Healthcare - General Practice

Showing comments and forms 31 to 34 of 34

Comment

Preferred Site Allocations 2018

Representation ID: 20115

Received: 21/03/2018

Respondent: Community Health Partnerships (NHS)

Representation Summary:

The total cost of additional health facilities and expansion of existing facilities to support the growth identified in the strategic locations within the Local Plan based on current formula is approximately £6m. Given the capacity requirement of the existing population for healthcare services, and costs associated with providing infrastructure to meet those needs, it's likely that the costs associated with growth as identified in the Local Plan (£3m) will need to be met in full through planning contributions to ensure sufficient primary care facilities in Brentwood for the Local Plan period to 2034 to which the CIL could be charged.

Full text:

See attached.

Object

Preferred Site Allocations 2018

Representation ID: 20216

Received: 13/03/2018

Respondent: Maureen Clark

Representation Summary:

There is little indication of workable solutions to the likely increased pressure on GP services. There is no discussion of how additional pressure on hospital beds, already significant, is to be dealt with.

Full text:

See attached.

Attachments:

Object

Preferred Site Allocations 2018

Representation ID: 21230

Received: 12/03/2018

Respondent: Cllr Roger Keeble

Representation Summary:

The Deal Tree Centre is at capacity with four doctors dealing with 2,500 patients. There is no known NHS provision for an influx of new patients including those from development in Kelvedon Hatch.

Full text:

See attached.

Attachments:

Object

Preferred Site Allocations 2018

Representation ID: 22115

Received: 10/03/2018

Respondent: Corrinne Bartell

Representation Summary:

Object to the plan as it has no regard to the need for additional hospitals. Local hospitals area already over capacity and S106 contributions may provide for additional health centres but not for hospitals and it is clear that this government is not willing to provide adequate funds for the additional infrastructure that will be required.

Full text:

See attached.

Attachments: