Housing Need

Showing comments and forms 1 to 2 of 2

Object

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

Representation ID: 23670

Received: 26/04/2019

Respondent: Gladman Developments

Agent: Gladman Developments

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

The Plan sets out that one of the overarching driving factors behind the BLP is meeting the housing needs of the borough. However, the Council are using the 2016 Household Projections to calculate the housing needs of the borough, use of the 2014 Household Projections is likely to yield a higher housing requirement and therefore, the Council will need to address this issue before the Plan gets to Examination.

Change suggested by respondent:

Use 2014 Household projections to calculate housing need.

Full text:

Brentwood Local Plan
Pre-Submission Document

CONTENTS
1 Introduction 2
1.1 Introduction 2
1.2 Context 2
2 National Planning Policy 3
2.1 National Planning Policy Framework 3
2.2 Planning Practice Guidance 4
3 Legal Requirements 7
3.1 Duty to Cooperate 7
3.2 Sustainability Appraisal 8
4 Spatial Strategy 9
4.1 Vision and Strategic Objectives 9
5 Managing Growth 10
5.1 Policy SP02: Managing Growth 10
5.2 Policy SP04: Developer Contributions 11
6 Resilient Built Environment 12
6.1 Policy BE02: Sustainable Construction and Resource Efficiency 12
7 Housing Provision 13
7.1 Policy HP01: Housing Mix 13
7.2 Policy HP06: Standards for New Housing 13
8 Conclusion 15
8.1 Overall Conclusion 15

1 INTRODUCTION
1.1 Introduction
1.1.1 These representations are submitted by Gladman in response to the current consultation on the Brentwood Local Plan Pre-Submission Document. Gladman specialise in the promotion of strategic land for residential development with associated community infrastructure.
1.1.2 Gladman has considerable experience in the development industry across a number of sectors, including residential and employment development. From that experience, we understand the need for the planning system to provide local communities with the homes and jobs that are needed to ensure that residents have access to a decent home and employment opportunities.
1.1.3 Gladman also has a wealth of experience in contributing to the Development Plan preparation process, having made representations on numerous local planning documents throughout the UK and having participated in many Local Plan public examinations. It is on the basis of that experience that the comments are made in this representation.
1.1.4 Through this submission, Gladman have sought to highlight a number of issues with the Brentwood Local Plan. Gladman submit that the Council will need to carefully consider some of its policy choices and ensure that its evidence base is up-to-date and robust in light of changing circumstances and the changes brought about by the Revised National Planning Policy Framework (2019).
1.2 Context
1.2.1 The Revised Framework (2019) sets out four tests that must be met for Local Plans to be considered sound. In this regard, we submit that in order for it to be sound it is fundamental that the Thurrock Local Plan is:
* Positively prepared - providing a strategy which, as a minimum, seeks to meet the area's objectively assessed needs; and is informed by agreements with other authorities, so that unmet need from neighbouring areas is accommodated where it is practical to do so and is consistent with achieving sustainable development;
* Justified - an appropriate strategy, taking into account the reasonable alternatives, and based on proportionate evidence;
* Effective - deliverable over the plan period, and based on effective joint working on cross-boundary strategic matters that have been dealt with rather than deferred, as evidenced by the statement of common ground; and
* Consistent with national policy - enabling the delivery of sustainable development in accordance with the policies in the Framework.

