The identification of an employment-led development in the south-west of the borough is supported. Such a location is well-connected to the strategic highway network, which as set out above, facilitates connections to other key employment centres. As such, the proposed approach in this regard is justified.

Full text:

1. Introduction
1.1 These representations have been prepared by Strutt & Parker on behalf of St Modwen Developments Limited ("St Modwen"). They are submitted pursuant to Brentwood Borough Council's (BBC) Pre-submission Version of the Regulation 19 Consultation Draft Local Plan ("Draft Local Plan"), and in particular, with regard to the proposed allocation of the Land south of the A127 at Junction 29 as the proposed Brentwood Enterprise Park (BEP).
1.2 This representation sets out St Modwen's position in relation to the commercial site specific allocation ("BEP Site") which is proposed by Policy E11 in the Draft Local Plan. St Modwen has an interest in the BEP Site pursuant to a development agreement dated 23 June 2015. The freehold owner of the BEP Site is Christopher Scott Padfield.
1.3 The draft allocation proposed by Policy E11 is the single largest employment allocation within the Draft Local Plan, comprising a developable area of 25.85ha of employment land. The BEP seeks to deliver approximately 2,000 jobs in a sustainable location. The BEP Site therefore plays a particularly important role in providing a significant element of BBC's employment land requirements. The BEP site will contribute significantly to the provision of jobs to support the growth of the borough.
1.4 Representations have previously been made on behalf of S&J Padfield and St. Modwen in respect of this site throughout the plan making process and most recently to the 2018 Draft Local Plan - Preferred Site Allocations Consultation.
1.5 The BEP Site is located at M25 Junction 29 to the south of the A127. It should be noted that another employment site included within the Draft Local Plan, at Policy E10 (Codham Hall Farm), is situated to the north of the A127.
1.6 This Regulation 19 representation is focussed on the soundness of the Local Plan, as per paragraph 35 of the NPPF (i.e. whether this draft Local Plan is positively prepared; justified; effective, and consistent with national policy); and legal compliance.
1.7 The Draft Local Plan represents the proposed final version of the Local Plan for the borough, and is supported by a raft of technical studies and evidence.
1.8 Due to the binary nature of consultation at this stage (which is recognised is a function of the regulations1) where changes are suggested to ensure the Local Plan is sound and / or legally compliant, these are expressed as objections. However, we wish to stress that fundamentally, and particularly in relation to the proposed allocation of new employment land at the BEP Site, we support the Draft Local Plan.
Brentwood Enterprise Park
1.9 The BEP provides in the region of 26ha of employment land as part of a successfully masterplanned proposal within a wider site of 35.5ha, to also include ancillary landscaping works. It is intended that the proposed development at the BEP Site will provide new floorspace for a range of B-use classes, supporting jobs and employment growth in a range of sectors including (but not necessarily limited to) storage & distribution, office space, and professional services.
1.10 The following sections set out the proposals in the context of the Draft Local Plan and provide commentary on the draft policies insofar as they are relevant to the delivery of new employment floorspace, and particular in respect of the BEP Site allocation at Policy E11.
1.11 Where any concerns are raised, specific changes to the relevant policies are sought and these are indicated in the following representations in order to assist BBC in ensuring the Local Plan is sound, in terms of being positively prepared, effective, justified and consistent with national policy.
1.12 St. Modwen requests the right for its professional advisors to provide further responses on any matters appropriate to their land interests at the relevant sessions of the examination of the submitted Local Plan.
2. Policy E11 - Brentwood Enterprise Park
2.1 We wish to make clear that we support the principle of this policy and the vast majority of it is sound. However, we consider there are elements of this policy which are not effective and justified, and therefore require modification. As such, and given the binary nature of consultation at this stage, this response is expressed as an objection.
Policy E11 part C d)
2.2 We do not concur with part C d) of Policy E11. This part of the policy presently requires that the public right of way is preserved and enhanced. Whilst it is recognised that the right of way will need to be maintained, this may be through appropriate diversion if required. The policy wording presently is ambiguous in this regard and may imply that the right of way must be preserved in its current form. This could pose a risk to delivery and would not be a justified and effective approach in accordance with the tests of soundness set out at paragraph 35 of the NPPF. Accordingly, we request that sub-paragraph 'd.' of part C of Policy E11 be amended so that it reads as follows:
"preserve, through diversion if necessary, and where appropriate enhance the existing Public Right of Way through the site".
Policy E11 part D c), d) and e)
2.3 Furthermore, we consider that the references to infrastructure requirements in sub-paragraphs c., d. and e. of part D of Policy E11 should be amended to make clear that such provision will be required where appropriate. The wording at present is overly prescriptive and lacks flexibility would not therefore be a justified and effective approach in accordance with the tests of soundness set out at paragraph 35 of the NPPF. It may not, for example, be appropriate to provide direct walking connection towards junction 29 and the western site boundary.
2.4 With regards to public transport links we consider it important to recognise the site is one of a number of growth locations and should not be responsible for provision of new transport links alone. As identified in the transport work undertaken by Atkins on behalf of St Modwen, there is potential for accessibility to be provided through private shuttle bus services for example rather than formal public transport or buses. We consider that this part of the policy is not adequately justified, and while provision for bus access and links to external walkways and cycle ways is supported in principle, the implementation of a wider strategy for sustainable travel and public transport should be delivered by the appropriate local authorities, with relevant contributions sought from developers where the legal tests relating to planning obligations (i.e. regulation 122(2) of the Community Infrastructure Levy Regulations 2010) are met. In this regard, we are aware of the strategy put forward for public transport in this area, as outlined in Appendix G of the Transport Assessment. This is discussed later in the representation, and the wider interaction with other allocations in the Southern Growth Corridor concerning the implementation of this strategy is supported.
2.5 We consider this part of the policy should be amended to read:
c. provide well-connected internal road layouts which allow good accessibility for bus services or sustainable transport measures where appropriate
d. potential travel planning measures and connection to new public transport links with the surrounding area; and
e. provision for walking and cycling connections within the site and to the surrounding area where appropriate
Delivery of the BEP
2.6 The landowners and St. Modwen are committed to delivering the BEP scheme and continue to actively engage with the Council on a pre-application basis, and in terms of the delivery of the development proposals generally.
2.7 The reference in Appendix 2 to the BEP Site's delivery forecasting being "Years 5-15" should be amended instead to state: "Years 1 - 15" in order to reflect the intentions of the landowners and St Modwen and in particular the potential for early delivery of a phase of development using the existing access arrangements.
2.8 Importantly, as set out later in this representation, amendments to the allocation area and policies map are also required in order to provide for flexibility with regards to access options.
2.9 Other relevant policy considerations with regards to the allocation at Policy E11 and the supporting evidence base are set out below.
Green Belt
2.10 Firstly, addressing the principle of Green Belt release, this is considered justified and consistent with national policy in the case of Policy E11; as well as being necessary to ensure the Local Plan is sound.
2.11 The NPPF states that if Green Belt boundaries are to be altered then this should be done through preparation or updating of plans (see paragraph 136), and only when exceptional circumstances are fully evidenced and justified.
2.12 The NPPF does not define what constitutes 'exceptional circumstances'. However, case law does provide assistance in this regard. In particular, the judgment of the High Court in Calverton Parish Council v Nottingham City Council & Ors. [2015] EWHC 1078 (Admin) suggests (see paragraph 51 of the judgment) the following matters are relevant in the consideration of whether exceptional circumstances exist:
(i) the scale of the objectively assessed need;
(ii) constraints on supply/availability of land with the potential to accommodate sustainable development;
(iii) difficulties in achieving sustainable development without impinging on the Green Belt;
(iv) the nature and extent of the harm to the Green Belt; and
(v) the extent to which impacts on the purposes of the Green Belt may be mitigated as far as practicable.
2.13 In respect of the first three points, through the plan-making process, BBC has evidenced a substantial need for development; and there are clearly severe limitations on options to meet this need without altering the Green Belt. Similarly, options to deliver sustainable development - including through the realising the opportunities the Brentwood Enterprise Park presents - without amendments to the Green Belt boundary are very limited.
Landscaping
2.14 In addition, the allocation also seeks to deliver landscaping and groundworks to further improve the visual amenity between the site and the surrounding landscape. Given the Green Belt location of the site, we consider that provisions for landscaping within the site allocation policy is reasonably justified.
2.15 Furthermore, the Landscape Sensitivity and Landscape Capacity Study: Potential and Strategic Allocation Options report by Crestwood on behalf of BBC is supported. We note in particular Appendix L3 of the Landscape Sensitivity and Capacity Study finds that the site is Low Landscape Sensitivity, Low Landscape Value, with a resultant High Landscape Capacity (a high capacity site being more readily able to accommodate development).
2.16 Appendix L4, the Landscape Character Assessment (LCA), states Moderate Overall Sensitivity to Change, and considers the Site within the LCA as being Low (as L3 above). Appendix L5 summarises the capacity for development as High (the highest it can be). We agree that the site should be preferentially prioritised for development when considering effects on the landscape, and consider that the site is justified for inclusion in the plan on this basis. Further, it is considered the plan has been positively prepared in the way it has considered and identified sites that have are shown to have capacity in terms of effect on the surrounding landscape.
Economic Evidence Base
2.17 The Draft Local Plan evidence base includes input on the economic forecasts for the Council, including commentary on job growth, employment land requirements and how they relate with growth in other areas. The provision of around 2,000 jobs will undoubtedly aid in achieving the social aspect of sustainability in respect of the NPPF, providing employment opportunities to facilitate the growth of the borough.
2.18 The number of jobs and job capacity is largely derived from the estimate of employment floorspace. The Economic Futures document has estimated the number of jobs to be provided on the basis that all employment allocations come forward, while also stating that the purported numbers are indicative. Paragraph 4.1 sets out the methodology for calculating job capacity, with the report going on to state that BEP will provide a total of 4,070 new jobs. We do not consider this figure to be justified, principally because it is based on an over-assumption of the amount of office space that may be provided. The number of jobs will depend on final mix of uses however estimates based on employment density guidance indicates in the region of 2,000 jobs, due mainly to the lower estimation for the amount of office space to be provided by the scheme.
2.19 The economic evidence base supporting the quantum and location of employment land is considered in more detail in Section 5 of this representation in the context of Policy PC03 - Job Growth & Employment Land.
Transport and Access
2.20 The BEP Site allocation is ideally located to provide direct access to the strategic road network for the commercial vehicles that will be generated by the proposed business uses on the site. This will avoid the adverse impacts of commercial vehicles, including HGVs, on the local road network and local residents, that would be likely to occur if these business uses were located on an alternative site or sites that did not have direct access to the strategic road network.
2.21 As further discussed within this representation, studies have shown that access to the strategic road network for BEP which is compatible with the LTC proposals for J29 is achievable, and therefore the allocation of the BEP is not compromised by the LTC, should it be delivered.
2.22 The transport assessment undertaken to assess the potential impact of the Local Plan on the road network adopts a methodology that forecasts future demand based predominantly on historic trends, in terms of trip generation and background traffic growth. It does not fully account for the likely demand suppression that will occur due to worsening traffic congestion on the road network, i.e. constrained network capacity, which is known to be taking place and driving changes in travel behaviour including:
a. Fewer and short journeys being undertaken through more working from home, combining trips, ordering of goods and services over the internet, etc.
b. Shift to using alternative modes of transport such as public transport, walking and cycling
c. Changes in the timing of journeys to avoid the most congested period
2.23 Additionally, emerging internet based services, such as ride sharing, mobility as a service and demand responsive public transport, are likely to further change the way that people choose to travel in the future, all of which are forecast to temper or lessen future traffic growth. The transport assessment undertaken in support of the Local Plan recognises that these changes in how people are travelling are already taking place and are likely to accelerate, with evidence of this now being seen in the most recent travel statistics.
2.24 Consequently, the cumulative traffic demand on the road network forecast in the Local Plan should not be interpreted as the likely outcome of the Local Plan site allocations. Instead it should be considered as an indicator of overall travel demand to inform future policy aimed at accommodating it in a more sustainable way that avoids the 'very worst case' forecast traffic growth. The traffic forecasts in the transport assessment should not, therefore, be relied upon to inform specific requirements for road network capacity enhancement schemes, since to do so would very likely result in unnecessarily excessive and expensive schemes.
2.25 It is also noted that the trip generation forecast for BEP used in the Local Plan transport assessment is based on the site having an employment capacity of approximately 3,000 jobs, which is considered to be an over estimate. Based on industry standard employment densities for the likely mix of business uses on the BEP Site which is proposed by St Modwen, the employment capacity is forecast to be approximately 2,000 jobs. Therefore, the Local Plan transport assessment overestimates the likely trip generation for BEP by as much as 50%.
2.26 The indicative plan of potential sustainable transport linkages shown in Figure 3.14 - Southern Growth Corridor: Sustainable Transport, included in the Infrastructure Delivery Plan should only be seen as an example of how the proposed development sites along the A127 could possibly be linked by a package of sustainable transport measures. It should not be seen as representing the specific measures that will be implemented. This is because further detailed evaluation is required to establish if they represent the most appropriate proposals, taking account of the wide range of sustainable transport measures that could be adopted by the different sites, and to confirm their deliverability (recent discussions with other parties involved with land along the A127 have mentioned the use of compulsory purchase powers, which can be a costly and lengthy process).
2.27 While recent engagement with David Ubaka Placemakers and other stakeholders in the Southern Growth Corridor has shed further light on the proposed sustainable transport measures, there is considered to be more work required before a detailed solution is available. It should therefore be recognised that the package of sustainable transport measures that will be implemented for the sites along the Southern Growth Corridor may ultimately be different to those presented in the Infrastructure Delivery Plan. The IDP itself is acknowledged to be a 'live' working document (see paragraph 1.2) and hence the final package of sustainable transport measures will be agreed at the planning application stage for the relevant development sites along the Southern Growth Corridor.
2.28 Fundamentally however, the allocation of sites including BEP, Childerditch Industrial Estate, West Horndon and DHGV along the A127 all make a strong business case for the implementation of a robust and efficient package of sustainable transport measures.
Lower Thames Crossing & Additional Land Required for Access
2.29 The BEP Site benefits from existing access to M25 junction 29 that can provide for a first phase of development and, in enhanced form, for access on a permanent basis should the Lower Thames Crossing not proceed.
2.30 Should the Lower Thames Crossing come forward, it is noted that latest proposals include potential slip roads at junction 29. This includes one running from the A127 westbound onto the M25 southbound at junction 29. The current proposals for the LTC would therefore conflict with both the existing and currently proposed access arrangements for the BEP.
2.31 Extensive liaison has been undertaken and will continue to be undertaken with representatives from Lower Thames Crossing, Highways England, Essex County Council, Peter Brett Associates and all other relevant parties. The Highways England LTC team have confirmed their commitment to proactively find solutions to allow BEP and the LTC to come forward in a manner which is mutually acceptable.
2.32 Key to this is an acknowledgement that certain land around junction 29 and the A127 will likely be needed for transport works should the LTC project proceed as currently envisaged. Accordingly, such land should be acknowledged in the Local Plan as being released from the Green Belt should it be required to provide works to allow for access to the BEP Site.
2.33 The plan at Appendix B shows the additional land that may be necessary to be released from the Green Belt in order for it to be developed for transport works to facilitate access to the BEP Site. Such release would only take effect if the land was needed for transport works to deliver access to the BEP Site.
2.34 At present, the options set out in Appendix B include land to facilitate access to junction 29, or to facilitate access to the BEP Site from the B186/Warley Street. This will likely include additional land to the north of the A127 to allow for potential access via junction 29 linking via an improved bridge, as well as land to the east including around the A127/B186 junction to allow for potential junction and slip road improvements. This includes land to the south along Warley Street to allow for potential realignment of the road / roundabout to provide access to the site.
2.35 Policy E11 must therefore be amended to acknowledge the above access options and to provide for the land to be released from the Green Belt for such purposes should that be required.
2.36 It is proposed that the policy wording seeks to ensure that works on this land are kept to the minimum necessary to facilitate the required access and highway improvements. It should also be noted that access infrastructure is likely to be at grade (or below) existing levels and would not add any significant volume/built structures to the land, and therefore any impact on openness would therefore be limited.
2.37 The need to maintain the possibility of achieving safe, satisfactory access arrangements to the largest employment land allocation in the borough in the context of the LTC is considered an exceptional circumstance, and therefore warrants this additional land to be removed from the Green Belt if required.
2.38 Further, Paragraph 146 of the NPPF sets out the forms of development that are not inappropriate in the Green Belt, provided the preserve openness and do not conflict with the purposes of including land within it. This includes, at point c), local transport infrastructure which can demonstrate a requirement for a Green Belt location.
2.39 This approach has been used in the nearby East Herts District, where the recently adopted East Herts District Plan 2018 found that in order to provide necessary highway capacity to meet the wider needs of existing residents and businesses, as well as for future growth, the connectivity over the River Stort requires significant improving. In accordance with the NPPF, the Council considered it appropriate for new crossings to be located across Green Belt land, and as a result of the adopted plan, East Herts District Council are working with other LPAs and Authorities to explore landownership associated with the delivery of additional transport capacity, and also reviewed the use of CPO powers if deemed necessary. Whilst this approach could also be adopted in Brentwood there is a need for the Local Plan to provide for release of land from the Green Belt for access should this be required.
2.40 It is additionally noted the Brentwood IDP indicates the potential implementation of sustainable transport measures around the site. The release and identification of such land on the proposals map is therefore an important requirement for the Local Plan.
2.41 In order to achieve the above, we request that the first paragraph of Policy E11 is amended to read as follows:
"Land south east of M25 Junction 29, as shown on Appendix 2, is allocated to provide high quality employment development and a significant number of jobs.
In addition, the areas of land (shown on the plan at Appendix 2) shall be released from the Green Belt for works to provide access to the site should this be necessary. The final extent of the land that is released for such works shall be identified in a planning application and shall be kept to the minimum necessary to provide an appropriate and safe access to the Brentwood Enterprise Park Site along with any associated highway and infrastructure works.
Development proposals for the Brentwood Enterprise Park site should consider the following:"
2.42 The plan at Appendix 2 to the Draft Local Plan will need to be updated to be in line with the plan attached at Appendix B of these representations.
3. Section 3 Spatial Strategy, Vision and Strategic Objectives
SO1: Manage Growth Sustainably
3.1 We support strategic objective SO1. In order for the Local Plan to be sound, it is essential that it ensures the borough's growth is managed, and in a sustainable manner. As per the NPPF (paragraph 8), achieving sustainable development means pursuing environmental, social and economic objectives; recognising these objectives are interdependent and mutually supportive. It is critical that these objectives are carried forward into the detailed policies and allocations of the Local Plan.
SO3: Deliver Sustainable Communities with Diverse Economic & Social-cultural Opportunities for All
3.2 We support strategic objective SO3. In particular, we welcome its recognition of the importance of the economic climate to the borough's communities. We support the recognition of the importance of identifying opportunities for economic growth - the NPPF is clear on the need for Local Plans to look to realise opportunities for development.
3.3 Also set out in the Strategic Objectives section is the reasoning behind the identified key growth areas. We broadly support the identified key growth areas and the strategy, which seeks to deliver growth along the established transport corridors of the A127 and A12. Paragraph 3.21 part b) sets out the proposals for delivering employment growth in the M25/A127 areas.
Growth Areas
3.4 We support the identification of the opportunity to provide a strategic employment allocation at the BEP Site. Such an approach accords with the Draft Local Plan's strategic objectives pertaining to the identification of economic growth opportunities, and thereby assists in ensuring this objective is effective. The BEP would deliver significant economic, social and environmental benefits, allowing it to come forward as a sustainable growth location to support the growth of the borough.
3.5 Fundamentally, the provision of employment land provides job opportunities and space to deliver economic growth not just in Brentwood, but throughout the region. The well-connected highway network and provisions for sustainable transport links will ensure that the BEP Site provides employment space that will make best use of its location, set within easy reach of London, DP World, the Dartford Crossing and other notable businesses and employment centres. It is recognised in the plan that other proposed infrastructure projects, such as the Lower Thames Crossing, are most beneficial to distributors and companies that are of a certain scale, who will require larger spaces and facilities from which to run their businesses. As such, employment proposals such as BEP are required not just to provide economic growth and opportunity in their own right, but also to harness the opportunities granted by future infrastructure.
3.6 The provision of jobs and employment to support the borough's population is key and the social benefits of the BEP development would principally derive from the number of jobs provided by the development, enabling future and existing residents of the borough to live and work within the locality. It is intended that a planning application will be progressed immediately and delivery on site can come forward over the next 1-15-year period, potentially providing several years' worth of construction jobs and contracts in the construction sector alone.
3.7 Currently, St. Modwen's strategy continues to be for a planning application to be prepared for submission alongside the examination in 2019, targeting determination following receipt of the Inspector's Report and adoption of the Local Plan. This pro-active approach, if reflected in an amendment to the BEP Site's delivery forecast, will lead to an effective plan that can allow for the site to come forward expediently to address the borough's employment land needs.
3.8 The site is a sustainable location for development for employment uses owing to its location adjacent to the strategic highway network. Supporting large-scale employment growth here negates the need for the delivery of further employment uses in less sustainable and less suitable locations.
Figure 3.1 - Key Diagram
3.9 The identification of an employment-led development in the south-west of the borough is supported. Such a location is well-connected to the strategic highway network, which as set out above, facilitates connections to other key employment centres. As such, the proposed approach in this regard is justified. The allocation of the BEP Site for new employment development is clearly very much consistent with national policy; and will make a significant contribution to ensuring the Local Plan is positively prepared. Indeed, if the Key Diagram were not to identify and promote realisation of such an opportunity, we consider that such an approach could not be consistent with national policy or justified.
4. Section 5 - Transport and Connectivity
4.1 Successful delivery of the allocated development within the growth areas requires a grounded appreciation of the transport issues along the various corridors. Section 5 of the Draft Local Plan covers how the Plan seeks to develop a resilient built environment. Page 92 sets out the Transport and Connectivity related policies.
4.2 We support part C of Policy BE11: Strategic Transport Infrastructure, which sets out how the Council will continue to liaise with Highways Authorities and other key stakeholders to ensure the necessary improvements to ensure highway infrastructure capacity is maintained. We welcome BBC's proactive approach in this respect.
4.3 We support the wording in Paragraph 5.105 relating to the South Brentwood Growth Corridor, particularly the intent for BBC to work proactively with developers and stakeholders along the A127. We recognise the need to work collaboratively to address any transport impacts the BEP development may have on the highway network.
4.4 We concur with paragraph 5.107, which raises doubt on the scale and timelines associated with the impacts of the proposed Lower Thames Crossing. Having liaised extensively with the LTC teams, we are aware of the proposals and their relationship with the Brentwood Enterprise Park. We can confirm that the LTC teams and ourselves are committed to the realisation of both projects in a mutually acceptable manner and discussions are on-going in this regard.
4.5 Policy BE13 should acknowledge that site specific policies provide details of how sustainable travel opportunities will be achieved in respect of each site. Accordingly, Policy BE13 should be amended so that it is made clear that it does not have the effect of imposing any requirements on the allocated sites that are in addition to those set out in the individual site allocation policies.
5. Section 7 - Prosperous Communities
5.1 The Economic Aims and Strategy priorities set out within Section 7.3 are supported. We consider these will help facilitate sustainable development, which is of course required to ensure the Local Plan is sound.
5.2 The Brentwood Enterprise Park will provide a range of employment types in a sustainable location. The proposals have been designed to reflect the need for a greater proportion of B-type use classes, supporting jobs in a range of industries that will make the most of the site's location adjacent to an established highways network, fundamentally meeting Economic Aim A1.
5.3 The scheme will provide in the region of 2,000 jobs on an area that makes up around 54% of the land identified for employment use within the Draft Local Plan. Economic Aim E2 seeks the provision of high value, diverse employment uses that will provide a significant number of high skilled and quality jobs.
PC02: Job Growth and Employment Land
5.4 The Draft Local Plan has as part of its evidence base a document entitled 'Brentwood Economic Futures 2013-2033', prepared by Lichfields, which sets out the economic evidence base in support of the Local Plan. We have reviewed the available economic evidence and also considered the conclusions drawn from that document, in particular how it determines the amount of employment land required to support the needs of the borough throughout the next plan period.
5.5 Principally, we have some reservations as to the quantum of employment land that is proposed under the various scenarios considered as part of the study. While each of the scenarios has considered relevant factors conducive to understanding the amount of employment land required, we consider that the Council should be considering the Experian based forecasts set out under Scenario A as a minimum requirement of employment land. The other scenarios do not provide an adequately robust assessment of the land required to support the necessary employment growth.
5.6 In terms of the quantum discussed within the evidence base, the Local Plan forecasts a need between 20.3 ha (Scenario A) and 8.1 ha (Scenario D) for land to be used for B-class employment uses. The Plan seeks to allocate an additional 47.4ha (with BEP accounting for around 55% of this total allocation), allowing for the compensation of the loss of 21.ha of current employment land to other uses. While it is positive that the Council has sought to address the loss of existing land, while also seeking to provide over and above the highest amount required by the Scenario A (Experian figures generated using SHMA data), we would consider the Council could be more proactive by allowing for a greater buffer beyond the requirement of land set out under Scenario A. Such a buffer would ensure flexibility, and therefore effectiveness, should any of the smaller site allocations not be delivered within the timescales envisaged.
5.7 The site's location on the outskirts of London is also considered to assist in addressing the trend for the reduction in B-class land uses within the capital. Situated adjacent to the M25 and A127, the site presents an attractive destination for London firms requiring B1c/B2 and B8 floorspace. Elsewhere in Brentwood, this ability to capitalise on the migration of such employment uses from London is not being realised, as the supply of land for industrial uses is below any of the closest competing Boroughs (Brentwood's supply of industrial land was just 205,000 sq m in 2015/16). In order to attract industrial employers and capture employment opportunities migrating from London, sites like Brentwood Enterprise Park are required to provide the required space and land uses.
5.8 Therefore, not only is BEP the foremost important asset for the Borough in terms of employment land, but especially as an option for the development of B1c, B2, and B8. The loss of the land allocation at BEP would seriously impede the borough's ability to grow in the future, and to take advantage of likely future geographical changes in location and demand for B-class employment uses.
5.9 When further considering and allocations required to deliver the number of jobs to be provided, it is critical that the Local Plan:
a) Provides for sufficient flexibility to be able to respond to rapid change (as required by paragraph 11 of the NPPF); and
b) Does so in a manner that ensures the Green Belt boundary will not need to be reviewed before the end of the plan period (paragraph 136 of the NPPF).
5.10 In respect of this, it must be recognised that the borough is predominantly Green Belt. The Council has evidenced that the current Green Belt boundaries are required to be amended by the new Local Plan (which is appropriate, as per paragraph 136 of the NPPF). In reviewing the Green Belt boundaries at this juncture, it is important that the Council is confident that the amended Green Belt will not have to be altered again in five years, when the Local Plan is required to be reviewed. As such, in considering the scale of land to be allocated to meet development needs through this Local Plan, it is important that a precautionary approach is taken so that the amount of land that is released from the Green Belt is sufficient to ensure delivery of the sites that are allocated in the Local Plan for development.
5.11 We therefore object to Policy PC02, on the basis that at the very least it should be amended such that land allocations are expressed as minimums. If Policy PC02 is amended to state that the allocation of 47.39 ha of new employment land is a minimum this will ensure that the plan is positively prepared, effective and consistent with national policy.
7.19 and 7.20 Employment Land Provision
5.12 Having regard to our comments in respect of Policy PC02 - the need to ensure flexibility; and the need to ensure the revised Green Belt boundary will be capable of enduring beyond the plan period - the Local Plan must use the higher growth forecasts and plan accordingly. In addition, it is important that the Council is satisfied the proposed allocation of employment land is sufficient in respect of the requirements outlined in our response to Policy PC02 regarding the need for both flexibility and for the Green Belt to be able to endure during the plan period.
Policy PC03: Employment Land Allocations
5.13 Policy PC03 sets out a number of considerations which are intended to relate to existing and proposed employment sites identified in Figure 7.6. Brentwood Enterprise Park is listed as one such site in Figure 7.6 of the Draft Local Plan.
5.14 The Draft Local Plan also proposes a specific site allocation policy for the BEP, (Policy E11).
5.15 Policy PC03 contains a prescriptive list of the circumstances when non B-class uses will be permitted in respect of "Redevelopment or change of use of business, office, general industry and distribution". Given that Policy E11 refers to the possibility of development for uses other than B-class uses i.e. for "any associated employment generating sui generis uses" we assume this part of Policy PC03 relates only to existing employment sites. However, in order for the policy to be effective, the policy should be amended so that the opening paragraph reads as follows:
"Within those areas allocated for general employment and office development, set out in Figure 7.6 and on the Brentwood Policies Map, the Council will seek to achieve and retain a wide range of employment opportunities. Further details in this regard are set out in the individual site allocation policies.
In relation to existing employment sites redevelopment for non B-class uses will only be permitted where:"
Paragraph 7.23 - b) part i)
5.16 The reference to BEP within the context of opportunities for growth within the South Brentwood Growth Corridor is welcomed and supported. However, in our view the reference to "redeveloping brownfield land" in sub-paragraph (b)(i) is unnecessary given that the BEP Site has been assessed by the Council and considered to be suitable for strategic employment development. Accordingly, for purposes of clarity we request that sub-paragraph b. i. is reworded to read as follows: "developing land at Brentwood Enterprise Park (see Policy E11)". This would also correct the typographical error of "Site E01" which should instead refer to E11.
Paragraph 7.25
5.17 The NPPF calls for Local Plans to make use of development opportunities. The recognition that the Lower Thames Crossing represents an opportunity which Brentwood Enterprise Park will realise is supported, as this is consistent with relevant national planning policy.
PC05 - Replicates Site Specific policies
5.18 As currently worded, the Draft Local Plan is ambiguous as to whether this policy is intended to apply to proposed as well as existing employment land. If it is intended to apply to new allocations, then similar concerns to those that we expressed in relation to policy PC03 also apply here. To ensure the Local Plan is effective, to avoid inconsistency, and so that it is clear how a decision maker should react to development proposes, Policy PC05 should be amended to make clear it does not apply to the new employment site allocations because these policies have (as applicable) clear 'Development Principles' and 'Infrastructure Requirements'.
6. Section 8 - Natural Environment
NE08 - Lighting Restrictions
6.1 We support what we have inferred is the intended objective of this policy: to ensure lighting schemes are appropriate for the use to which they are associated, and potential harm arising from lighting schemes is minimised. In respect of policy BE08 A a) we suggest that, order to provide greater clarity as to how a decision maker should react to development proposals, it is acknowledged that employment land may well require the provision of lighting for security and operational purposes.
Policy NE9: Green Belt
6.2 It is considered necessary (in respect of the effectiveness of the Local Plan and compliance with the NPPF, in relation to the need to ensure policies are not ambiguous) that the Local Plan makes clear where land is being removed from the Green Belt (such as in respect of the allocation contained in Policy E11). It is suggested that text is added to this policy to clarify that the Local Plan is altering the Green Belt boundaries.
Policy NE13: Site Allocations in the Green Belt
6.3 The policy should be amended to provide clarity that sites are being removed to enable employment needs to be met, in addition to housing. It should be recognised that the development of employment uses has intrinsic community benefits, with resultant social and economic gains.
Potential additional land required for access to Brentwood Enterprise Park
6.4 As covered in elsewhere in our representation, owing to factors arising from the proposals for the Lower Thames Crossing (LTC), it is considered that additional land may need to be released from the Green Belt in order to ensure appropriate access to the BEP Site can be provided.
7. Strategic Environmental Assessment / Sustainability Appraisal
7.1 The Draft Local Plan is accompanied by a Sustainability Appraisal that has been prepared by AECOM, which assesses all sites put forward against a number of criteria in order to ascertain an overview of the sustainability credentials of a site or location. The SA concludes that the BEP Site is suitable for the intended proposals when considered on its own merits and when considered against other options within the borough.
7.2 Turning to the more specific aspects of the proposed allocation, the SA finds that the site scores moderately well when considered against other options for growth put forward at the various stages of plan preparation. While we agree with the allocation, and consider that the SA supports the sustainability of the site location, we consider that a number of the assessed criteria could be more accurately represented.
7.3 The SA broadly supports the inclusion of the Brentwood Enterprise Park within the plan, stating all sites will have good or excellent access onto the strategic highway network, and Brentwood Enterprise Park will provide an opportunity for high-end modern premises, along with appropriate ancillary uses, e.g. a hotel.
7.4 Table C from the Sustainability Appraisal is included above, showing how the BEP site (ref 101Aii) has been assessed against the criteria set out within the plan. It is noted that the site has been scored low in respect of relationship to Local Wildlife Sites, Ancient woodland and also with regard to Air Quality Management Areas (AQMAs).
7.5 It is noted that the criteria in Table B of the SA state that the thresholds have been selected on the basis that County Wildlife Sides and Ancient Semi Natural Woodlands have a relatively low sensitivity. However, the proposed allocation at Brentwood Enterprise Park is adjacent to the Hobbs Hole, and does not directly intersect with it. While a medium score would be more appropriate in this regard, it is important to note that the proposed scheme also provide opportunities for the enhancement of the Hobbs Hole site through the provision of effective landscaping schemes and ecological management.
7.6 The criteria set out in Table B stipulates that a low score is given to sites in or adjacent to an Air Quality Management Area (AQMA), and a medium score will be given if located within a kilometre of an AQMA. Despite not satisfying either of these criteria, the site has scored low in respect of its effect on Air Quality Management Areas. The Assessment justifies this, noting that growth along the A127 corridor can be expected to lead to increased traffic in the Brentwood town centre Air Quality Management Area, which is located some 5km to the north.
7.7 The SA does however follow this up by stating that "there is some uncertainty in respect of this conclusion, given the potential to deliver significant upgrades to walking/cycling and public transport infrastructure through a focus at DHGV, as well as to deliver employment and a local centre (to include a secondary school) on-site." We support this view, and concur that the growth locations identified in the southern corridor cumulatively make a strong business case for the implementation of sustainable transport linkages and necessary infrastructure that will ultimately lessen the perceived effect on the nearest AQMAs. As such, we feel that a medium score would be more appropriate in this regard.
7.8 Finally, on the SA, it is considered to be ineffective to judge the merits of a site for employment use with regard to its proximity to services such as a GP, Primary School and Secondary School. While these services may be considered key to the delivery of successful residential allocations, they are not relevant indicators of sustainability of potential employment sites. The site has been scored low in all three aspects, due to the distance it is located from these services, and we also consider that these scores should be 'NA'.
7.9 As such, the current SA may suggest the proposed BEP is less sustainable than it actually is and this references should be updated. However, it is also relevant to note that the SA is still considered this site as a merited allocation despite this.
8. Summary
8.1 This representation has considered the Brentwood Borough Council Regulation 19 Draft Local Plan against the test of soundness as set out at Paragraph 35 of the NPPF, with specific reference made to the allocation of land for the development of the Brentwood Enterprise Park scheme.
8.2 The representation sets out how the plan, whilst fundamentally sound, is not completely justified or effective with regard to ensuring the adequate delivery of sufficient employment land to support the planned growth of the borough. Furthermore, references to certain of the draft policies and supporting evidence show that the plan should be amended to be more positively prepared and consistent with National Planning Policy.
8.3 Proposed modifications to the plan to address these matters are set out including in relation to Policy E11.
8.4 We request that we be invited to attend the relevant sessions of the forthcoming examination hearings in order that we can provide the Inspector with further oral evidence and explanation in support of these representations.
Appendix A - Letter from Highways England regarding Lower Thames Crossing
Appendix B - Potential land required for access solutions (ref: 5183535-ATK-ZZ-DR-D-0001)

Attachments:

Support

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

Representation ID: 24338

Received: 19/03/2019

Respondent: Childerditch Properties

Agent: Strutt & Parker LLP

Representation Summary:

Figure 3.1 provides a visual aid in support of the Spatial Strategy. It identifies Junction 29 of the M25 as a key location for 'Employment-led development' (Brentwood Enterprise Park) and Childerditch Industrial Estate as a location for new 'Employment land', in addition to the strategic housing-led development at Dunton Hills and the redevelopment of West Horndon. A focus on employment growth along the A127 corridor will reduce the need for additional employment sites in less sustainable locations elsewhere in the Borough. This approach is fully supported and recognizes the importance of this location for new employment opportunities. This approach is justified and demonstrates that the Plan is consistent with national policy in this respect.

Full text:

These representations have been prepared by Strutt & Parker on behalf of Childerditch Properties for Brentwood Borough Council's (BBC) Regulation 19 Pre-Submission Consultation Local Plan (PSLP) and in particular, with regards to our client's land interest on the proposed allocation Childerditch Industrial Estate. Childerditch Properties request the right for Strutt & Parker or any other professional advisor acting on their behalf to provide further responses in Hearing Statements or at the relevant sessions of the Examination in Public following the submission of the PSLP. Childerditch Properties are the sole owners of Childerditch Industrial Estate. Representations have previously been made on their behalf in respect of the site throughout the Plan making process, including at the Call for Sites stage, as part of the 2013 Preferred Options Consultation and, most recently, as part of the 2018 Draft Local Plan Regulation 18 Consultation. At present, the Estate provides some 35 units and between 700 and 800 people are employed here. All of these units are occupied and our clients continue to receive enquiries for occupation. The Estate therefore currently plays an important role in providing a significant source of the Borough's employment land and the provision of jobs. The proposed allocations provided for in the PSLP would build on the success of the Estate by creating new employment land. Located two miles from Brentwood on the A127, the Estate is ideally placed to offer future employment opportunities in a highly sustainable location with excellent transport links. Childerditch Industrial Estate is an 'island' site within the surrounding countryside, comprising a range of B1, B2 and B8 employment uses and storage yards. The proposed allocation at Childerditch Industrial Estate is referred within Policy E12 of the PSLP. The proposed allocation of additional employment land, in combination with the existing Park, will provide a developable area of approximately 20.6 hectares of employment land. Accompanying these representations is a proposed masterplan prepared by CMP Architects which, whilst indicative at this stage, demonstrates how the Estate can be more efficiently and effectively developed. This document is copied to these representations at Appendix 1. An updated Access Appraisal prepared by Journey Transport Planning is also submitted with these representations and is copied at Appendix 2. Within this document, consideration is given to the existing Estate and proposed allocations, and the cumulative traffic impacts arising from other developments in the A127 corridor. The Appraisal also considers the access from Childerditch Hall Drive onto the A127, to confirm that the proposed allocation of the site is deliverable in the context of the existing and proposed allocations referred to above. Childerditch Industrial Estate is located just to the north of the A127, approximately halfway between Junction 29 of the M25 to the west, and the junction of the A127 and A128 to the east. Other sites proposed for allocation within the PSLP also found along this section of the A127 include Brentwood Enterprise Park (Policy E11) and Land at Codham Hall Farm (Policy E10), which are located to the south and north of the A127 respectively. Given the stage of the PSLP, these representations focus on the soundness of the Plan, in accordance with paragraph 35 of the National Planning Policy Framework (NPPF). Paragraph 35 confirms that Plans are sound if they are positively prepared, justified, effective, and consistent with national policy. The PSLP is supported by an evidence base that includes a number of technical studies. These representations give regard to both the Pre-Submission Document and these studies. The following section of these representations provide comment on draft policies, with particular regard to Policy E12, and other supporting text relevant to the proposed allocation at Childerditch Industrial Estate. Our client's overall position is one of firm support for the PSLP and this is expressed where relevant in these representations. Where concerns are raised in respect of PSLP or its evidence base, specific changes will be noted to assist Brentwood Borough Council in ensuring that the Plan is sound. Regulation 19 Consultation Pre-Submission Document Section 3: Spatial Strategy - Vision and Strategic Objectives: The PSLP sets out the overarching aims of the Spatial Strategy, which includes an emphasis on 'Transit-orientated Growth'. This identifies two key transit corridors, including the 'Southern Brentwood Growth Corridor'. The PSLP focuses growth on land within the Borough's transport corridors, with strategic allocations along the A127 corridor for employment, which is justified given the aims and objectives of the Plan. The Council's strategy to direct development growth to the Borough's transport corridors is supported and has potential to provide for employment growth in locations where there is strong market demand, and to minimise environmental impacts on the wider Borough. The proposed allocation at Childerditch Industrial Estate will assist in meeting this objective, by bringing forward new business and employment opportunities along the A127 corridor. It will help support the planned residential growth within Borough. The Plan has been positively prepared in this respect. The Strategic Objectives identified within Section 3 of the PSLP are supported. Economic prosperity forms a key part of the objectives. In order to be considered sound, it is important the Plan is consistent with national policy, which seeks to enable the delivery of sustainable development. Strategic Objective SO1 seeks to direct development to the most sustainable locations and this links to the proposed allocation at Childerditch Industrial Estate. Strategic Objective SO3 supports opportunities that respond to the changing economic climate. Childerditch Industrial Estate is a traditional industrial estate that has developed over many years, as illustrated in the indicative proposed masterplan prepared by CMP Architects. It provides a mixture of B1, B2 and B8 uses across the site. The Estate will offer opportunities for a range of businesses seeking new premises within a highly sustainable location, which the A127 corridor offers through the proposed allocations. The indicative proposed masterplan sets out how the proposed allocation would allow for the redevelopment of the Estate and how this could come forward through a series of phased developments. This will be able to offer a number of units of varying sizes that would be suitable to a range of businesses, responding to the economic climate. The work undertaken by CMP Architects demonstrates how the Estate can be more efficiently and effectively developed, by providing a modern range of units for B1, B2 and B8 uses and associated infrastructure. Figure 3.1: Key Diagram: Figure 3.1 provides a visual aid in support of the Spatial Strategy. It identifies Junction 29 of the M25 as a key location for 'Employment-led development' (Brentwood Enterprise Park) and Childerditch Industrial Estate as a location for new 'Employment land', in addition to the strategic housing-led development at Dunton Hills and the redevelopment of West Horndon. A focus on employment growth along the A127 corridor will reduce the need for additional employment sites in less sustainable locations elsewhere in the Borough. This approach is fully supported and recognizes the importance of this location for new employment opportunities. This approach is justified and demonstrates that the Plan is consistent with national policy in this respect. Section 5: Resilient Built Environment: Policy BE11: Strategic Transport Infrastructure: We support part C of Policy BE11, which states that the Council will continue to work with the Highway Authority, statutory bodies and key stakeholders to deliver improvements to the ensure highway infrastructure capacity is maintained. Any future planning applications to be submitted in respect of new development at Childerditch Industrial Estate will be accompanied by the relevant transport studies. Paragraph 5.105: Paragraph 5.105 states that, within the South Brentwood Growth Corridor, there is a recognition that provision of sustainable transport in this area is poor. Since the Draft Local Plan Regulation 18 Consultation, the Council has published an Infrastructure Delivery Plan (IDP) for the Borough. This includes, at Figure 3.14 of Chapter 3, a sustainable transport plan for the Southern Growth Corridor, which includes indicative locations for new cycle ways and a new bus route to connect Childerditch Industrial Estate, Brentwood Enterprise Park, Dunton Hills Garden Village and West Horndon Industrial Estate (to be redeveloped). We support the principle of improving walking and cycling links within the land owned by our client, which extends to Little Warley Hall Lane. However, we would question the extent to which these new cycle ways could be delivered along the A127 corridor, as this would require every land owner to be committed to this initiative and an identification of funding. It is also not clear within the IDP who would be responsible for delivering this infrastructure improvement i.e. would this be the responsibility of Essex County Council, Brentwood Borough Council or landowners. This point needs to be clarified. In respect of the new bus route loop that is shown within the IDP at Childerditch Industrial Estate, whilst our client broadly supports the principle of a bus service at the Estate, they consider that the circulatory route shown within the IDP is too prescriptive and misleading, and at this stage, a broad arrow would be sufficient within the IDP. Details of how the Estate could be served can be dealt with as part of the iterative masterplan process. If a bus service from the A127 were to drop off/pick up were to be brought forward, our client could support this if the bus were to stop outside the Estate, turn and move back down Childerditch Hall Drive. Section 7: Prosperous Communities: This section of the PSLP confirms Brentwood Borough Council's Economic Strategy, which includes a number of Economic Aims and Strategic Priorities. These will help facilitate sustainable development, which is required to ensure that the Plan is sound. Paragraph 7.1 of the Plan recognises the importance of the Borough as being a high-quality environment within close proximity to London. The economic aims include the desire to encourage high value, diverse, employment uses that will provide a significant number of skilled and high-quality jobs; and to encourage the better utilisation, upgrading and redevelopment of existing land and buildings. These aims are supported and are reflected in the indicative proposed masterplan accompanying these representations. Childerditch Industrial Estate has a unique employment offer, insofar as it comprises a range of B1, B2 and B8 employment uses and storage yards. The proposed allocation provides the opportunity to build on the success of the Estate, by creating additional employment opportunities with a range of businesses. The proposed allocations will also enable the upgrading of the existing units on site through increased investment. The accompanying indicative proposed masterplan prepared by CMP Architects sets out how the redevelopment of the Estate could come forward through a series of phased developments. The development of The Range North (previously identified as site 112D in the Regulation 18 Consultation) as a first phase will assist with the provision of funding to begin the process of upgrading the existing units and infrastructure at the Estate, and provide for the ability for reinvestment to develop the proposed southern extension (previously identified as site 112E in the Regulation 18 Consultation). This redevelopment would ensure compliance with the Economic Aims of the PSLP. In addition to the Economic Aims, the PSLP sets out a number of Strategic Priorities. Of these, Strategic Policies P1 and P6 are strongly supported. P1 seeks to support business development and growth. P6 seeks to promote Brentwood Borough as a place to visit and invest, thereby encouraging the visitor economy. Childerditch Industrial Estate would assist in meeting those objectives. Policy PC02: Job Growth and Employment Land In determining the employment land allocations necessary to ensure that an adequate number of jobs can be provided, it is important that the Plan is sufficiently flexible to adapt to rapid change (as required by Paragraph 11 of the NPPF), and that it does so in a manner that ensures that the boundary of the Green Belt will not need to be reviewed before the end of the Plan period (Paragraph 136 of the NPPF refers). As set out within Paragraph 2.54 of the PSLP, 89% of the Borough lies within the Metropolitan Green Belt. There is not sufficient land outside of the Green Belt for the Council to deliver the requisite level of housing and employment land. It is therefore necessary and justified to amend the boundary of the Green Belt as part of the Local Plan process. Paragraph 8.84 of the PSLP refers to the need to release land from the Green Belt in order to achieve the Council's growth strategy. This release has been carefully balanced to ensure that sustainable development can be achieved, whilst ensuring that the longer-term purpose, integrity and benefit of the Green Belt remains intact. We support the Council's approach insofar as our client's land interests are concerned and it is important to ensure that any changes to the Green Belt endure beyond the Plan period, having regard to its intended permanence, as required by Paragraph 136 of the NPPF. The PSLP is informed by an evidence base, including an assessment of the Functional Economic Market Area (FEMA) and the Brentwood Economic Futures 2013-2033 Report. The PSLP suggests a range of growth within the Borough, where at Paragraph 7.19(iv), it is stated that a range from 33.76 hectares to 45.96 hectares will be required. This includes land lost at existing allocations (i.e. at West Horndon). Childerditch Industrial Estate will therefore make a significant and important contribution towards the required land. It is well suited for businesses that may need to relocate as a result of sites that will come out of employment use to provide for housing. It is therefore considered the approach to Policy PC02 is justified in providing for 47.39 hectares of new employment land in excess of the higher forecasts; offering support for existing employment sites and the appropriate redevelopment of sites, to be able to adapt to rapid change and to remove the need for the Green Belt to be reviewed during the Plan period. The PSLP sets out the proposed allocation at Childerditch Industrial Estate can come forward over the next 1 to 10 years. The indicative proposed masterplan prepared by CMP Architects provides an illustrative approach as to how the proposed allocation could come forward in conjunction with the redevelopment of the existing Park. The land is available now and there are no overriding constraints to delivery. The Plan would be justified and effective in this respect. The Brentwood Economic Futures (2013-2033) Final Report sets out 4 scenarios for quantifying the potential requirement for jobs in order to support the growth of the Plan Period. The Report provides indicative job capacity figures, which have been based on assumptions, in terms of both site capacity and B1a/b, B1c/B2, and B8 split. (Refer to table in attached copy of full representation). In respect of Childerditch Industrial Estate however, the Report has not taken into account that the existing Park can be redeveloped in a more efficient and effective manner to provide more job growth, as provided for in these representations. Overall, the proposed allocation will enable the upgrading of the existing units on the site through increased investment. Policy PC03: Employment Land Allocations: Policy PC03 sets out a number of considerations that are intended to relate to existing and proposed employment sites identified in Figure 7.6 of the PSLP. This includes Childerditch Industrial Estate. However, the PSLP also includes a specific policy that relates to Childerditch Industrial Estate (Policy E12, which will be addressed later in these representations). Paragraph 7.23 of the PSLP states that due to the difficulties of accommodating the quantum of employment land within other parts of the Borough, the opportunity has been taken to capitalise on the strategic connections of the South Brentwood Growth Corridor by extending employment land around Childerditch Industrial Estate. This approach is considered to be justified and consistent with national policy, as the proposed allocation seeks to make efficient use of an existing, highly sustainable employment site. Proposed Modification: It is considered that greater clarification should be added to Paragraph 7.23, Part b. ii. on where Policy PC03 applies, as Policy E12 covers the entirety of Childerditch Industrial Estate. It should be added that the proposed allocation at Childerditch Industrial Estate allows for the redevelopment of the existing Estate and new development on the extended areas, which will provide a location for employment generating sui generis uses, as provided for by Policy E12. Policy PC05: Employment Development Criteria: Policy PC05 does not specify whether it applies to existing and/or new employment land. The policy simply refers to development for employment uses. The wording of Policy PC05 is therefore ambiguous and is more restrictive than the site specific policy for Childerditch Industrial Estate (Policy E12). For example, Policy E12 requires provision to be made for improved walking and cycling links within the surrounding area. Policy PC05 on the other hand states that employment uses will be encouraged provided that the proposal is accessible by public transport. At present, there are no public transport connections directly available to Childerditch Industrial Estate, and whilst this may change in the future, there is no guarantee of if and when this will happen. On this basis, we object to Policy PC05 in its current form as it would not allow for an effective Plan. Proposed Modification to Policy PC05: It is suggested that Policy PC05, Part A. a. be amended to state that proposals provide opportunities to be accessible by public transport, walking and cycling. At Childerditch Industrial Estate, opportunities are limited to provide public transport; however, in bringing forward proposals for the site, this issue can be reviewed with Brentwood Borough Council and Essex County Council. Section 8: Natural Environment Policy NE9: Green Belt: Policy NE9 is supported. The Council has recognised the need to release some land from the Green Belt in order to meet its housing and employment needs. However, the land that will remain within the Green Belt should be protected throughout the Plan period and Policy NE9 achieves this, in accordance with the NPPF. Policy NE13: Site Allocations in the Green Belt: It is considered that Policy NE13 should be removed from the PSLP. The criteria of the policy can be included other policies, such as the site specific policy for Childerditch Industrial Estate (Policy E12), and it is therefore not considered necessary to have a standalone policy duplicating these points. Furthermore, it is queried why the policy refers to the benefits of housing sites only and no other land uses. Section 9: Site Allocations Policy E12: Childerditch Industrial Estate: Policy E12 is supported. We consider that it is justified, effective, consistent with national policy and necessary for the reasons set out elsewhere in these representations. Policy E12 proposes to allocate land that has previously been promoted at the Range North (site 112D) and the land to the south (site 112E), in addition to the existing Childerditch Industrial Estate, to provide a total developable area of 20.64 hectares across the entire Estate. The release of these sites from the Green Belt is justified and will ensure that the Plan has been positively prepared. At present, Childerditch Industrial Estate offers some 35 units. As part of the work supporting these representations, CMP Architects have undertaken an analysis of the Estate to identify how the existing Park could be regenerated for existing occupiers, redeveloped in areas to maximise efficiency, and expanded for future employment growth demand. The proposed masterplan at Appendix 1 provided for indicative purposes to support these representations, demonstrates the deliverability of the site over a period of time. The proposed allocations will extend the size of the Estate and as a whole, it is considered that it has the potential to accommodate around 50 units following redevelopment. The development of The Range North (site 112D) as a first phase will assist with the provision of funding to begin the process of upgrading the existing units and infrastructure at the Estate, which will ultimately lead to the development of the southern extension. This infrastructure will include an improved primary route through the core of the site and a number of secondary routes stemming from this to provide access to the different areas of the site. In addition to the work undertaken by CMP Architects, an Access Appraisal is submitted with these representations. The Appraisal at Appendix 2 confirms that the proposed allocation is deliverable in the context of the existing and proposed highway infrastructure, and will not have a significant impact on the efficiency or safety of the local transport network. The Appraisal also confirms that cumulatively, the allocation can be accommodated with other employment allocations along the A127 corridor, including those at Brentwood Enterprise Park and Codham Hall Farm. The PSLP, at Appendix 2, confirms a delivery forecast of 1 to 10 years. Following the adoption of the Local Plan and confirmation that the proposed allocations at Childerditch Industrial Estate are removed from the Green Belt, a planning application supported by a package of technical information will be submitted to Brentwood Borough Council for the first phase of development at The Range North. Further applications will then follow for the subsequent phases. It is very much expected that development will commence on site within the first few years of the Plan period, given the known demand as referred to at Paragraph 1.4 of these representations. We are in agreement that the entirety of the proposed allocations will be delivered within the 10 year period, which will ensure that the Plan is effective. Our clients purchased the site in 1983 and have a long term investment in the site and a desire to deliver the proposed allocations and enhancements to the existing site, as shown in the indicative proposed masterplan. In respect of Part B, criterion b) of Policy E12, we support the principle of improving walking and cycling links within the land owned by our client, which extends to Little Warley Hall Lane. However, we object to Part B, criterion c) of Policy E12, as it is not considered to be necessary. The Access Appraisal copied at Appendix 2 does not identify a need to improve the junction where the A127 meets Childerditch Hall Drive. The Access Appraisal confirms that the additional traffic created by the proposed allocation will not have an impact on the A127 junction because due to the length of the access from the A127, vehicles will not be delayed on entry. On exit from Childerditch Hall Drive onto the A127, any queuing will be held on site and therefore the increase in vehicles will not have an impact on the A127. Proposed Amendment to Policy E12: In light of the comments set out in the above paragraph, Part B, criterion b) should be removed from Policy E12. Sustainability Appraisal: A Sustainability Appraisal (SA), published in January 2019, has been produced by AECOM on behalf of Brentwood Borough Council in support of the PSLP. The SA forms only one part of the evidence base underlining the PSLP. The evidence base also includes documents such as the Brentwood Economic Futures 2013-2033 Report, Green Belt Study and Transport Assessment. In allocating additional land at Childerditch Industrial Estate, Brentwood Borough Council has taken a balanced judgement on the site constraints and the need to provide to create additional employment opportunities within the Borough. The SA is currently focused on a spatial approach to the assessment of each criterion, using the distance between the site and various factors to judge the extent to which it either achieves certain objectives or not. However, it is considered that the SA fails to fully consider the nature of each proposal or the likelihood in practice of effects in sustainability terms, where a 'broad brush' approach has instead been taken to sites regardless of their intended use. For example, in respect of distance to a GP Practice, the proposed employment allocations at Childerditch Industrial Estate have been scored in the same manner as a residential allocation. However, it is considered to be less important for an employment site to be located within close proximity to a GP practice than a residential site, given the nature of the uses. Therefore, Childerditch Industrial Estate should be considered against a different set of criteria more relevant to the proposed employment allocation. Provided below is an extract from the SA showing the scoring for the proposed allocations at Childerditch Industrial Estate. The proposed allocation includes Sites 112A, 112D and 112E. Site 112A relates to the existing allocation at the Estate. Site 112D relates to the proposed allocation at The Range North, and site 112E relates to the proposed southern extension allocation. (Refer to table in attached representation). On review of the appraisal of Childerditch Industrial Estate, the site has not scored particularly well in relation to the criteria that has data available. However, it is considered that the SA, or at least the sustainability criteria, could be too sensitive when it comes to assessing sites against the criteria. The fact that no site performed 'particularly well' against any of the criteria suggests that the scope of the assessment makes many sites appear unsustainable, with limited opportunity to score 'green' in many of the objectives. The NPPF, at paragraph 81, states that the Government is committed to ensuring that the planning system does everything it can to support sustainable economic growth. Paragraph 16 of the NPPF states that Local Plans must be prepared with the objective of contributing to the achievement of sustainable development. Paragraph 17 further adds that Local Plans should include strategic policies to deliver the homes and jobs needed in the area. Childerditch Industrial Estate is within a highly sustainable location, with excellent transport links in the form of the A127 and M25, which is a significant benefit to the occupiers of the site. The Estate is a successful employment site and the PSLP process provides a pragmatic response to the opportunity to build upon this success with further land being allocated. Indeed, as outlined above, the Council's own Spatial Strategy includes an emphasis on 'Transit-orientated Growth', which provides for new development along two key transit corridors in the Borough, including the Southern Brentwood Growth Corridor. It is noted that sites 112A, 112D and 112E are presently scored 'amber' (performs poorly) under the Green Belt criterion. We do not consider that this aspect has been considered in sufficient detail by the SA given the particular circumstances of the site and existing uses. Childerditch Industrial Estate is visually contained by the surrounding agricultural land. We note that within the Green Belt Study Part II: Green Belt Parcel Definition and Review Document updated in November 2018, Green Belt Parcel 20, which the Childerditch Industrial Estate is excluded from, has been scored as making a moderate contribution to Green Belt purposes. As the existing site (112A) is excluded from the Green Belt, it is considered that this site should instead be considered to have 'no issue' in the SA assessment. There would be no loss of Green Belt land that would otherwise meet established purposes. The Green Belt Study recognises that the primary land use within the Parcel is arable farmland, but that the secondary land use is an industrial estate (Childerditch) set within the Parcel. The Estate is an 'island site' excluded from this Green Belt Parcel. The Study considers that views across the Parcel are limited, where field boundaries with dense hedgerows reduce visibility. Whilst the Study considers that undulating fields facilitate some views from the north, it is considered that views of Childerditch Industrial Estate will be limited from the north. The northern portion of the site is constrained by its topography, with some significant level changes and mature landscaping screening the existing buildings within the Estate. The northern most section of the Estate is only used as open storage and is also screened by existing woodland. These areas of the Estate form part of the existing allocation in any instance. The work undertaken by CMP Architects has given consideration to wider views of the Estate. The proposed allocations at sites 112D and 112E are currently located within the Green Belt. However, as part of the Council's review of the Local Plan, the opportunity exists to review Green Belt boundaries, in accordance with paragraphs 138 and 139 of the NPPF. At paragraph 138 of the NPPF for example, it states that, when drawing up or reviewing Green Belt boundaries, local planning authorities should take account of the need to promote sustainable patterns of development. As part of the new Local Plan, the fringes of the existing Childerditch Industrial Estate can be released to provide a necessary and important contribution to employment land within the Borough within a highly sustainable location. Furthermore, it is considered that the areas proposed for allocation, adjacent to an existing employment site, are sequentially more appropriate than other sites in the Borough that currently have no employment use. This supports the Council's growth strategy, which requires land to be released from the Green Belt, and is therefore justified. The release of land has therefore been carefully considered taking all factors into account, to ensure that sustainable development can be achieved, whilst ensuring that the longer-term purpose, integrity and benefit of the Green Belt remains intact. The Childerditch Industrial Estate sites have additionally been scored 'amber' with regard to effect on agricultural land, with the methodology stating that any site in land classified as Grade 3 will be 'amber' and Grade 2 will be 'red'. While the assessment notes that the dataset used is of poor resolution, the assessment has failed to adequately consider the existing nature of the sites (with particular regard to site 112D), as well as differentiate between Grades 3a and 3b. We would consider that the criteria should be amended to be more in line with the aims of Government policy, and that the sites be assessed on the basis of whether their use for employment purposes would lead to the loss of the best of the best and most versatile land. Furthermore, if the locally defined employment requirement is to be met, building on agricultural land is necessary. The fact that no site performed 'particularly well' (scoring 'dark green') in any of the criteria, also suggests that the scope of the assessment was not sensitive to acknowledge the competing objectives of national and local policy, particularly that in the Green Belt, to meet needs for employment and other development. Ultimately, it is important to note that the SA, at paragraph 9.6.6 states that "... there is a strategic opportunity to develop the A127 corridor as an employment growth corridor, capitalising on connections to key economic centres in the region (including Tilbury Port, Southend Airport and those in Greater London). All sites will have good or excellent access onto the strategic highway network". Furthermore, at paragraph 9.6.7, it is stated that "... With regards to site specific policy, the policies for the four employment should support timely and effective delivery". We support this view and will continue to take a proactive approach regarding promotion of and extension to Childerditch Industrial Estate through to the adoption of the new Local Plan, including attending the relevant Hearing Sessions at the Examination in Public. Summary: The PSLP confirms that the Spatial Strategy substantially focuses on 'Transit-orientated growth', including the Southern Brentwood Growth Corridor, with strategic allocations along the A127 corridor for employment, which is supported. The proposed allocation at Childerditch Industrial Estate is a recognition of the role that the Estate has in providing employment for the Borough. The proposed allocation would assist in meeting Brentwood Borough Council's identified need, to provide employment land required to assist meeting the Strategic Objectives of the PSLP Plan for the Plan period. The Estate is ideally located along the A127 to provide excellent transport links for the businesses operating at the Estate, and this is reflected in the full occupation rate of the existing units. There is a strong market for additional units in this location. The proposed allocations at The Range North and the southern extension will provide additional land to build on the success of the existing Estate. This submission demonstrates how the Estate can be more efficiently and effectively developed, by providing a modern range of units for B1, B2 and B8 uses and associated infrastructure. In conclusion, we strongly support the proposed allocation at Childerditch Industrial Estate, as set out in the PSLP, and will continue to promote the Estate as the Plan progresses to Examination in Public, in consultation with Brentwood Borough Council and key stakeholders. We consider that the Plan is generally sound; however, we do object to two policies in their current form. These are Policies PC05 and E12, as set out at paragraphs 2.23 - 2.25 and 2.34 - 2.35 of these representations. However, within these representations, we have also set out suggested amendments to these policies that we consider would make the plan sound.