategic sites at Dunton Hills Garden Village, West Hordon Industrial Estate, Ford Headquarters, etc. The Plan's trajectory details the delivery at proposed allocated sites (2016/17 - 2032/33) amounting to 6,088 units.
4.29 The 2018 AMR suggests the delivery of 819 units (Allocations, Reg 19 Local Plan) within the same timeframe (2018-2023). The figure is derived from existing permissions, developments, allocations and commitments, as well as the 20% buffer, is 1,694.7 units, and concludes the supply is 4.1 years (as set out below):
Table 6: Five Year Supply Position (2018-2023) [see attachment]
4.30 The AMR 2018 refers to the PPPG: HELAA, which sets out how a 5-yr HLS is measured where LPAs have a "stepped" rather than annual average requirements; it states:
Five-year land supply is measured across the plan period against the specific stepped requirements for the particular 5-year period. Stepped trajectories will need to ensure that planned housing requirements are met fully within the plan period.
[Paragraph 017, Reference ID: 2a-017-20180913]
4.31 The AMR 2018 sets out (Table 4: Comparison of annualised housing delivery target and projected completions) a housing delivery target of 7,752 homes (456 dpa over the 17-year Plan period), together with annualised projected housing completions. The report states that from a comparison of this data an initial stepped requirement of 310dpa to 2023, followed by a higher stepped up requirement of 584dpa for the remainder of the Plan period, is a logical approach to reach 7,752 homes by 2033.
4.32 As a result of the high proportion of Green Belt in the Borough, it is extremely difficult to achieve the annualised 5-yr HLS requirement. This is because, as set out in the AMR 2018, sites on the edge of settlements currently within the Green Belt are not available for development purposes until the emerging Local Plan is adopted. Therefore, the potential for a stepped trajectory has been proposed, which delivers a greater proportion of the required homes beyond 2023.
4.33 The above demonstrates that BBC is not fully able to demonstrate a 5-yr HLS for Local Plan purposes. This position could be expedited by allowing allocated sites, such as "Officers Meadow" to come forward 1-2 years sooner, within the present 5-year period, to help meet the required 5-yr HLS position.
5.0 LAND NORTH OF SHENFIELD - POLICY R03
5.1 Land North of Shenfield (Policy R03: Strategic Site - Land North of Shenfield) is allocated in the Pre-submission Reg 19 Local Plan and the extent of the allocation is shown below:
Figure 1: Land North of Shenfield- Allocation Area [see attachment]
5.2 This shows the Site area as allocated as a whole; despite Land North of Shenfield having 6 land parcels within it, namely Site parcels 034, 158, 235, 087,263 and 276, as identified at Appendix 1: Housing Trajectory in the Reg 19 Local Plan and previously set out in earlier iterations of the Reg 18 Local Plan suite of documentation.
5.3 We set out below our comments on Policy RO3 and Appendix 1- Housing Trajectory in regard to the proposed delivery rates. This is largely supportive, however there are some aspects we do not consider to be "sound".
i) Amount and Type of Development:
a. Provision for around 825 new homes of mixed size and type, including affordable housing.
5.4 This criterion is supported/considered to be sound and "effective" in accordance with the objectives of the NPPF (para 61) relating to creating mixed and balance communities. The proposals for the Site will therefore be able to be delivered in accordance with this policy objective.
b. Provision of land (circa 2.1 hectares) for a co-located 2FE [additional text] primary school and early years and childcare nursery (Use Class D1). To be located adjacent to Alexander Lane. [additional text]
5.5 We largely support this criterion, albeit consider it should be amended (as above) to provide for greater clarity. Therefore as presently worded, we object to this criterion.
5.6 Forecasted figures contained in 'Commissioning School Places in Essex 2016-2021' indicate that there will be a deficit in pupil places by 2020/21 when accounting for demographic factors and the proposed uplift in residential development.
5.7 Earlier/recent work undertaken by the High School (and others) considered the anticipated need for a new 1FE Primary School. The proposed policy wording should clarify that it is now proposing a 2FE Primary School. We have prepared an accompanying note (Appendix 02) that reflects are discussions in this regard.
5.8 Consideration should be given to the location of the Primary School. Again, the recent work undertaken by the High School has examined this, inc the early years facility and nursery element, and that it should ideally be located on the existing school playing fields, just north of Alexander Lane. This would enable the Shenfield High School to deliver an 'all through' school provision, comprehensively expanding the educational offer available on-site.
5.9 The NPPF (para 94) seeks that LPAs take a proactive, positive and collaborative approach to meeting school place requirement and to development that will widen choice in education. The principles of this element of Policy R03 is therefore "consistent" with the NPPF, but the wording should be clarified further. We would be happy to continue discussions with Shenfield High School, BBC & ECC Officers in respect of seeking to agree the most suitable location for the primary school provision.
5.10 In terms of its own generated education requirements, the allocation would give rise to a need for a 1FE Primary School and financial contributions towards secondary school provision. Through positive discussions with Shenfield High School, we have been working closely towards its objective of becoming a "through-school" (by encompassing Primary provision) and contributing towards secondary provision (at the High School) on a pro-rata basis.
c. Provision for a residential care home (around 60 bed scheme as part of the overall allocation).
5.11 The principle of this criterion is supported/ considered to be sound and a care home could be accommodated on the 'Officer's Meadow' site, however this should be subject to the balanced and reasonable distribution of other infrastructure across the Site allocation as a whole. The NPPF (section 5) on "Delivering a Sufficient Supply of Homes" requires that housing need for different groups in the community should be assessed and reflected in planning policies. The provision of a residential care home in Policy R03 would contribute towards the offer of care for older people in Shenfield and is therefore "consistent" with the NPPF, in accordance with national policy and is deemed sound.
d. Provision for up to [additional text] 5% self-build and custom build across the entire allocation area.
5.12 The principle of this criterion is supported, but not as presently worded. We therefore object to this criterion in its present form.
5.13 Section 1 of the Self-Build and Custom Housebuilding Act 2015 (as amended by the Housing and Planning Act 2016) requires each relevant authority to keep a register of individuals and associations seeking to acquire serviced plots for their own self-build and custom housebuilding. Whilst the provision of self-build and custom build should be considered, the evidence base for a 5% need across the entire allocation should be addressed against the local "needs register" and demand for such provision at the prevailing time.
5.14 In order to align with National policy, the evidence base and local need should be fully assessed before any commitment is made to the provision of this house type in this location. It is therefore considered that this element of Policy R03 is unsound.
5.15 It is recommended that this aspect of the policy is amended to "up to" 5% as shown above, to reflect prevailing "need" at the time.
e. Provision of 2ha of land for employment purposes.
5.16 The provision of 2ha of employment land as part of the wider allocation is agreed in principle. Employment land situated on land north of Chelmsford Road, as per the location identified in the BBC Site Analysis Overview report (Feb 2019), is supported, given its location adjacent the A12. This is the most appropriate location for such provision and is "consistent" with the NPPF (para 20). Therefore, and if situated in this location, this criterion is considered sound.
ii) Development Principles:
a. Comprehensive masterplan and phasing strategy to be prepared and considered as planning applications come forward.
5.17 We support this criterion and it is confirmed that development can come forward and be delivered within the timescale as shown in the housing trajectory. We also support a comprehensive masterplan and phasing strategy to set out effective phasing of the requisite infrastructure, as identified in the Infrastructure Delivery Plan (IDP) is "consistent" with the NPPF and is considered sound.
5.18 The overall needs of development must have regard to potential considerations in terms of viability in order to be fully "justified", something not yet addressed in the IDP, which should be rectified in the next iteration of the IDP.
b. Site is identified as a key gateway location and development should reflect this in terms of design quality particularly on land near to Junction 12, A12.
5.19 We broadly support these provisions and the concept masterplan sets out conceptually the land take for development in this location, including the key gateway employment location and residential, however this land is not within our Client's control and as such will be the subject of a separate planning application and detailed framework masterplan. In principle, and from an overall design perspective, this key gateway location is consistent with Section 12 of the NPPF and is "justified" and therefore considered sound.
c. Vehicular access via Chelmsford Road (A1023) and Alexander Lane.
5.20 It is recognised that the delivery of vehicular access via Chelmsford road and Alexander Lane is a necessity as part of these proposals. Our Client's accompanying Transport Strategy (Vectos, March 2019) provides evidence to support the development of the Officer's Meadow Site in terms of reducing the need to travel and providing opportunities for non-car travel. This is "consistent" with the NPPF, in particular Section 9 on "Promoting Sustainable Transport". The provision of access via both Chelmsford Road (A1023) and Alexander Lane allows for flexibility in terms of phasing and means that development can take place simultaneously in more than one location on the Site. It is therefore considered that this criteria is sound.
d. Potential for diversion of Alexander Lane, creating a quiet lane for pedestrians and cyclists, with the provision for new and improved route through the development site linking to Chelmsford Road.
5.21 The potential diversion of Alexander Lane is welcomed in terms of pedestrian safety and improved access. This is because a quieter Alexander Lane will improve access to local schools, pedestrian and cycle infrastructure and the existing PRoW, encouraging active mobility. This policy is therefore considered "justified" in light of the NPPF (para 102).
e. Enhancing sustainable links with Shenfield station and local services and facilities in the wider area.
5.22 The accompanying (Vectos) Transport Strategy confirms that the travel opportunities afforded by the service at Shenfield Railway Station and local bus routes will ensure that travel by public transport is a realistic option for future residents. The NPPF (para 102) states that opportunities to promote public transport use should be identified and pursued by Local Plans. This policy is therefore considered to be "consistent" with the objectives of the NPPF and is sound.
f. Provide well-connected internal road layouts which allow for good accessibility.
5.23 The development of Officer's Meadow would provide opportunities to encourage walking and cycling through new and improved routes and crossing facilities. Improving the accessibility within an already sustainable setting will also help to minimise vehicular traffic, in accordance with National policy. This is "consistent" with the NPPF objectives set out in both Section 8 "Promoting Healthy and Safe Communities" and Section 9 "Promoting Sustainable Transport" .
g. Provision for new multi-functional green infrastructure including public open space.
5.24 The provision of green infrastructure and open space throughout the Site is supported. The development of Officer's Meadow introduces the opportunity to introduce ecological corridors, open space and green infrastructure linkages, as well as enhancing the recreational resource and connectivity value of the Site. The NPPF (para 181) states that planning policies should maximise opportunities for green infrastructure provision and enhancement. This policy is therefore considered "effective" in terms of meeting the requirements set out in the NPPF.
h. Maintain and enhance Public Right of Way within the site and to the wider area.
5.25 Our Client's accompanying Landscape Assessment (Barton Willmore, March 2019) provides information to support the maintenance and enhancement of the existing PRoW on site. Although limiting development, this PRoW allows for the opportunity to introduce ecological corridors, open space and green infrastructure linkages. The NPPF (para 98) states that policies should protect and enhance the PRoW, including taking opportunities to provide better facilities for users. It is therefore considered that this policy is "consistent" and sound in accordance with the NPPF.
i. Protect and where appropriate enhance the Local Wildlife Site (Arnold's Wood).
5.26 Arnold's Wood comprises a narrow strip of Ancient Woodland to the north and the east of the Site. The accompanying Ecological Report (Aspect Ecology (March 2019) identifies this feature as a Local Wildlife Site, whereby appropriate conservation and enhancement through development is a priority. The NPPF (para 170) seeks that planning policies contribute to and enhance the natural and local environment by protecting valued landscapes and sites of biodiversity value, such as area of ancient woodland. The protection and enhancement of the Local Wildlife Site is therefore "justified" with regard to the NPPF, leading to the consideration of this policy as sound.
j. Provide for appropriate landscaping and buffers along sensitive boundaries adjoining the A12 and railway line.
5.27 Our Client's emerging proposals have been informed by a series of technical reports, including the Landscape Report, which provides for a planted buffer to be provided along the A1023 Chelmsford Road to help soften views of the proposed residential development at Officer's Meadow. This policy is therefore "effective" in terms of protecting residential amenity and enhancing the natural environment. The use of appropriate landscaping buffers is also in accordance with the NPPF (Section 15) on "Conserving and Enhancing the Natural Environment", making this criterion sound.
iii) Infrastructure Requirements:
a. Provide pedestrian and cycle crossing points across Chelmsford Road (A1023) where appropriate.
5.28 The accompanying Transport Strategy (Vectos) provides for new and enhanced pedestrian and cycle connections within the Site and to the wider area. As individual development parcels are separated by Chelmsford Road, pedestrian and cycle crossings are required where appropriate to allow safe connection between parcels (as identified in by Infrastructure Requirements). This criteria is therefore supported as the provision of crossing points across Chelmsford Road (A1023) will help to maximise opportunities for sustainable transport modes throughout the Site, to Shenfield railway station and various local services. The NPPF (para 104) states that planning policies should provide for high quality walking and cycling networks. This policy is therefore considered "consistent" with national policy.
b. Provision for improved bus service.
5.29 The provision of an improved bus service, with reference to the IDP, is supported. This criterion is sound in the light of Para 110 of the NPPF. It is therefore "justified".
c. The Site is located within a Critical Drainage Area. This development may have the potential to impact on the Critical Drainage Area in respect of surface water flooding. As a result of this, the site is likely to require an individually designed mitigation scheme to address this issue.
5.30 The majority of the Site is located within Flood Zone 1. As referred to in the accompanying Drainage Report (JNP, March 2019), the critical drainage can be dealt with by the creation of a surface water storage basin/wetland area to attenuate and release the overland surface water flows from off site at a reduced rate. An individually designed mitigation scheme can be implemented on-site via a variety of SuDS, in accordance with the provisions of the NPPF (para 163). These components will also adequately provide for surface water flows generated by the proposed development. The above criteria is therefore considered to be sound and "effective".
5.31 In addition to the above elements of physical infrastructure, and as mentioned previously in respect of other aspects of Policy RO3 allocation, we are also mindful of accompanying social infrastructure - in particular the educational needs of the resultant residents and the relationship with the adjoining Shenfield High School. It is therefore appropriate to reiterate our Client's willingness to work closely with the High School in helping to deliver its aspirations in providing for a "through school" (with Primary provision) and our off-site educational financial contributions will be directed to support this.
5.32 In overall terms, we largely support the provisions of Policy RO3 and have sought to reflect this is the accompanying illustrative concept masterplan, which demonstrates the delivery of the requisite infrastructure for the Site Allocation as a whole including:
- Social infrastructure - primary school, early years and nursery care;
- Transport infrastructure - pedestrian and cycle crossing points;
- Critical drainage mitigation; and
- Blue and Green Infrastructure.
5.33 The above demonstrates our overall support for the allocation of the Site and we can confirm that the proposed development is deliverable within the timescales established by BBC. The delivery of Land North of Shenfield ("Officer's Meadows") is addressed in the next section.
6.0 DELIVERY OF LAND NORTH OF SHENFIELD
6.1 A range of technical work and evidence has been worked up for the Site and which demonstrates the deliverability of the proposals. This technical input is set out in full in the Technical Representations accompanying these submissions.
6.2 This report therefore does not seek to repeat the technical material in full, instead it provides a summary of the main disciplines and how they relate to the delivery of the project.
6.3 This includes work in relation to the following disciplines:
i) Transport (Vectos);
ii) Landscape/Green Belt Assessment (Barton Willmore Landscape);
iii) Drainage (JNP Group)
iv) Noise (Sharps Gayler)
v) Ecology (Aspect Ecology);
vi) Archaeology (Albion Archaeology); and
vii) Masterplan (Barton Willmore Design).
6.4 Below is a brief summary of each of the update reports submitted in terms of the delivery of the scheme.
i) Transport
6.5 The accompanying Transport Strategy (Vectos) (Appendix 03) sets out the principle of a sustainable transport strategy for Officer's Meadow, reducing the need to travel and providing opportunities for non-car journeys. The proximity of the Site to local services and the proposed 'all through' school across the wider site will reduce trip generation and promote sustainable communities.
6.6 The Transport Strategy identifies the junction location i.e. A1023 Chelmsford Road/A129 Hutton Road/A1023 Shenfield Road and the appropriate mitigation measures, which include the implementation of MOVA or similar as a mitigation, in order provide adequate capacity. The access and egress via Alexander Lane will be provided in the form of simple priority junctions.
6.7 The new access points/roundabouts can be fully accommodated within the Site area and/or on highway land. Highways improvements are therefore deliverable as part of the comprehensive development for the scheme. As such, Land North of Shenfield is suitable for allocation in the Local Plan, in terms of highways and transport constraints.
ii) Landscape and Visual Appraisal/Green Belt Review
6.8 A Landscape and Visual Appraisal (BW Landscape) (Appendix 04) has been undertaken to provide a review of the landscape character and visual amenity of the Site and surrounding area. These aspects have informed the parameters of the illustrative masterplan and have demonstrated that the Site is suitable to be released through 'exceptional circumstances' for development, as addressed below. It supports BBC's removal of Land North of Shenfield from the present Green Belt designation, which presently washes over the entire Site and its surrounding environs.
6.9 Direct adverse impacts of development on the wider Green Belt setting would be minimised by locating strategic open space on prominent land, particularly in the north east the Site. Low density housing could be located in the most prominent areas, framing the retained Ancient Woodland area to the north and east of the Site. A PRoW also traverses the Site, enabling the introduction of ecological corridors, open space and green infrastructure linkages, as well as enhancing the recreational resource and connectivity of the Site.
6.10 Development of the Site would form a logical extension that is in keeping with the existing settlement, better connecting the ribbon development between Chelmsford Road and the settlement edge of Alexander Lane. In terms of visibility, glimpses of the Site can be seen from elevated views to the west. However, the landform ensures that it is largely well contained by a combination of vegetation cover and built form, restricting long-distance views. A landscape-led approach to development within the Site would seek to ensure that existing defensible boundaries continue to prevent unrestricted sprawl.
6.11 The LVA concludes that allocation of the Site would result in successful assimilation and integration of new residential development, with the potential for adverse effects on the landscape setting moderated, as required by the NPPF. The Site is considered to be of "low sensitivity" as it is of a low landscape value and the localised visual envelope of the Site, coupled with the surrounding land uses, lends itself to residential development. The Site makes a minimal contribution towards the 5No purposes of the Green Belt, making it suitable for release and able to contribute towards a suitable pattern of development for Shenfield.
iii) Drainage
6.12 A Flood Risk and Drainage Note has been prepared (JNP Group) (Appendix 05). This confirms the location of the majority of the Site within Flood Zone 1, where there is the lowest probability of flooding and where new development should be steered. A small part of the Site is located within Zones 2 and 3. Built development (housing, social infrastructure, etc.) will avoid Flood Risk areas.
6.13 All proposed buildings within "Officer's Meadows" are to be located in Flood Zone 1. Essential infrastructure which passes through a small area designated as Flood Zone 3 will be subject to the "Exception Test" and site-specific flood risk assessment to demonstrate safe access & egress from the site and that the development does not increase flood risk both on and off site. Safe access & egress will be provided off Chelmsford Road A1023 and Alexander Lane. Where affected, allowance for flood compensation storage will be provided to ensure no net loss in flood storage.
6.14 The critical drainage can be dealt with by the creation of surface water storage basins/wetland areas to attenuate and release the overland surface water flows form off site at a reduced rate. Development generated surface water flows can be dealt with via SuDS components and a storage basin/wetland attenuation area. The Site is therefore suitable and deliverable from a flood risk and drainage perspective.
iv) Noise
6.15 An assessment of "likely noise constraints" has been undertaken (Sharps Gayler) (Appendix 06) to identify potential constraints relating to noise and vibration upon Officer's Meadow. The below conclusion is based on a desktop assessment, informed by computer modelling of transportation noise sources in the area (A12, A1023 and the mainline railway).
6.16 Whilst there is a low to medium risk on the boundaries of the Site with Chelmsford Road and the rail line, the majority of the Site presents a low risk. At low noise levels, the Site is likely to be acceptable from a noise perspective, provided that a good acoustic design process is followed at the detailed application stage, particularly for development within 50m of Chelmsford Road and the rail line.
6.17 The assessment concluded that there are no significant constraints on Site in relation to noise. Land North of Shenfield is therefore suitable and deliverable from an acoustic perspective.
v) Ecology
6.18 An Ecological Appraisal has been undertaken (Aspect Ecology) (Appendix 07). This report confirms that the Site comprises a range of habitats including arable, woodland, grassland, watercourse, hedgerows, scrub and lines of trees. The woodland at the north-east of the Site, the watercourse and the hedgerows are of elevated ecological value and are considered to be important ecological features.
6.19 Protected species such as bats, badgers, dormice and reptiles have not been identified within the vicinity of the site at this stage. Although thought to have 'good' suitability for Great Crested Newt, a DNA survey (2015) found the pond nearest to the Site unlikely to support a Great Crested Newt population. A further Great Crested Newt presence/absence survey of all relevant ponds associated with the Site is to be undertaken in 2019.
6.20 The habitats at the Site are currently unmanaged from an ecology point of view and the development proposal presents the opportunity of securing suitable management practices, appropriate mitigation and 'net gains' in terms of biodiversity. When considering ecological constraints, the Site is therefore both suitable and deliverable, subject to further survey work.
vi) Heritage Assessment
6.21 A Desk-based Heritage Assessment (Albion Archaeology) accompanies these representations, which has also been informed by a preliminary walk-over of the Site. The accompanying report (Appendix 08) reviews the potential for below ground archaeological interest and potential impact arising from development on such features; as well as an assessment of any direct impact on potential heritage assets.
6.22 No heritage assets other than the crop mark of a bomb crater, have been recorded in the proposed development area. Other heritage assets comprise former buildings, the postulated course of a Roman road, find-spots and historic settlement cores, whose setting will not be impacted by the proposed development. The adjacent railway lines, roads, buildings and vegetation suggest that the proposed new buildings are unlikely to be visible from these heritage assets. The potential impact on the setting is therefore assessed as "no change". The significance of this impact is "insignificant".
6.23 The potential for archaeological remains has been assessed covering prehistoric to modern periods. In general terms the "significance" of any remains is low to moderate. Any potential impact of the new development on potential buried archaeological remains could be mitigated by measures to investigate and record the presence/absence of potential archaeological assets. Officer's Meadows is thereby deliverable from an archaeological perspective.
vii) Masterplan
6.24 The accompanying illustrative concept masterplan (BW Design) (Appendix 09) has been developed in response to the above technical information prepared for the Site.
6.25 This demonstrates the ability of the Site itself to deliver:
* Circa 510 homes ("Officer's Meadow" site) inc. affordable provision;
* The proposed dwellings can be delivered within the timescale of the housing trajectory, with varying densities;
* Other potential linkages to Chelmsford Road (A1023) and Alexander Lane;
* A 60-bed care home;
* A Local Centre/ community facility;
* Multi-functional green and blue infrastructure; and
* Sustainable transport links.
6.26 Moreover, the illustrative concept masterplan also demonstrates the delivery of:
* Significant areas of Public Open Space encompassing:
- Natural and Semi-Natural Green Spaces;
- Outdoor Sports Facilities; and
- Children's/Young People's Play Area.
* Primary School provision on the adjoining Shenfield High School.
6.27 The above provides an overview of the technical inputs to the Land North of Shenfield (Officer's Meadow) and which confirms that the Site and proposals for it are deliverable within the Local Plan context. The proposals for the Site form part of an iterative process and further information will come to light in advance of a planning application to ascertain the detailed parameters for the Site.
6.28 These matters will be "screened" for a full Environmental Impact Assessment for a subsequent planning application, and it is envisaged the EIA Screening will be submitted later in 2019.
7.0 SOUNDNESS OF OTHER LOCAL PLAN POLICIES
7.1 This section does not seek to comment on other specific allocations/sites. Instead it focuses on policies of relevance within the Local Plan and sets out our comments and recommendations on these in terms of the tests of soundness in the NPPF.
7.2 Policy SP01: Sustainable Development takes a positive approach towards "Presumption in Favour of Sustainable Development" and seeks to apply this in terms of planning applications, in accordance with the Development Plan. The NPPF (para 11) assumes a strong "Presumption in Favour of Sustainable Development" in all planning related matters and places a responsibility on LPAs to positively seek opportunities to meet the development needs of their area and to, as a minimum, provide for objectively assessed needs for housing and other uses. This policy is "consistent" with the NPPF and is therefore sound.
7.3 Policy SP02: Managing Growth seeks to support the delivery of homes by setting out provision for 7,752 new dwellings to be built over the Plan period 2016-2033, at an annual rate of 310 dwellings up to 2022/2023, followed by 584 dwellings from 2023/24-2033. This objective is not supported, as it is considered that this stepped trajectory which delivers a greater proportion of the required homes beyond 2023, could be reviewed to allow more housing to come forward from the period 2021 onwards. This is with particular reference to NPPF (para 23) which states that "strategic policies should provide a clear strategy for bringing sufficient land forward, and at a sufficient rate, to address objectively assessed needs". This policy is therefore "not consistent" with the NPPF and not sound.
7.4 We consider that in order to address this, the Council should review its housing trajectory and at the same time, clarify the new dwelling number ahead of the Local Plan submission, to align with the February 2019 agreed position on the 'baseline' for the standard method calculation.
7.5 The Council should, in addition, work with developers to bring applications forward in advance of the adoption of the Local Plan, to meet housing need.
7.6 Policy SP03: Health Impact Assessments (HIAs) states that Brentwood Borough Council is committed to ensuring all new developments promote healthier and inclusive environments. The majority of proposals will be required to assess their impacts on health and well-being upon the capacity of existing health care and social care services and facilities, the environmental impacts, and the promotion of health improvement activities, arising from the development. Developments of 50 or more units are required to submit a Health and Well-Being Impact Assessment, as required by the EPOA HIA Guidance Note.
7.7 This policy is considered to be unsound as it is not "justified". The requirement to undertake a Health Impact Assessment (HIA) is a superfluous burden on applicants. It should be down to the Local Plan to take into account wider health concerns in the local area and focus policies upon addressing these concerns. Health and well-being should be covered within the polices of the Local Plan and where a development aligns with these, an HIA should not be required.
7.8 Policy SPO4: Developer Contributions refers to the need for all new development to be supported by, and have good access to, all necessary infrastructure. Developers and land owners must work positively with the Council, neighbouring authorities and other infrastructure providers throughout the planning process to ensure that the cumulative impact of development is considered and then mitigated.
7.9 Applicants proposing new development will be expected to make direct provision or contribute towards the delivery of relevant infrastructure, as required by the development either alone or cumulatively with other developments. The Infrastructure Delivery Plan (IDP) identifies the types of infrastructure required to support the anticipated growth in the borough and includes a summary of the current identified infrastructure projects.
7.10 Policy SPO4 should be more explicit on the exact nature of requirements that the developer may be required to meet to avoid overly onerous requirements or confusion over cumulative impact and phasing with other developments and therefore this policy is not "justified" and is unsound.
7.11 Policy SP05: Construction Management states that all major development should sign up to the Considerate Constructors Scheme, or equivalent. Major development must consider the cumulative impacts of other major development occurring in the vicinity, to reduce the cumulative impacts.
7.12 It is considered that this policy accords with the NPPF and is therefore found to be sound, with particular reference to NPPF (para 72) which refers to larger scale development supported by the necessary infrastructure and facilities.
7.13 Policy SP06: Effective Delivery of Development states that proposals for large allocation sites will be expected to be developed in partnership with the Council, infrastructure providers and other relevant organisations, through a collaborative masterplanning approach. Development proposals should submit a supporting statement setting out the sustainable long-term governance and stewardship arrangements for community assets including land, services and facilities such as village halls, community centres, libraries, parks, green spaces, and buildings for sports, leisure, healthcare, education, social, arts and cultural activities. This policy is overly onerous and therefore "unjustified". This policy is therefore considered to be unsound.
7.14 Policy BE02: Sustainable Construction and Resource Efficiency requires all development proposals to maximise the principles of energy conservation and efficiency. Whilst the NPPF (para 153) has regard to the inclusion of renewable and decentralised energy as part of a new development, it states that such features are only required where it is either feasible or viable. This policy is therefore not "consistent" with National Policy.
7.15 We therefore object to the policy in its present form. In order to ensure consistency with National policy, criteria (f) of Policy BE02 should be revised to mirror the NPPF position. Therefore, it is considered that proposed Policy BE02 is unsound.
7.16 Policy BE03: Carbon Reduction, Renewable Energy and Water Efficiency states that proposals for renewable, low carbon or decentralised energy schemes will be supported, subject to adverse cumulative and visual impacts, which cannot be satisfactorily addressed. Criteria (b) of the proposed policy sets out the minimum standards of sustainable construction and carbon reduction. It is Government policy to seek to deliver improvements to emissions from buildings through the application of building regulations. It is therefore considered that the table provided in proposed Policy BE03 is not required, and therefore this policy is "unjustified" and unsound.
7.17 Policy BE04: Establishing Low Carbon and Renewable Energy Infrastructure Network sets out that developments will be required to provide for the necessary infrastructure to meet the needs of the development, specifically stand-alone renewable energy infrastructure. The policy advises that new development of over 500 units, or where the clustering of neighbouring sites totals over 500 units, will be expected to incorporate decentralised energy infrastructure.
7.18 The supporting text refers to the need for District heating networks and the identification of Strategic allocations in the Brentwood IDP, including the Officers Meadow's masterplan area, that could provide opportunities for DH and CHP schemes as energy solutions for new development.
7.19 This policy is considered overly onerous and "unjustified" in relation to the NPPF and therefore unsound.
7.20 In order to make the policy more effective, it could set out that the delivery of renewable energy infrastructure should be required based on evidence of need and viability and a "viability assessment" (at the time planning applications are submitted/determined) - as per Policy SP04.
7.21 Policy BE08: Sustainable Drainage seeks that all developments should incorporate appropriate Sustainable Drainage Systems (SuDs) for the disposal of surface water, in order to avoid any increase in flood risk or adverse impact on water quality. Larger sites over 1 hectare in Zone 1 must be accompanied by a Flood Risk Assessment. Water runoff will comply with the requirements of this policy by provision of SuDS in the surface water drainage strategy. The NPPF (para 163) refers to the need for local planning authorities to ensure that flood risk is not increased elsewhere. Where appropriate, applications should be supported by a site-specific flood-risk assessment. This aspect of the policy is therefore considered "consistent" with the NPPF.
7.22 Given the extensive nature of the development, opportunities exist to incorporate the above the SuDs management across the site both locally and site-wide. However, the requirement for prevention if run-off for all rainfall events up to 5mm is in excess of the SuDS manual and is therefore "unjustified". Unfortunately, this therefore renders the overall Policy BE08 to be unsound.
7.23 Policy BE10: Connecting new developments to digital infrastructure seeks to support Brentwood's economic growth and productivity by improving the offer of digital infrastructure available within the Borough. Whilst planning strives to achieve the highest possible standards of construction and performance for new dwellings, Council's should not seek higher standards than Building Regulations on any other technical standards. Proposed Policy BE10 is therefore "unjustified" in light of National policy and therefore unsound.
7.24 Policy BE11: Strategic Transport Infrastructure requires that development in proximity of the railway stations demonstrate how the scheme connects the surrounding walking, cycling and public transport links to the station, linking new developments with the fast high-capacity transport links into London from Shenfield and the improved linkages from the Elizabeth line. Development close to schools and early years childcare facilities should facilitate an attractive public realm that is safe for children and encourages walking and cycling to address the impacts of school run traffic, in line with ECC's Developers' Guide to Infrastructure Contributions. This aligns with the NPPF (section 9) on "Promoting Sustainable Transport". These considerations therefore appear to be "justified", in accordance with national planning policy and therefore the policy is sound.
7.25 Policy BE13: Sustainable Means of Travel and Walkable Streets and Policy BE16: Mitigating the Transport Impacts of Development refers to sustainable modes of transport that should be facilitated through new developments, promoting accessibility and integration into the wider community and existing networks. Any development requiring a new road or road access, walking and cycling facilities and public transport, will be required to have regard to the adopted ECC's Development Management Policies or successor documents.
7.26 The policies seek to secure developments that are, inter-alia, designed to make necessary contributions to the improvement of existing infrastructure and provision of new infrastructure; be consistent and contribute to the implementation of the Essex County Council's Development Management Policies and include Transport Assessments and Travel Plans. This aligns with the NPPF (section 9) "Promoting Sustainable Transport" and is therefore considered "justified" and sound.
7.27 Policy BE17: Parking Standards refers to the vehicle parking requirement set out in the most up-to-date Essex Parking Standards. The NPPF (para 105) states that when setting local parking standards policies should take into account: a) the accessibility of development b) the type, mix and use of development c) the availability of and opportunities for public transport d) local car ownership levels and e) the need to ensure an adequate provision of spaces for charging plug-in and ultra-low emission vehicles. This aligns with the flexibility allowed for in Policy BE17, whereby the imposed parking standards are subject to the site's ability to minimise pressure on land and encourage the use of alternative modes of transport.
7.28 However, Policy BE12 also deals with "parking matters", but is not aligned with Policy BE17. This adds further inconsistency, in addition to Policy BE17 itself being "inconsistent" with the NPPF. It is therefore presently unsound.
7.29 Policy BE18: Green and Blue Infrastructure requires that Brentwood's existing ecological networks, open spaces, and green/blue features within the built environment are protected, planned, enhanced and managed as a part of the Borough's wider network of green and blue infrastructure. Points A-I of Policy BE18 identify the measures by which development proposals can maximise opportunities to protect and enhance green and blue infrastructure, aligning with the NPPF (section 15) "Conserving and Enhancing the Natural Environment".
7.30 However, it is presently unclear how any net gains/losses and any associated requirements would be measured/calculated, or the mechanism by which the Council or developer would deliver this. This is therefore both "unjustified" and "inconsistent", and therefore unsound.
7.31 Our Client largely supports the principle of Policy BE18, but it also unfortunately includes the requirement for a developer to ensure there is sufficient foul capacity within the local network before a development commences. Whilst our Client would liaise with Anglican Water, it is ultimately the Water Authority's responsibility to ensure sufficient capacity. Therefore as presently worded, the policy is "unjustified" and is unsound.
7.32 Policy BE19: Access to Nature seeks that major developers provide direct access to nature and that this provision is protected, planned, designed and managed as an integrated feature of the landscape. Developments in areas that are more than 1km walking distance from an accessible green open space should also seek opportunities to improve resident's experience and interaction with nature by means of design. The NPPF (section 8) "Promoting Healthy and Safe Communities" states that planning policies should be based on robust and up-to-date assessments of the need for open space, this policy is therefore deemed to be "consistent" with the NPPF and sound.
7.33 Policy BE22: Open Space in New Development seeks that major developments provide functional on-site open space and/or recreational amenities, in accordance with standards set out in the Council's Open Space Standards (see Figure 5.4 Open Space Standards and Fig 5.5 Fields in Trust Children's Play Space Standards in the Reg 19 Local Plan). Maintenance Plans should be submitted at planning application stage for all new facilities provided for exercise or recreation purposes.
7.34 The Council's Open Space Standards seek proposals which meet the Fields in Trust (Guidance for Outdoor Play Space: Beyond the Six Acre Standard) minimum standards. The FiT standards relate to provision on the basis of hectares per 1,000 population generated. The Council's Open Space Standards are considered to be effective as they are based on FiT standards and are therefore "justified" and the policy is sound.
7.35 Policy BE23: Open Space, Sport and Recreational Facilities states that permissions will not be granted for the development of designated Protected Urban Open Space or Local Green Space unless it can be demonstrated that alternative and improved provision can be created, existing open space enhanced or no additional displacement within the Green Belt caused. As with Policy BE22, where appropriate all proposals will be required to comply with the Council's Open Space Standards which aim to meet those set out by FiT. It is therefore considered that policy BE22 is "justified" in line with national guidance and therefore sound.
7.36 Policy HP01: Housing Mix sets out that all new development should deliver an inclusive and accessible environment throughout. On development sites of 500 or more units, the Council will require an appropriate mix of dwelling types, sizes and tenures to meet the identified housing needs in the borough as set out in the Strategic Housing Market Assessment (SHMA). Each dwelling is to be constructed to meet requirement M4(2) accessible and adaptable dwellings, unless built in line with M4(3) wheelchair adaptable dwellings. A minimum of 5% self-build homes is to be provided, which can include custom housebuilding and provision for Specialist Accommodation, taking account of local housing need in accordance with the criteria set out in Policy HP04 Specialist Accommodation. Where a development site has been divided into parts, or is being delivered in phases, the area to be used for determining whether this policy applies will be the whole original site.
7.37 The objective of securing accessible and adaptable homes is supported, however, it is unclear as to how the "each dwelling to be constructed to meet requirement M4(2) accessible and adaptable dwellings, unless it is built in line with M4(3) wheelchair adaptable dwellings" is a fair and reasonable request.
7.38 The supporting text refers to DCLG research which shows that, based on English Partnerships figures from 2011-2012, nearly 30% of households have at least one person with a long-term illness and over 3% have one or more wheelchair user. While nationally 3.3% of households have a wheelchair user, for households living in affordable housing this rises to 7.1%. The rates are also higher for older households and, given that the number of older person households in the borough is set to increase over the period to 2033, the Council seeks to ensure 5% of affordable housing development on proposals of 60 or more dwellings archives requirement M4(3) wheelchair accessible dwellings.
7.39 This need for "all developments" to meet this target is not set out in the evidence or in the NPPG (referred to in the supporting text) and is therefore "unjustified" and unsound.
7.40 Policy HP03: Residential Density sets out that residential development proposals will generally be expected to achieve a net density of at least 35 dwellings per hectare net or higher. Proposals for new residential development should take a design-led approach to density which ensures schemes are sympathetic to local character and make efficient use of land. Proposals for housing developments should "Make an Effective Use of Land" in line with NPPF (Section 11). This policy is therefore "consistent" with the NPPF and sound, but must provide for a degree of flexibility to allow for local circumstances.
7.41 Policy HPO4: Specialist Accommodation the Council encourages and supports proposals which contribute to the delivery of Specialist Accommodation, as referenced in the Land North of Shenfield Site allocation "other types of specialist housing (to be provided) in accordance with the Council's policy requirements". This form of accommodation includes, but is not limited to, housing for older people such as Independent Living schemes for the frail elderly.
7.42 The Council's SHMA indicates that, if occupation patterns of Specialist Residential Accommodation for older people remain at current levels, there will be a requirement for 494 additional specialist units to 2033, aligning with the requirement in the Land North of Shenfield site allocation for provision of a residential care home (a 60-bed scheme as part of the overall allocation). This policy is also "consistent" with the NPPF section 5 (para 64 b) and is therefore considered to be sound.
7.43 Policy HPO5: Affordable Housing seeks to provide a portion of affordable housing on residential developments of 11 dwellings or more or on those which have a combined gross floorspace of greater than 1,000 sq. m (gross internal area).
7.44 The affordable housing requirement relates to 35% provision in all areas of the Borough. The Council requires that the tenure split be made up of 86% Affordable/Social Rent and 14% as other forms of affordable housing (this includes starter homes, intermediate homes and shared ownership and all other forms of affordable housing as described by national guidance or legislation) or regard to the most up to date SHMA. The affordable housing is to be designed in such a way as to be seamlessly integrated to that of market housing elements of a scheme and distributed throughout the development, so as to avoid the over concentration in one area.
7.45 Viability is referred to, but the policy does not go far enough. We would recommend that the policy includes a clause which requires a viability assessment to be submitted and considered whereby schemes are unable to meet the full affordable provision, which is not included at present. The policy is therefore "unjustified" and unsound.
7.46 Policy HP06: Standards for New Housing requires that all major residential developments meet the Government's nationally described space standard. It is considered that the standard is an appropriate tool to use when considering the provision of good housing. However, this should not be limited to major development, but should instead extend to all emerging residential development, whilst allowing for the consideration of local circumstances and site-specific conditions, in order to accord the NPPF (Section 12, Achieving Well-Designed Places). The policy is therefore "unjustified" in relation to need and viability (our emphasis) in accordance with the NPPF. The adoption of nationally described space standards is also at the discretion of the LPA and should be decided upon in a local context. The policy is therefore considered unsound.
7.47 Policy HP12: Planning for Inclusive Communities refers to the need to plan for and build inclusive environments that support communities. Proposals should provide access to good quality community spaces, services and infrastructure, encouraging social interaction, ensuring inclusivity and promoting safety. The policy is deemed "consistent" with NPPF (section 8) "Promoting Healthy and Safe Communities" which states that planning policies should aim to achieve healthy, inclusive and safe places which promote social interaction, are safe and accessible, and support healthy lifestyles. The policy is therefore considered sound.
7.48 Policy HP13: Creating Successful Places seeks that proposals meet high design standards, in order to deliver safe, inclusive, attractive and accessible places. Elements A-M of policy HP13 identify measures considered to create successful places, in accordance with section 12 of the NPPF on "Achieving Well-Designed Places". The NPPF (para 128) states that design quality should be considered throughout the evolution and assessment of individual proposals. Policy HP13 is therefore considered to be "consistent" with the NPPF and sound.
7.49 Policy HP16: Buildings Design seeks for development to be well designed and of a high quality, having regard to Development Management criteria including scale, density, layout, siting, character and appearance. This policy is considered to be "consistent" with the NPPF having particular regard to Section 12 on "Achieving Well-Designed Places" and therefore sound.
7.50 Policy PC02: Job Growth and Employment Land seeks that provision is made for 5,000 additional jobs in the Borough over the Plan period at a rate of 250 per year. NPPF Section 6 on "Building a Strong, Competitive Economy" sets out that planning policies should support economic growth, in order to create jobs and prosperity by taking a positive approach to sustainable new development. The strategic allocation at Land North of Shenfield supports economic growth and creates new opportunities and is "consistent" with national guidance and is sound.
7.51 Policy PC03: Employment Land Allocations highlights areas allocated by the Council for general employment and office development. Para 82 of the NPPF states that planning policies should recognise and address the specific locational requirements of different employment sectors. The allocations set out in policy PC03 are informed by the wider spatial strategy, which aims to retain the Borough's character and encourage employment growth in suitable locations, in accordance with national planning policy. This policy is therefore deemed to be "consistent" with the NPPF and considered to be sound.
7.52 Policies NE01: Protecting and Enhancing the Natural Environment (inc SSSIs) and NE03: Trees, Woodland, Hedgerows (inc Local Wildlife Site, Local Nature Reserves) work to restrict development that would have a detrimental effect on, or result in the loss of, significant landscape heritage or a feature of ecological importance.
7.53 Our Client wholly supports the principles of both of these policies, albeit as presently worded, they both contain contradictory requirements: Policy NE01 (para B) states that proposals that lead to deterioration or loss of the Borough's designated and non-designated biodiversity assets will not be permitted; whereas Policy NE01 (para C) goes on to state that where adverse impacts are unavoidable they must be adequately and proportionally mitigated (ie it appears to allow for deterioration where they are unavoidable and can be suitably mitigated).
7.54 Policy NE03 (para A) contains a similar contradictory approach to the provisions of the remainder of the policy - as with Policy NE01.
7.55 In the light of this both Policy NE01 and Policy NE03 are not inconsistent with each other, they are also "inconsistent" with National policy, "unjustified" and therefore unsound.
7.56 Policy NE05: Air Quality seeks to restrict development, which would directly or indirectly, impact air quality within the Borough. Measures to offset or mitigate those impacts are introduced as part of proposals to ensure that receptors would not be subject to unacceptable risk as a result of poor air quality. This policy is "consistent" with the objectives of the NPPF (para 181) and is therefore considered sound.
7.57 Policy NE06: Flood Risk requires that development avoid flood risk to people and property, managing any residual risk and taking account of the impacts of climate change. Developments should be located in areas with the lowest probability of flooding (Flood Zones 1 & 2). Where development is located within Flood Zone 3, the Exception Test will apply.
7.58 The NPPF (section 14) "Meeting the Challenge of Climate Change, Flooding and Coastal Change" states that inappropriate development in areas at risk of flooding should be avoided by directing development away from the areas at the highest risk. The majority of Policy NE06 therefore aligns with National guidance and therefore mostly sound. However, and as presently worded, it suggests tat applicants may be obligated to set aside land to provide flood management to benefit areas outside of that development. This is unduly onerous, inconsistent with National policy and therefore unsound.
7.59 Similarly, the entirety of a development area does not need to remain operational at times of flood (such as access roads), if there is an alternative safe means of escape that is provided. Subsection c) of Policy NE06 is therefore not justified and also unsound.
7.60 Policy NE09: Green Belt seeks that the Metropolitan Green Belt within Brentwood Borough will be preserved from inappropriate development so that it continues to main openness and serve key functions. Policy NE09 states that all development proposals within the Green Belt will be considered in accordance with the provisions of section 13 of the NPPF on "Protecting Green Belt Land". It is therefore considered that policy NE09 is "justified" and sound, in the light of national policy.
7.61 Policy NE13: Site Allocations in the Green Belt states that sites allocated to meet housing need, within the Green Belt, will be expected to provide significant community benefits. These are the "exceptional circumstances" for sites to be removed from the Green Belt to allow development to take place, providing new defensible boundaries and protecting the open countryside. The NPPF (para 138) states that, where it has been concluded necessary to release Green Belt land for development, plans should give first consideration to land which has been previously-developed and/or is well-served by public transport.
7.62 The allocated "Officer's Meadow" site provides opportunities for sustainable development and transport modes to be maximised, with its close proximity to Shenfield railway station, in accordance with National policy, leading to the consideration of Policy NE13 as "consistent" with the NPPF and sound.
7.63 The overall approach within the Development Management related policies is supported, however amendments to policy/Appendices of Local Plan is recommended in places as set out above. This would ensure robustness in terms of delivering a sound Local Plan that is positively prepared, justified, effective and consistent with national planning policy.
8.0 CONCLUSION
8.1 The Regulation 19 "Pre-Submission Local Plan" consultation document is supported. These representations fully support the allocation of Land North of Shenfield, which includes our Client's land at "Officer's Meadow". These representations focus mostly on land within our Client's control and are supported by a series of accompanying technical reports that support the proposed allocation.
8.2 Our Client supports the wider and comprehensive development of Policy RO3: Land North of Shenfield, which could ultimately for circa 825 dwellings (inc affordable provision).
8.3 Specifically, the land controlled by our Client represents the largest area of land within Policy RO3 and is largely supportive of the policy requirements set out in the Local Plan. Our Client is keen to work closely with the Borough Council and adjoining landowners to provide a comprehensive approach to development, and our Client's elements would comprise:
* Circa 510 dwellings (inc. Affordable provision)
* A new Local Centre, inc. potential healthcare;
* A 60-bed care home
* Significant areas of "Green" and "Blue" Infrastructure;
* Other community facilities, inc. sports provision.
8.4 These representations have also set out our Client's support of working closely with the adjoining Shenfield High School to provide for enhanced educational facilities. This would be in the form of funding towards on-site Primary provision to help create a "through-school", plus financial contributions to existing secondary provision (if required).
8.5 We would welcome the opportunity of discussing our concerns, with suggested amendments with BBC and ECC Officers at the earliest opportunity.
8.6 Subject to a number of modifications as recommended in this report, we consider the Local Plan to be largely sound in accordance with the NPPF.

Attachments: