Policy 8.2: Brentwood Enterprise Park

Showing comments and forms 31 to 38 of 38

Comment

Draft Local Plan

Representation ID: 15993

Received: 13/05/2016

Respondent: St Modwen Properties PLC

Number of people: 2

Agent: Strutt & Parker LLP

Representation Summary:

We have no issue with developments requiring a Green Travel Plan, however clarification is sought regarding how a Travel Plan is proposed to link the site with Brentwood, Shenfield, West Horndon and Dunton Hills Garden Village. If this means that the Travel Plan should consider green/sustainable links to these places, we would suggest that the policy should be reworded accordingly.

Full text:

See attached.

Attachments:

Comment

Draft Local Plan

Representation ID: 15996

Received: 13/05/2016

Respondent: St Modwen Properties PLC

Number of people: 2

Agent: Strutt & Parker LLP

Representation Summary:

Site 101A represents a new strategic employment allocation whereas the land at Codham Hall North (101B) consists of the allocation of existing employment uses. For this reason, as set out elsewhere in this representation, we consider it more appropriate to cover the requirements for site 101A within the Policy 8.2 and cover site 101B within the general employment allocations within the plan. Whilst the sites will have a complementary role this better reflects the role that these sites will play in meeting employment needs and the strategic employment provided at Junction 29.

Full text:

See attached.

Attachments:

Comment

Draft Local Plan

Representation ID: 16001

Received: 13/05/2016

Respondent: St Modwen Properties PLC

Number of people: 2

Agent: Strutt & Parker LLP

Representation Summary:

Pragraph 8.19 should use "enterprise park" rather than "business park" given the intended nature of the uses. Paragraph 8.20 amendments should be made to cover the strategic employment allocation and the allocation of the existing employment sites separately within the plan.

Full text:

See attached.

Attachments:

Comment

Draft Local Plan

Representation ID: 16074

Received: 11/05/2016

Respondent: Essex County Council

Representation Summary:

Support the ambition to develop new key strategic employment sites but this needs to be set within the wider context of Brentwood's Spatial Strategy, and any location is consistent with the criteria in Policy 8.3 - Employment Development Criteria and Policy 10.1 - Sustainable Transport, which seeks to ensure future developments are located in accessible locations reducing the need to travel.

Full text:

See attached

Attachments:

Comment

Draft Local Plan

Representation ID: 16212

Received: 17/05/2016

Respondent: S Walsh and Sons Ltd

Agent: JTS Partnership LLP

Representation Summary:

Whilst the provision of additional employment space is supported, the Council need to justify the allocation of the former M25 Works Site. It is understood that the M25 works site was created as a temporary facility under the General Permitted Development Order and the Highways Act 1980 and has a requirement to be returned to its original state at the completion of the works, which ceased several years ago and the land should now be in agricultural use. As such, the site should not be considered or referred to as 'previously developed' or brownfield land within the Local Plan.

Full text:

See attached.

Attachments:

Comment

Draft Local Plan

Representation ID: 16213

Received: 17/05/2016

Respondent: S Walsh and Sons Ltd

Agent: JTS Partnership LLP

Representation Summary:

It is also questioned why Land at Codham Hall 101B is being put forward for allocation and additional expansion of the industrial site within the Green Belt, whereas sites such as East Horndon Hall Industrial Estate have not even been allocated for employment purposes. In regard to its impact on the purposes of the Green Belt, the Council's published assessment results in a similar overall assessment between the two sites. It is considered that consistency should be made by the Council in their consideration of employment sites, particularly where there is little difference between the impacts of the allocation on the Green Belt purposes.

Full text:

See attached.

Attachments:

Object

Draft Local Plan

Representation ID: 16337

Received: 18/05/2016

Respondent: London Borough of Havering

Agent: London Borough of Havering

Representation Summary:

Object to the Enterprise Park for potentially significant transport implications and adverse impact on Havering's section of the A127 which is already at or close to capacity in the peak periods in both directions. Concerned about the adverse impact on the green belt. Whilst it is noted that the site has been previously developed, the proposal will significantly increase the quantum of development on the site and therefore impact on the function of the green belt and its openness.

Full text:

See attached.

Attachments:

Object

Draft Local Plan

Representation ID: 16482

Received: 19/05/2016

Respondent: CPREssex

Agent: Campaign for the Protection of Rural England (CPRE) Brentwood Branch

Representation Summary:

The area lies entirely within the green belt area. The Council have allowed their two "quadrants" to be degraded by creeping industrialization both north and south of the A127 on land owned by Codham Hall Farm. Should development go forward, a scheme of permanently evergreen screening tree species and landscaping will need to accompany this.

Full text:

See attached.

Attachments: