Summary:
It's stated that the Sustainability Appraisal is a "systematic process". Note that the "Site Options Appraisal Findings Table C" from the original AECOM Interim SA
(Ref: AECOM Interim SA Report, Feb 2016; http://www.brentwood.gov.uk/pdf/12022016101306u.pdf) contained "24 Appraisal Criteria". The updated AECOM Interim SA (January 2018/2019), now contains just "17 appraisal criteria". What has happened to 7 of the criteria in this systematic update; including removal of "Protected Urban Open Space" of which some sites performed poorly. I have concerns about the SA process with the criteria changing at key stages in the plan making process.
Review the 7 criteria that were dropped from 2016 to 2018, including Protected Urban Open Space" so that "apples can be compared to apples" over time. Check if including these 7 criteria would have had a significant impact on decisions made during the plan making process.
Summary:
It's stated that the Sustainability Appraisal is a "systematic process". Note that the "Site Options Appraisal Findings Table C" from the original AECOM Interim SA
(Ref: AECOM Interim SA Report, Feb 2016; http://www.brentwood.gov.uk/pdf/12022016101306u.pdf) contained "24 Appraisal Criteria". The updated AECOM Interim SA (January 2018/2019), now contains just "17 appraisal criteria". What has happened to 7 of the criteria in this systematic update; including removal of "Protected Urban Open Space" of which some sites performed poorly. I have concerns about the SA process with the criteria changing at key stages in the plan making process.