2 NATIONAL PLANNING POLICY
2.1 National Planning Policy Framework
2.1.1 On 24th July 2018, the Ministry of Housing, Communities and Local Government (MHCLG) published the Revised National Planning Policy Framework which was subsequently updated in February 2019. These publications form the first revisions of the Framework since 2012 and implement changes that have been informed through the Housing White Paper, The Planning for the Right Homes in the Right Places consultation and the draft Revised Framework consultation.
2.1.2 The Revised Framework (2019) introduces a number of major changes to national policy and provides further clarification to national planning policy as well as new measures on a range of matters. Crucially, the changes to national policy reaffirms the Government's commitment to ensuring up-to-date plans are in place which provide a positive vision for the areas which they are responsible for to address the housing, economic, social and environmental priorities to help shape future local communities for future generations. In particular, paragraph 16 of the Revised Framework (2019) states that Plans should:
a) Be prepared with the objective of contributing to the achievement of sustainable development;
b) Be prepared positively, in a way that is aspirational but deliverable;
c) Be shaped by early, proportionate and effective engagement between plan-makers and communities, local organisations, businesses, infrastructure providers and operators and statutory consultees;
d) Contain policies that are clearly written and unambiguous, so it is evident how a decision maker should react to development proposals;
e) Be accessible through the use of digital tools to assist public involvement and policy presentation; and
f) Serve a clear purpose, avoiding unnecessary duplication of policies that apply to a particular area (including policies in this Framework, where relevant).
2.1.3 To support the Government's continued objective of significantly boosting the supply of homes, it is important that the Local Plan provides a sufficient amount and variety of land that can come forward where it is needed, that the needs of groups with specific housing requirements are addressed and that land with permission is developed without unnecessary delay .
2.1.4 In determining the minimum number of homes needed, strategic plans should be based upon a local housing need assessment, conducted using the standard method as set out in the PPG unless exceptional circumstances justify an alternative approach. It is imperative that the emerging Local Plan is formulated on the basis of meeting this requirement as a minimum.
2.1.5 Once the minimum number of homes that is required is identified, the planning authority should have a clear understanding of the land available in their area through the preparation of a strategic housing land availability assessment. In this regard, paragraph 67 sets out specific guidance that local planning authorities should take into account when identifying and meeting their housing need. It states:
"Strategic policy-making authorities should have a clear understanding of the land available in their areas through the preparation of a strategic housing land availability assessment. From this planning policies should identify a sufficient supply and mix of sites, taking into account their availability, suitability and likely economic viability. Strategic plans should identify a supply of:
a) specific, deliverable sites for years one to five of the plan , and
b) specific, developable sites or broad locations for growth, for years 6-10 and, where possible, for years 11-15 of the plan.
2.1.6 Once a local planning authority has identified its housing needs, these needs should be met in full, unless any adverse impacts would significantly and demonstrably outweigh the benefits of doing so . Local planning authorities should seek to achieve each of the economic, social and environmental dimensions of sustainable development, resulting in net gains across all three. Adverse impacts on any of these dimensions should be avoided, where significant adverse impacts are unavoidable, suitable mitigation measures should be proposed or, where this is not possible, compensatory measures should be considered.
2.1.7 To be considered sound at Examination the emerging Local Plan will need to meet all four of the soundness tests set out in paragraph 35 of the Revised Framework (2019).
2.2 Planning Practice Guidance
2.2.1 The Government published updates to its Planning Practice Guidance (PPG) on 13th September 2018. The updated PPG provides further clarity on how specific elements of the Revised Framework should be interpreted when preparing Local Plans. In particular, the updated Housing Needs Assessment chapter of the PPG confirms that the Revised Framework expects local planning authorities to follow the standard method for assessing local housing needs, and that the standard method identifies the minimum housing need figure and not a final housing requirement .
2.2.2 The calculation of objectively assessed needs (OAN) for housing has been a subject of much debate as part of Local Plan Examinations and s.78 appeals since its initial introduction through the Framework in 2012 with interested parties grappling with the issue of OAN with varying outcomes depending on local circumstances. To simplify the assessment the Government, through the Revised Framework has introduced the standardised method which should be undertaken through the 3-stage process outlined at paragraph 005 of the PPG .
2.2.3 Notwithstanding the above, it is important to note that whilst the standard methodology to assessing housing needs has been introduced, it is likely that this will be subject to further change. In this regard, it is currently anticipated that the standard method will be adjusted to ensure that the starting point in the plan-making process is consistent with the Government's proposals in Planning for the Right Homes in the Right Places consultation, to ensure that 300,000 homes are built per annum by the mid-2020s. This follows the release of the 2016 based household projections in September 2018, which forecast a lower level of household growth than previously envisaged.
2.2.4 It is therefore important that future iterations of the Local Plan take account of any changes to the standard method for calculating housing needs during the course of their preparation.
2.2.5 Whilst the PPG advises that the standard method is not mandatory, there is a possibility that other methods can be used in exceptional circumstances based on robust evidence in order to deviate from the standard method. Indeed, the PPG is clear that the standard method only identifies the minimum number of homes required to meet population needs and does not take into account the variety of factors which may influence the housing required in local areas such as changing economic circumstances or other factors which may change demographic behaviour. Where additional growth above historic trends are likely to occur, then local planning authorities should include an appropriate uplift to the housing numbers to meet the need in full. It is important that this uplift is undertaken prior to and separate from the consideration of the demographic baseline assessment of need and how much of this need can be accommodated in a housing requirement figure. Circumstances where the need to apply an uplift may be appropriate include, but are not limited to:
- Where growth strategies are in place, particularly where those growth strategies identify that additional housing above historic trends is needed to support growth or funding is in place to promote and facilitate growth (e.g. housing deals);
- Where strategic infrastructure improvements are planned that would support new homes;
- Where an authority has agreed to take on unmet need, calculated using the standard method from neighbouring authorities, as set out in a statement of common ground;
- Historic delivery levels where previous delivery has exceeded the minimum need identified it should be considered whether the level of delivery is indicative of greater housing need; and
- Where recent assessments such as Strategic Housing Market Assessments suggest higher levels of need than those proposed by a strategic policy making authority, an assessment of lower need should be justified.
2.2.6 In addition, it is important for local planning authorities to consider the implications of the standard method on delivering affordable housing need in full. The PPG is clear that the total affordable housing need should be considered in the context of its likely delivery as a proportion of mixed market and affordable housing developments, taking into account the probable percentage of affordable housing to be delivered by open market housing development. If it becomes clear that affordable housing need will not be delivered in full, then an increase to the total housing figures included in the plan should be considered where it could help to deliver the required number of the affordable homes.
2.2.7 In the event that an alternative approach is used it should only be considered sound if it exceeds the minimum starting point. The PPG is clear that any alternative approach with results in lower housing need figure than the standard method should be considered unsound as it does not meet the minimum housing need required.  
3 LEGAL REQUIREMENTS
3.1 Duty to Cooperate
3.1.1 The Duty to Cooperate (DtC) is a legal requirement established through section 33(A) of the Planning and Compulsory Purchase Act 2004, as amended by Section 110 of the Localism Act. The DtC requires local planning authorities to engage constructively, actively and on an ongoing basis with neighbouring authorities on cross-boundary strategic issues through the process of ongoing engagement and collaboration.
3.1.2 The Revised Framework (2019) has introduced a number of significant changes for how local planning authorities are expected to cooperate including the preparation of Statement(s) of Common Ground (SOCG) which are required to demonstrate that a plan is based on effective cooperation and has been based on agreements made by neighbouring authorities where cross boundary strategic issues are likely to exist. The Revised Framework (2019) sets out that local planning authorities should produce, maintain, and update one or more Statement(s) of Common Ground (SOCG), throughout the plan making process . The SOCG(s) should provide a written record of the progress made by the strategic planning authorities during the process of planning for strategic cross-boundary matters and will need to demonstrate the measures local authorities have taken to ensure cross boundary matters have been considered and what actions are required to ensure issues are proactively dealt with e.g. unmet housing needs.
3.1.3 As demonstrated through the outcome of the Coventry, Mid Sussex, Castle Point and St Albans examinations, if a Council fails to satisfactorily discharge its DtC a Planning Inspector must recommend non-adoption of the Plan. This cannot be rectified through modifications.
3.1.4 Gladman welcome the South Essex Authorities' commitment to the preparation of a Joint Strategic Plan (JSP) covering Basildon, Brentwood, Castle Point, Rochford, Southend-on-Sea and Thurrock. All of these authorities have significant strategic issues to contend with not least, the delivery of substantial housing and economic growth and the need to review Green Belt boundaries at a strategic scale.
3.1.5 It is however disappointing, that the JSP will not allocate specific sites which will be left for the individual Local Plans to take forward. The level of housing need in South Essex is significant and delivery has fallen substantially behind need for a long period of time. There is therefore an immediate need to address this situation; and for Local Plans to have to await the adoption of the JSP before sites are taken through the Local Plan process and finally released from the Green Belt, is simply going to result in inevitable further delay.
3.1.6 The JSP could release the strategic sites for development in partnership with the constituent authorities leaving a certain proportion of housing need to be addressed by the Local Plans on non-strategic sites. This would allow the release of Green Belt for development as early in the process as possible, thus meeting urgent need in an expedient manner.
3.1.7 The JSP also needs to follow a statutory plan preparation process with requisite consultation and examination to ensure that it has full weight in the planning process and to guide the preparation of the Local Plans on a formal basis. If the JSP is simply a non-statutory document, then there is the potential for changes over time in the other authorities to cause significant issues.
3.1.8 Beyond this commitment, there is very little evidence available setting out how Brentwood has discharged its Duty to Cooperate and what outcomes have been achieved through this process. This is especially pertinent because of the need to address unmet housing needs across the HMA.
3.2 Sustainability Appraisal
3.2.1 In accordance with Section 19 of the Planning and Compulsory Purchase Act 2004, policies set out in Local Plans must be subject to a Sustainability Appraisal (SA), and also incorporate the requirements of the Environmental Assessment of Plans and Programmes Regulations 2004 (the SEA regulations).
3.2.2 The SA/SEA is a systematic process that should be undertaken at each stage of the Plan's preparation, assessing the effects of the emerging Local Plan Review proposals on sustainable development when judged against all reasonable alternatives. The Council should ensure that the future results of the SA clearly justify its policy choices. In meeting the development needs of the area, it should be clear from the results of this assessment why some policy options have progressed, and others have been rejected. This must be undertaken through a comparative and equal assessment of each reasonable alternative, in the same level of detail for both chosen and rejected alternatives. The Council's decision-making and scoring should be robust, justified and transparent.

4 SPATIAL STRATEGY
4.1 Vision and Strategic Objectives
4.1.1 Gladman has concerns with certain elements of the Spatial Strategy that is being pursued through the Brentwood Local Plan (BLP).
4.1.2 The Plan sets out that one of the overarching driving factors behind the BLP is meeting the housing needs of the borough. However, the Council are using the 2016 Household Projections to calculate the housing needs of the borough which the Government have now confirmed is the incorrect data set to rely upon. Use of the 2014 Household Projections is likely to yield a higher housing requirement and therefore, the Council will need to address this issue before the Plan gets to Examination.
4.1.3 They also set out within the Settlement Hierarchy in Table 2.3 that the development of brownfield land will be prioritised. This requirement has no support in National Policy as Para 117 of the Revised Framework (2019) simply states that substantial weight should be given to the value of using suitable brownfield land. This requirement should therefore be changed to reflect Government guidance.
4.1.4 The prioritisation of brownfield land is also repeated in the Spatial Development Principles section under Paragraph 3.23 which similarly needs amending.
4.1.5 It is also disappointing that in the Vision and the Strategic Objectives, no mention is made of providing housing to meet the needs of the local population or of addressing one of the key challenges facing Brentwood, that of tackling housing affordability. It is therefore suggested that given the emphasis being placed by the Government on fixing the broken housing market, a further Strategic Objective is added to the Plan that specifically relates to the delivery of housing.

5 MANAGING GROWTH
5.1 Policy SP02: Managing Growth
5.1.1 The Council sets out in the pre-amble to Policy SP02 that they consider the housing need figure using the Standard Methodology is 350 dwellings per annum using the 2016 Household Projections published by ONS.
5.1.2 However, since the Local Plan was published, the Government has clearly set out that the 2016 Household Projections should not be used for the purposes of establishing the housing need figure under the standard methodology and that the 2014 Household Projections should be used instead.
5.1.3 The Council therefore needs to recalculate the housing need figure using the correct set of data so that it accords with the Framework and is not immediately found unsound on this basis.
5.1.4 It must also be recognised that the standard method only identifies the minimum number of homes required to meet population needs and does not take into account the variety of factors which may influence the housing required in a local area such as changing economic circumstances or other factors which may change demographic behaviour. Where additional growth above historic trends is likely to occur, then local planning authorities should include an appropriate uplift to the housing numbers to meet the need in full. It is important that this uplift is undertaken prior to and separate from, the consideration of how much of this need can be accommodated in the housing requirement.
5.1.5 The Council are seeking to provide an uplift to the base level of housing needs established through the Standard Method but this is intended to provide a buffer in the housing supply to ensure that the housing requirement is met or surpassed. It is not an uplift to take account of the circumstances listed in the PPG (see paragraph 3.1.5 above).
5.1.6 Gladman support the Council's inclusion of a 20% buffer in order to provide flexibility in supply as this will allow the Local Plan to adapt to changes in circumstances such as stalled sites, delay in delivery and sites which do not come forward as envisaged. This is especially important where Local Plans are predicated on the delivery of a small number of large-scale strategic sites.
5.1.7 However, we also consider that the housing requirement included within the Local Plan is not representative of the full housing needs of the area and that factors such as the high housing affordability ratio (11.23 in 2017), continuing economic growth and proximity to London should lead the Council to uplift the housing requirement figure above the minimum identified through the Standard Method. The Council would then still need to include a 20% buffer above this figure, in order to provide the flexibility needed to ensure the housing requirement is met or surpassed.
5.1.8 Gladman also has concerns regarding the Sequential Land Use approach which is set out in Paragraph 4.22 of the Local Plan. This is intended to be used as a Development Management tool to appraise proposals against a sequential land use hierarchy. However, we consider that this goes beyond the guidance set out in National Policy which seeks to maximise the use of brownfield land where possible and where it does not conflict with other policies in the Framework. It is also difficult to see how this approach would work in a Development Management context as applicants would have to demonstrate that there are no other suitable alternative sites which could accommodate the proposed development.
5.1.9 Policy SP02 also sets out a stepped approach to housing delivery within Brentwood which would equate to 310 dwellings per annum 2016-2023 and 584 dwellings per annum from 2023 onwards. Given that Brentwood has struggled to deliver homes over recent years and has in fact, failed to meet the requirements of the recently published Housing Delivery Test, resulting in the need for a 20% buffer to be applied, coupled with the fact that housing affordability in the borough is severe, must lead the Council to the conclusion that it has to address the backlog of housing needs as quickly as possible.
5.1.10 Implementing a stepped approach to the housing requirement will only lead to people having to wait longer for their housing needs to be met which, in the face of the Government's push to address the housing crisis, must be unacceptable.
5.1.11 The Council point to the fact that given the level of Green Belt constraint facing the borough, it is extremely difficult to achieve a five-year housing land supply. However, if the Council allocate a sufficient range and type of site in various locations across the borough, including small scale Green Belt releases, then there is no reason why housing needs cannot be met quicker thus maintaining a 5-year housing land supply.
5.1.12 Gladman do not consider that the Council has sufficient evidence to justify the implementation of a stepped approach to housing delivery and therefore consider the Local Plan to be unsound in this respect.
5.2 Policy SP04: Developer Contributions
5.2.1 Whilst Gladman has no specific comments on the content of Policy SP04, we would wish to voice concern over the myriad of policies contained in the Local Plan which may have implications for development viability. Many of the policies such as Policy SP05, BE01, BE02, BE03, BE09, BE10 etc have requirements within them that will impact on the viability of development schemes. It is unclear from the evidence provided whether the cumulative impact of all of these requirements has been considered through the Viability Study, which is a requirement set out at Paragraph 34 of the Framework to ensure that such policies do not undermine the deliverability of the Plan. This gap in evidence needs to be addressed by the Council to ensure that these policies are justified.

6 RESILIENT BUILT ENVIRONMENT
6.1 Policy BE02: Sustainable Construction and Resource Efficiency
6.1.1 Gladman are concerned with part (f) of Policy BE02 as it is too onerous and goes beyond National Policy. Part (f) requires all proposals to include commercial and domestic scale renewable energy and decentralised energy as part of new development. This is an extremely onerous requirement, particularly for small schemes where it may not be technically feasible. It could also have a huge impact on development viability.
6.1.2 Paragraph 153 of the Framework allows for planning policies to require development to include decentralised energy supply. However, it also provides a caveat that this is only where it is viable and feasible. Part (f) of Policy BE02 should therefore be amended to reflect this guidance.

7 HOUSING PROVISION
7.1 Policy HP01: Housing Mix
7.1.1 Policy HP01 contains a number of development requirements which would be applied to all new development including housing mix, accessible and adaptable dwellings and self and custom build homes.
7.1.2 If the Council wishes to adopt the discretionary accessible and adaptable homes standards as a policy requirement, then this should only be done in accordance with the Revised Framework footnote 46 i.e. where this would address an identified need for such properties and where the standards can be justified. The Written Ministerial Statement (WMS) dated 25th March 2015 stated that "the optional new national technical standards should only be required through any new Local Plan policies if they address a clearly evidenced need, and where their impact on viability has been considered, in accordance with the NPPG".
7.1.3 All new homes are built to Building Regulations Part M Category 1 Standards which include such adaptions as level approach routes, accessible front doors and wider internal doors and corridors. If the Government had intended that evidence of an aging population alone justified the adoption of the higher Part M Category 2 or 3 optional standard, then these would have been incorporated as mandatory into the Building Regulations.
7.1.4 We have been unable to locate where the evidence of a need for these standards is contained within the evidence base. Without this evidence, these requirements should be removed from the Local Plan.
7.1.5 Whilst the concept of Self Build and Custom Build Housing is supported, the inclusion of plots on large scale sites does not add to the supply of houses overall (it merely changes the housing mix from one product to another). It is also difficult to assess how it will be implemented given issues around working hours, site access, health and safety etc. that are associated with large scale development sites. The percentage of provision on sites should also be determined on detailed evidence of need and the provision of these plots should also be subject to viability testing.
7.2 Policy HP06: Standards for New Housing
7.2.1 Policy HP06 requires all residential development to have to comply with the Nationally Described Space Standards (NDDS).
7.2.2 If the Council wishes to adopt the NDSS as a policy requirement, then this should only be done in accordance with the Revised Framework footnote 46 i.e. where this would address an identified need for such properties and where the standards can be justified. The WMS dated 25th March 2015 stated that "the optional new national technical standards should only be required through any new Local Plan policies if they address a clearly evidenced need, and where their impact on viability has been considered, in accordance with the NPPG".
7.2.3 We have been unable to locate where the evidence of a need for these standards is contained within the evidence base. Without this evidence, these requirements should be removed from the Local Plan.


8 CONCLUSION
8.1 Overall Conclusion
8.1.1 Critical to the success of the South Essex area will be the timely production of the JSP which will define the major growth areas to meet the housing and employment needs across the area and will inform the preparation of the individual Local Plans.
8.1.2 It is essential that through this process, the full needs for housing and employment are met in the areas that people want to live. It is also imperative that the major policy constraint of Green Belt is reviewed in a strategic manner which allows full need to be met and ensures that the new boundaries endure beyond the JSP plan period.
8.1.3 The impact of London will have a heavy influence on the future developments needs of the area and this must also be taken fully into account through the preparation of the JSP.
8.1.4 It is also considered that in order to give the JSP the weight it needs to ensure that the constituent Local Plans deliver its outcomes, the JSP should be a statutory plan which follows the requisite plan preparation process of consultation and subsequent examination.
8.1.5 Gladman have some fundamental concerns with the BLP, particularly with the identification of the level of housing need in the Plan and the implementation of a stepped approach to housing delivery, which would render the BLP unsound if they are not addressed.
8.1.6 Gladman therefore request the right to participate in any forthcoming Local Plan Examination to discuss these concerns orally.

Attachments:

Object

Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)

Representation ID: 24059

Received: 17/05/2019

Respondent: Mr Terry Haynes

Agent: Phase 2 Planning and Development Ltd

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

The plan needs to be in line with para 59 of the 2018 NPPF to boost significantly the supply of housing, including small sites. Para 68 confirms that small sites should be at least 10% of the housing requirement on sites no larger than 1ha. The Council has only 5%. With the strategic Garden Village as well, more smaller sites are needed.

Change suggested by respondent:

Add the Land at rear of Mill House Farm to plan

Full text:

1. Introduction & Background
Introduction

1.1 This Regulation 19 Local Plan representation has been prepared by Phase 2 Planning and Development Ltd on behalf of Mr Terry Haynes, on behalf of the freehold owner of the subject site on land rear of Mill House Farm, Hay Green Lane, Hook End, Brentwood, Essex, CM15 0NX as outlined by the Site Location Plan included at Appendix 1.

1.2 This submission is made under the Provisions of Regulation 19 of the Town and Country Planning (Local Planning) (England) Regulations (2012) and relates to the following sections of the Council's Pre-Submission Draft Local Plan:
- Section 4: Managing Growth
Specifically Policy SP02: Managing Growth
- Section 9: Site Allocations

Representation summary
1.3 In summary, the landowner wishes to highlight the sustainability of the proposed site on land rear of Mill House Farm, Hay Green Lane, Hook End, Brentwood, Essex, CM15 0NX (as illustrated by the Site Location Plan included at Appendix 1) to deliver much-needed new rural housing for Hook End enhancing its vitality. Please see the remainder of this supporting statement for further consideration in support of the subject site's inclusion in this emerging Local Plan strategy.

2. Soundness & Modifications
2.1 As the attached representation form confirms the landowners representations relate specifically and solely to the soundness of the draft Submission Local Plan in respect of being positively prepared, justified, effective, and consistent with national policy in relation to the following sections of the emerging Local Plan:

- Section 4: Managing Growth

Specifically Policy SP02: Managing Growth
- Section 9: Site Allocations

Soundness
Section 4: Managing Growth
Draft Policy SP02: Managing Growth
2.2 Although on the whole it is generally considered that the Council's Pre-Submission Local Plan is sound there is some concern that the Council's Housing Requirement is not fully robust.

2.3 Planning Practice Guidance (PPG) on 'Housing and economic needs assessment', which was updated on the 20th February 2019, confirms at 'Paragraph: 005 Reference ID: 2a-005-20190220' that 2014 based household projections should be used as the baseline for the 'standard method'. The reason given for this approach is to provide stability for planning authorities and communities, ensure that historic under-delivery and declining affordability are reflected, and to be consistent with the Government's objective of significantly boosting the supply of homes.

2.4 Paragraph 4.13 of the Council's Pre-Submission Draft Local Plan confirms that Council's 'housing requirement figure' to be 350 dwellings per year. With a 20% uplift, the total annual housing requirement is 456 dwellings per year.

2.5 This housing requirement has been calculated within the Strategic Housing Market Assessment, published in October 2018 (i.e. before the latest Planning Practice Guidance assessment) with this assessment confirming that the housing requirement has been calculated using the 2016 population projections as a starting point (see paragraph 8.26 of the SHMA in particular). Accordingly, the Plan cannot be considered to be fully sound on this basis.

2.6 An indicative assessment of housing need based on the Standard Method using the 2014 population projections was published in September 2017. This stated that Brentwood's housing need, based on the Standard Method, was 454 dwellings per annum. Applying the 20% uplift to this figure would result in a housing requirement of 545 homes per year, or a total of 9,262 homes during the plan period 2016-2033.

2.7 This is an increase of 1,510 dwellings from the housing requirement calculated by the SHMA calculations which uses the 2016 population projections as a starting point.

2.8 Accordingly, we consider that the Inspector should, during the Examination, request that Brentwood update its evidence base, and its housing requirement, to reflect the 2014-based population projections. This will result in the requirement to identify additional site allocations, as considered further below.

2.9 With regards to Strategic Policy SP02, therefore, it is not considered that the Brentwood Local Plan-Pre-Submission Document can be considered to be robustly sound as, in accordance with paragraph 35 of NPPF3, the Plan is not fully consistent with National Policy in its use of 2016 population projections to determine its housing requirement. In this respect, the Plan has also not been positively prepared in full as it will not, as a minimum, meet its objectively assessed needs.

Section 9: Site Allocations
2.10 The sites that the Borough Council have identified for residential development are detailed at Chapter 9 of the Pre-Submission draft Local Plan. Table 4.2 of the Local Plan identifies that the allocations total 6,088 dwellings, with the remaining dwellings comprising completions between 2016/17 & 2017/18 (363 dwellings); extant permissions (926 dwellings); and the windfall allowance between 2023-2033 (410 dwellings).

2.11 Accordingly, should the Inspector agree with our assessment that Brentwood's housing requirement is not fully sound, and the housing requirement thus increases, it would therefore be necessary to identify additional sites for allocation.
1.4 The following section of this representation provides support for land rear of Mill House Farm, Hay Green Lane, Hook End, Brentwood, Essex, CM15 0NX, to be allocated for new residential development.
1.5 Notwithstanding this, it is considered that additional sites will be required in any event to ensure the housing requirement is met. Appendix 1 of the Local Plan sets out the Council's anticipated Housing Trajectory, which we do not fully agree with. The Council's calculations of when sites will be delivered, and how many dwellings will be delivered each year, appears ambitious.
1.6 In particular, Dunton Hills Garden Village is identified as being capable of delivering 2,700 dwellings during the plan period, with the site being capable of delivering 100 dwellings starting from 2022/23 (i.e. within 3 years), and then between 150 - 300 dwellings each year thereafter.
1.7 This level of growth from such a strategic allocation does not appear realistic and no evidence has been put forward to date to support this forecast. For example, it is unlikely that the Local Plan will be adopted until 2020 at the earliest (the Council's Local Development Scheme
Page 4 C19049: Land rear of Mill House Farm, Hay Green Lane, Hook End, Brentwood, Essex, CM15 0NX


suggests that the plan would be adopted in Q3 2019, but the timescales have slipped as the Plan was due to have been submitted in Q1 2019).
1.8 For a scheme of Dunton Hills, and the level of constraints that it faces, and the vast range of application documents that would be required, including Environmental Assessment, it is realistic to assume that an outline application could take 9-12 months to be determined. Given the level of information that would be required to support the application (Consultant Reports, EA, Public/Statutory Consultation), therefore, it is realistic and reasonable to assume that it may take up to two years, from adoption of the plan in 2020, for an outline planning application to be granted planning permission.
1.9 There would then, of course, follow further applications to discharge conditions and Reserved Matters applications, none of which would be straight forward and would require similar levels of detail to an Outline Planning Application. This process could, itself, take 9-12 months, if not longer.
1.10 Accordingly, it is realistic to assume that, from adoption, it would take close to three years before planning permissions have been approved, and conditions discharged, such that development can commence on site. This would mean that, at the earliest, dwellings will not be brought forward until 2023/24, and not 2022/23 as considered by the Housing Trajectory. Such delays in the Council's Housing Trajectory will have inevitable consequences on the Local Authority being able to deliver its housing requirement during the Plan Period.
1.11 As such, it is considered that additional sites will be required during the Plan Period to ensure that a) the Local Authority is able to deliver its housing requirement during the Plan Period (notwithstanding our view that the Council has not calculated its correct requirement); and b) that additional sites will be required to allow for flexibility in allocated sites not being brought forward within the timescales identified within the Housing Trajectory.
1.12 Furthermore, it is considered that the Local Plan is not entirely sound as it does not comply fully with paragraph 68 of the National Planning Policy Framework (NPPF3) (February 2019).
1.13 Paragraph 59 of the NPPF requires Local Authorities to 'boost significantly' the supply of housing and must, "ensure choice and competition in the market for land". This involves boosting provision of housing from a variety of sources, including small sites which are suitable for smaller housebuilders.
1.14 This is reinforced by paragraph 68 of the revised NPPF, which confirms that small sites make an important contribution to meeting housing requirements and confirms that planning authorities should accommodate at least 10% of their housing requirement on sites no larger than one hectare.
1.15 The Council's housing strategy only allocates 5% on sites no larger than one hectare. The NPPF confirms that smaller sites make an important contribution to meeting housing requirement,
Page 5 C19049: Land rear of Mill House Farm, Hay Green Lane, Hook End, Brentwood, Essex, CM15 0NX


in part as they are able to be developed quickly and are able to therefore contribute towards housing supply whilst Strategic Sites are being brought forward in the background.
1.16 Accordingly, it is considered that, as identified above with the Dunton Hills Strategic Allocation, that a greater percentage of smaller sites (such as land rear of Mill House Farm, Hay Green Lane, Hook End, Brentwood, Essex, CM15 0NX) should be identified for allocation.

1.17 We would therefore request that the Local Authority reviews its housing supply, and particularly its approach to small sites, and allocate suitable smaller sites which can be brought forward early in the plan period.

Necessary modifications to make the Pre-Submission Draft Local Plan sound
1.18 With regards to Section 2, it is considered that Brentwood Borough Council will need to revisit its evidence base to determine a housing requirement which uses the 2014 population projections as a starting point. This will result in a larger housing requirement, with our estimate based on the indicative Standard Method being approximately 545 homes per year, or a total of 9,262 homes during the plan period 2016-2033.

Chapter 9 - Site Allocations & Local Development Plan Housing Trajectory
1.19 It is considered that additional sites should be allocated to ensure that the Local Authority can meet its housing requirement to 2033. Even if the Inspector agrees with the Council's objectively assessed need, it is likely that additional sites will be required to be brought forward given the Council's overly optimistic approach to its housing trajectory, particularly with regards to Dunton Hills Garden Village.
1.20 Furthermore, the Local Plan does not allocate a sufficient number of 'small sites' to contribute towards the housing requirement, as per paragraph 68 of NPPF3.
1.21 It is considered that land rear of Mill House Farm, Hay Green Lane, Hook End, Brentwood, Essex, CM15 0NX is an appropriate site for residential development and should be allocated for appropriate new residential development.
1.22 The site itself includes land directly east of Hook End and north of Wyatts Green which would continue the existing pattern of development in this location as well as extend north comprising a logical and well-contained urban extension to the village with existing residential development already neighbouring the site to the south and west. Despite this the subject site still remains of a greenfield nature situated within the Metropolitan Green Belt.

1.23 Although noted that Hook End/Wyatts Green are proposed to be classified as smaller villages within the Borough's Settlement Hierarchy the importance of allocating appropriate growth throughout the Borough cannot be underestimated. The subject site itself would be well-placed to assist in enhancing the vitality of these rural communities allowing these villages to grow and thrive, especially where there are groups of smaller settlements, with development
Page 6 C19049: Land rear of Mill House Farm, Hay Green Lane, Hook End, Brentwood, Essex, CM15 0NX


in one village able to support services in villages nearby as advocated by para 78 of NPPF3. This is particularly relevant in this instance given Hook End/Wyatt Green's physical relationship to the nearby villages of Stondon Massey and Doddinghurst as well as the village of Blackmore which itself includes some planned growth under the current Local Plan strategy.

1.24 Importantly NPPF3 also highlights at para 84 that planning policies and decisions should recognise that sites to meet local business and community needs in rural areas may have to be found adjacent to or beyond existing settlements, and in locations that are not well served by public transport. It adds at para 103 that opportunities to maximise sustainable transport solutions will vary between urban and rural areas, and this should be taken into account in both plan-making and decision-making.

1.25 Brentwood Borough Council published parts 1 & 2 of its Green Belt study in January 2018. These initial parts showed this part of Hay Green Lane lying on the southern edge of 'Parcel 48 Wyatt's Green East. The report when assessing the parcel as a whole, confirms that it makes a 'high' overall contribution to Green Belt Purposes although it is noted that the majority of this parcel is open to the east of Wyatt's Green with the subject site adjacent to the physical extent of the village to the north and much more likely to play a less substantial role in such purposes.

1.26 The Green Belt Study Part 3 - "Assessment of Potential Housing, Employment and Mixed Use Sites in the Green Belt and their Relative Contribution to the Purposes of the Green Belt Designation" - was published in November 2018, and subsequently amended in January 2019. This part of the Green Belt Study assesses the potential Site Allocations against the purposes of the Green Belt.

1.27 Our own assessment against the purposes of the Green Belt is given below.

Purpose 1: to check the unrestricted sprawl of large built-up areas: The site lies within the rural area of Hook End and is well contained by existing built development and mature trees. Development would be seen as a logical extension to the physical extent of the village and would have a very limited encroachment into the countryside. Existing site boundaries would prevent any further development into the Green Belt, with these boundaries presenting a strong and definite boundary to further development.
Purpose 2: to prevent neighbouring towns merging into one another: Development on this site would not significantly reduce the countryside gap between Hook End/Wyatts Green and nearby villages. Such countryside separation would be retained.
Purpose 3: to assist in safeguarding the countryside from encroachment: The site has no specific countryside function and would utilise a well-contained parcel of land surrounded by residential development.
Purpose 4: to preserve the setting and special character of historic towns: The site has no physical relationship with any historic town.

1.28 Accordingly, it is considered that the site is suitable to be released from the Green Belt.
1.29 Furthermore, it is noted that the Borough Council's proposed allocations allocates a number of sites within the Green Belt which the Green Belt Study confirms as making a 'moderate' contribution to the Green Belt, including:

Site R23 Brizes Corner Field, Kelvedon Hatch (23 dwellings);
Site R25 Land north of Woolard Way, Blackmore (40 dwellings); and
Site R26 Land north of Orchard Piece, Blackmore (30 dwellings).
1.30 Those sites listed above are located within villages and the rural area comparable to that of the subject site.

1.31 Accordingly, we would request that the Local Plan be modified to allocate land rear of Mill House Farm, Hay Green Lane, Hook End, Brentwood, Essex, CM15 0NX for appropriate new residential development in line with the prevailing character and density of neighbouring residential areas.

Conclusions
1.32 Based on the information set out above, it is considered that the inclusion of the subject site within the Council's proposed housing growth strategy or as an alternative reserve site would be sustainable and fully deliverable early within the Local Plan period, improving the overall soundness of the emerging Local Plan itself.

1.33 The possible low density nature of the allocation gives scope to provide a sensitively designed scheme which can be designed to integrate within and enhance the existing landscape having appropriate regard to local features and surrounding land uses, including existing neighbouring residential development.

1.34 Subsequently, the landowner contends that the relevant sections of the emerging Local Plan referred to within would be sound but could be improved further with the inclusion of this site ensuring the emerging Plan is positively prepared, effective and justified, and would be fully consistent with national policy including 'boosting significantly' the delivery of new homes within a borough that is heavily constrained by the Metropolitan Green Belt.

Inclusion of a red line boundary map for the site in question.

Attachments: